FY98 Program Element Descriptive Summaries / RDDS

0204163N Fleet Communications

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7

PROGRAM ELEMENT: 0204163N

PROGRAM ELEMENT TITLE: Fleet Communications

(U) COST: (Dollars in Thousands)
PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

X0725 Communication Automation
825 1712 1650 3152 3175 3250 3320 3396 CONT CONT
X2074 Communications Support Systems
5,041 3,418 4,209 6,596 6,830 4,958 4,530 4,584 CONT CONT
X1083 Shore to Ship Communications System
*14,603 13,334 12,982 12,767 8,426 7,963 7,011 7,167 CONT CONT
X0795 Support of MEECN
691 674 495 774 796 789 807 827 CONT CONT
TOTAL 21,160 19,138 19,336 23,289 19,227 16,960 15,668 15,974 CONT CONT

*Assumes an erroneous reduction which was the result of a double posting error for a BTR adjustment.

(U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Communication Automation program developed an anti-jam radio system incorporating shipboard interfaces, interface mitigation, radio frequency distribution (including antennas), high speed burst data transmission and relocatable Very High Frequency (VHF) relay. The Communications Support Systems (CSS) develops the architecture for an integrated Navy communication system for Ship-to-Shore and Shore-to-Ship communications defined as the Copernicus TADIXS and prototypes early operational capabilities and incremental implementation and fielding of CSS capabilities. The Shore to Ship Communications System develops communications systems elements which provide positive command and control of deployed ballistic missile submarines (SSBNs). Minimum Essential Emergency Communications Network (MEECN) is the Tri-Service transmission system which ensures delivery of Emergency Action Messages (EAM) to our strategic platforms.

(U) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under OPERATIONAL SYSTEMS DEVELOPMENT because it encompasses engineering and manufacturing development for upgrade of existing, operational systems.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION

(U) COST: (Dollars in thousands)
PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

X0725 Communication Automation
825 1712 1650 3152 3175 3250 3320 3396 CONT CONT

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: Communication Automation. This project is a continuing program that provides for automating and communications upgrades for Fleet Tactical Communications. Navy Modular Automated Communications System (NAVMACS) automates the message receiving, distribution and preparation functions aboard ships.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($825) NAVMACS: Continued migration of NAVMACS software to Multi-level Secure Operating System. Continued integration and planning efforts of NAVMACS into Defense Message System (DMS) Architecture. Continued accommodation of emergent required interfaces with other shipboard equipment including both LAN and Command, Control, and Communications (C3) systems and Automated Digital Network System (ADNS).

2. (U) FY 1997 PLAN:

(U) ($815) NAVMACS: Continue DMS Tactical Afloat efforts. Continue accommodation to C3 technology to include ADNS. Integrate to TAC-4 hardware. Begin development of connectionless protocols to support Tactical DMS Afloat. Begin integration and test and evaluation of DMS components. Develop limited DMS (UNCLAS) point-to-point protocol. Integrate, test & evaluate SSIXS protocol.

(U) ($854) Develop connectionless protocols and time-shared link protocol to support DMS over various RF paths to include UHF LOS.

(U) ($43) Portion of extramural program reserved for Small Business Innovation Research assessment in accordance with 15U.S.C.638.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION

(U) COST: (Dollars in thousands)

3. (U) FY 1998 PLAN:

(U) ($1,650) NAVMACS: Continue DMS Tactical Afloat efforts. Test and Evaluation of DMS protocols. Continue integration of DMS components. Develop interfaces for classified DMS (MISSI Guards). Establish full message profiling. An additional $156K is forward financed with FY 1997 funding due to low expenditures in FY 1996.

