NIMA SYSTEMS ENGINEERING SERVICES

(NSES)

NMA202-97-R-0001

APPLICABLE DOCUMENTS LIST

STATEMENT OF WORK

2.0 APPLICABLE DOCUMENTS

National Imagery and Mapping Agency (NIMA) Systems Engineering

Management Plan (SEMP). Draft version 2.0, 31 December 1996 (WL)

USIGS Program Implementation Directive (PID) (draft, 11 Feb 97) (WL)

IDRD Program Office - DMA Requirements Document (RL)

IF30J08 DMA-IGS ICD (WL)

IF300EAA CIO to National Source Program ICD (WL)

S2025 Tape format Requirements Document (TFRD) (WL)

S3007B EIS System Integrated Test Plan (SITP) (WL)

MARK 90 ICDs (RC)

E01-2124 EIS Requirements Flow-Down (FL)

EIF 14900 IDTS Interface Control Document (FL)

IF20J08A DMA-IGS ICD (CML)

IF200EAA CIO to National Source Program ICD (CML)

IF20818A GS to DMA Segment (WL)

IF300EAA CIO to National Source Program ICD (E300) (CML)

IF30818 IGS to DMA Segment (E300)S2025A/P Tape Format Requirements Document (TFRD) (WL)

S2007A/P System Integrated Test Plan (SITP) (WL)

S1022A Joint Configuration management plan (WL)

IPA to NDS ICD, IFIPA09 (WL)

DP/F to IDEX Facilities ICD, IF20522A (WL)

NPIC to IDEX ICD, IF20922A (WL)

DoD Host Data Base Systems to IDEX II Facility ICD, IF20K22A (WL)

Fleet Imagery Support Terminal (FIST) to IDEX Facilities ICD, IF20L22A (WL)

IDEX II Remote Locations ICD, IF20N22 (WL)

IDEX II to SIDS ICD, IF 20P22 (WL)

IDEX to LCWS ICD, IF20U22 (WL)

IDEX Joint Segments Requirements Document, S2220C (WL)

IDEX System Integrated Test Plan (SITP), S20071 (WL)

DDS EPS to RS ICD, IF20D08A (WL)

User's Concept of Operations for A3I, CIO2052 (WL)

NITF Implementation Requirements Document, S2035A (CML)

NIMA Library Requirements Document (NLRD) v.3 (WL)

PS Requirements Document, DDS-III, PSRD-IIIA (WL)

Tape Format Requirements Document (for DDS), DDS-RETFRDD-B, DDS-RLMTFRD-A, DDS-RLTFRD-A (WL)

Vector Product Format SRD, VPFPS-SRD (FL)

IESS Requirements Document for PA3I, IPA-008-94 (WL)

Systems Integrated Test Plan for DoD Systems, Appendix for PA3I, S2008A, Appendix 10.2 (RL)

Imagery Access Services (IAS) Specification, 13 March 1997, CIO-2068 (WL)

Common Imagery Interoperability Profile (CIIP) for Imagery Access, 13 March 1997, CIO-2069 (WL)

USIS Standards Profile for Imagery Distribution, v3, 13 October 1995, CIO-2019 (WL)

USIS Standards Profile for Imagery Archives, v1, 20 July 1994, CIO-ASD-SIA-O594-000 (WL)

NIMA and Rome Laboratory JRD for USIGS 2000 A3I, v1.1, 25 March 1997, NRLJRD (WL)

CIO-IMINT JRD for USIS 2000A3I, CIO-2042 (WL)

2.0 APPLICABLE DOCUMENTS CON'T

A3I JRD between the CIO and DISA, CIO-2046 (WL)

A3I JRD between the CIO and DARO, CIO-2044 (WL)

A3I Requirements Document, rev 2.0, 7 May 1996, CIO-2054 (WL)

Front-End Processing Environment (FPE) Specification (E3800) (RL)

Front-End Processing Environment (FPE) ICD (EIF 19038) (RL)

Mil-Std 498, Military Standard Software Development, 5 December 1995 (WL)

NIMA Configuration Management Plan (NCMP), 25 March 1997 (WL)

Security Policy Manual for A3I, CIO-2058 (WL)

A3I/EI Security Plan, CIO-2049 (WL)

NIMA Master Schedule (RC)

DMA to IMINT Requirements Document, DCRD-A (WL)

National Imagery Transmission Format (NITF) v2.0, MIL-STD-2500B (WL)

Military Handbook, NITFS, MIL-HBK-1300 (WL)

Tactical Communications Protocol 2 (TACO2) for the NITFS, 18 June 1993, MIL-STD-2045-44500 (WL)

Joint Photographic Experts Group (JPEG) Image Compression for the NITFS, (WL)

15 December 1993, MIL-STD-188-198A

Computer Graphics Metafile (CGM) Implementation Standards for the NITFS, 18 June 1993, MIL-STD-230 (WL)

Adaptive Recursive Interpolated Differential Pulse Code Modulation (WL)