4. (U) FY 1999 PLAN:

(U) ($3,152) NAVMACS: Continue DMS Tactical afloat efforts. Continue accommodation to emergent technology. Integrate Broadcast DMS (X.400 protocol). Begin TAC-5 hardware integration and test & evaluation. Initiate "Smart Push - Warrior Pull" features.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget 846 1,784 1,812 3,181

(U) Adjustments from FY 1997 PRESBUDG: -21 -72 -162 -29

(U) FY 1998 President's Budget Submit: 825 1,712 1,650 3,152

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 reduction of $21K reflects other minor Navy Fiscal adjustment. FY 1997 decreased $72K for congressional undistributed general adjustments. FY 1998 reduction of $2K for NWCF rate adjustments, $4K for inflation and $156K reduction due to an adjustment for poor execution. FY 1999 reduction of $3K due to Navy programmatic adjustment, $14K due to NWCF rate adjustments, and $12K reduction for inflation.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)
NUMBER TITLE FY 1996

ESTIMATE

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002 ESTIMATE FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

(U) OPN Line 3050 Ship Comm Automation (NAVMACS Project Unit)
0 5,275 5,521 27,323 36,297 22,588 30,885 31,574 CONT CONT

(U) RELATED RDT&E: Not Applicable.

(U) SCHEDULE PROFILE: Not Applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION
A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
PROJECT COST CATEGORIES FY 1996 FY 1997 FY 1998 FY 1999
a. Software Development 825 1,712 1,650 3,152
TOTAL 825 1,712 1,650 3,152

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS

OTHER
Contractor/Government Performing Activity Contract Method/Fund Type Vehicle Award/Oblig Date Perform Activity EACProject Office EAC Total FY 1995 & PriorFY 1996 Budget FY 1997 Budget FY 1997 Budget FY 1998 Budget To CompleteTotal Program
Harris CPFF 5/92 14,855 14,855 11,475 1,960 1,420 0 0 0 14,855
Melbourne, FL Contractor XYZ TBD TBD TBD TBD 0 0 0 1,502 1,991 CONT CONT
San Diego, CA NRaD WX VAR VAR VAR 6,982 812 1,337 1,545 2,505 CONT CONT
Charleston, SC NISE E WX VAR VAR VAR 0 2,132 600 602 1,364 CONT CONT
VAR VAR VAR VAR 8,503 137 61 560 736 CONT CONT
Product Development
Misc Contracts Various Various N/A N/A 0 684 714 981 635 CONT CONT
Misc Labs WX 10/95 N/A N/A 0 141 123 105 135 CONT CONT
TBD TBD TBD N/A N/A 0 0 0 0 1,130 CONT CONT
Support and Management N/A
Test and Evaluation
TBD TBD TBD N/A N/A 0 0 510 274 745 CONT CONT
NISE EAST WX 10/96 1,162 1,162 0 0 365 290 507 CONT CONT
Charleston, SC

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0725

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: COMMUNICATION

AUTOMATION

GOVERNMENT FURNISHED PROPERTY - Not applicable
FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total
& Prior Budget Budget Budget Budget Complete Program
Subtotal Product Development 0 825 837 1,086 1,900 CONT CONT
Subtotal Support and Management 0 0 0 0 0 0 0
Subtotal Test and Evaluation 0 0 875 564 1,252 CONT CONT
Total Project 0 825 1,712 1,650 3,152 CONT CONT

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)

(U) COST: (Dollars in thousands)
PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

X2074 Communication Support Systems
5,041 3,418 4,209 6,596 6,830 4,958 4,530 4,584 CONT CONT

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project is an initiative to develop the Copernicus architecture and implementation concept, an integrated Navy information system architecture based on shared use of links and multimedia networks. It will provide increased communication survivability, throughput and security. The Copernicus system concept will further integrate the approach to research, development, acquisition and deployment of a total Command, Control and Communications Intelligence (C3I) system supporting Navy missions. The work to be performed is a system engineering effort that generates engineering solutions and guidelines, prototyping and early operational capabilities, and transition plans for incremental fielding involving all current and planned Navy communication systems.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($1,331) Incrementally designed, implemented, and tested CSS Common Operating Environment (COE) interface to the Joint Maritime Command Information System (JMCIS).

(U) ($1,483) Supported upgrade, prototype, test, and installation of CSS Increment One.