(ARID PCM) Compression Algorithm for the NITFS, 12 October 1994, MIL-STD-188-197A

Vector Quantization Decompression for the NITFS, 27 June 1984, MIL-STD-188-199 (WL)

Bi-level Image Compression for the NITFS, 18 June 1993, MIL-STD-188-196 (WL)

IDEX II Transition Integration Plan (TIP), S2022A (NL)

IDEX II Classification Guide (NL)

Data Architecture and Gateway Services (DAGS) Requirements Document, v 2.0, 13 March 1997, NMA100-97-C-5001 (WL)

A3I/EI Project Manager's Charter (WL)

DoDD 5105.60, Establishment of NIMA as Combat Support Agency of the Department of Defense 11 October 1996 (WL)

DoDD 5000.1, Defense Acquisition (WL)

DoDD 5000.2-R, Mandatory Procedures for Major Defense Acquisition Programs and Major Automated Systems Acquisition (WL)

National Imagery and Mapping Agency - Business Plan - 1997 (WL)

SEMP comparison to Software Engineering Institute Capability Maturity Model (SEI-CMM), 16 October 1996 (WL)

Carnegie Mellon University, Software Engineering Institute, 'A Systems Engineering Capability Maturity Model, Version 1.1 (SE-CMM) November 1995 (WL)

DMA List of Products and Services, DMAL 805-1A, March 1994 (RL)

DMA Software Measurement and Metric Analysis Handbook - SMMAH (FL)

DMA Software Development and Maintenance Engineering Guidebook -DSDAMEG (FL)

IMINT Program Schedules, IPS and IPS-U (RL)

DPS Documents (all volumes, all appendices) (FL)

E1005 MPS Data Format Specification (FL)

E1010 Product Specification Index (FL)

E1011 Coordinates, Definitions and Notations (FL)

E9000 MK90 System Specification (FL)

E9005 Rules Specification for the MK90 System (FL)

E9300 PG/S Specification for the MPS (FL)

EIF19034 MK90 Segments to Production Center ICD (FL)

EIF19095 MK90 Data Services System ICD (FL)

2.0 APPLICABLE DOCUMENTS CON'T

EIF9097 MK90 Production Management System ICD (FL)

VPF Documents (All volumes, all appendices)

System Requirements Document (FL)

System Design Document (GIL)

VPF Military Standard (GIL)

VPF Military Specs (Vmap (0, 1, 2), UVMap, WVSPlus, (FL)

VITD, DTOP, DNC, VPF Database Update (VDU) (RL)

DCAFE Documents (all volumes, all appendicies)

System Requirements Document (WL)

System Design Document (GIL)

Verification Traceability Matrix (GIL)

Software CSCIs (GIL)

SUE Master Program Schedule (RL)

NIMA Mapping Systems Interface Control Document (ICD) (GIL)

USIS Architecture and associated documentation (WL)

MOU Between Rome Laboratory and CIO, 20 September 1995 (unnumbered) (WL)

MOU Between CIO and Defense Dissemination for A3I, 25 September 1995 (unnumbered) (WL)

MOU Between CIO and DMA, 24 August 1995 (unnumbered) (WL)

MOU Between CIO and NRO, IMINT Directorate, 14 March 1995 (unnumbered) (WL)

MOU Between CIO and the DARO, 8 August 1995 (unnumbered) (WL)

Demo Plan for APMO, CIO-2060 (WL)

Training Management Plan for A3I, CIO-2058 (WL)

USIS Implementation Guidance for IMINT Associated Pilot A3I Funding, IMINT-IGD (WL)

IMINT-CIO Pilot A3I Requirements Document (no control #) (WL)

INTELINK Access to IPA Detailed Requirements Document, IPA-001-95 (WL)

USCENTCOM Digital Imagery Architecture RD for PA3I, IPA-007-94 (WL)

PA3I System Description Document (SSD), Rev.3, January 1996 (WL)

IPA Requirements Document for PA3I, IPA-009-94 (WL)

MOU Between CIO/APMO and the CIA/OD, 13 May 1995 (unnumbered) (WL)

MOU Between CIO/APMO and the NPIC, 20 May 1996 (WL)

MOU Between CIO/APMO and the AIC, 2 May 1996 (WL)

MOU Between CIO/APMO and the NGIC, 4 June 1996 (WL)

MOU Between CIO/APMO and the DIA, 21 June 1996 (WL)

MOU Between CIO/APMO and the XVIII Airborne Corps, 15 July 1996 (WL)

MOU Between CIO/APMO and MSIC, 14 August 1996 (WL)

Reference Table:

FL = Fremont Library (301) 227-3910 Eugene Bruce

WL = Westfields Library (703) 808-0893 Tomasena Ellis

CML = CM Library Erskine Hall (301) 227-5106 Pat Davidson

GIL = GIDT Library Erskin Hall (301) 227-5095 Ruth Mazzella

RL = Reston Library (703) 264-2156 Kim Mattews

NL = Newington Library (703) 541-4276 Jim MacGregor