(U) ($2,227) Built, prototyped, tested, and demonstrated further CSS (User Interface Segment (UIS), Platform Distribution Segment (PDS), Control and Management Segment (CMS), and Channel Access Protocols (CAPs), Increments including Military Internet with Multicast (MIM) and Inter Force Radio Frequency Network (IFRFN).

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)

2. (U) FY 1997 PLAN:

(U) ($1,592) Initiate architectural and system engineering efforts leading to incremental design and implementation of CSS and JMCIS integration in accordance with the phased Copernicus...Forward, Naval C4I Implementation Plan.

(U) ($769) Support fielding of Joint Maritime Communications System (JMCOMS) Build 1.

(U) ($1,013) Build, test and demonstrate JMCOMS Builds 2 and 3 including implementation\testing IF RF network.

(U) ($44) Portion of extramural program reserved for Small Business Innovation Research assessment in accordance with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

(U) ($2,027) Continue architectural and system engineering efforts leading to incremental design and implementation of CSS and JMCIS integration in accordance with the phased Copernicus...Forward, Naval C4I Implementation Plan.

(U) ($400) Publish derived Copernicus system requirements.

(U) ($700) Support field of JMCOMS Build 2.

(U) ($1,082) Build, test and demonstrate JMCOMS Build 3.

4. (U) FY 1999 PLAN:

(U) ($2,789) Continue architectural and system engineering efforts leading to incremental design and implementation of CSS and JMCIS integration in accordance with the phased Copernicus...Forward, Naval C4I Implementation Plan.

(U) ($500) Define and prototype key services of Defense Information Infrastructure (DII) COE.

(U) ($1,400) Support fielding of JMCOMS Build 3.

(U) ($1,907) Build, test and demonstrate JMCOMS Build 4.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget 5,132 3,563 2,951 2,927

(U) Adjustments from FY 1997 PRESBUDG: -91 -145 +1,258 +3,669

(U) FY 1998 President's Budget Submit: 5,041 3,418 4,209 6,596

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 decreased by $91K reflects other Minor Navy adjustments. FY 1997 adjustments reflect a decrease of $145K for Congressional undistributed general adjustment. FY 1998 adjustments reflect an increased of $1,400K for BRAC correction and reductions of $97K for NWCF rate adjustments, $11K for inflation and $34K for rebalance. FY 1999 adjustments reflect an increased of $3,800K for BRAC correction, and reductions of $104K for NWCF rate adjustment, $24K for inflation, and $3K for rebalance.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: PE 0205604N (Tactical Data Links)

PE 0303109N (Satellite Communications)

PE 0303140N (Information Systems Security Plan)

D. (U) SCHEDULE PROFILE: Not applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)

(U) PROJECT COST BREAKDOWN: ($ in thousands)

Project Cost Categories FY 1996 FY 1997 FY 1998 FY 1999

a. Software Development 1,390 946 1,336 2,710

b. Research Support Equipment 398 325 383 535

c. System Engineering 1,794 1,057 1,217 1,997

d. Technical Data 1,335 987 1,148 1,207

e. Licences 56 30 50 67

f. Misc/travel 68 73 75 80

Total 5,041 3,418 4,209 6,596

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS

Contractor/Government Performing Activity Contract Method/Fund Type Vehicle Award/Oblig Date Perform Activity EACProject Office EAC Total FY 1995 & PriorFY 1996 Budget FY 1997 Budget FY 1997 Budget FY 1998 Budget To CompleteTotal Program
Product Development:
Harris CPFF 5/92 14,855 14,855 11,475 1,960 1,420 0 0 0 14,855
Melbourne, FL Contractor XYZ TBD TBD TBD TBD0001,5021,991CONTCONT
San Diego, CA NRaD WX VARVARVAR6,982 812 1,337 1,5452,505CONTCONT
Charleston, SC NISE E WX VAR VAR VAR 0 2,132 600 602 1,364CONT CONT
OTHER VAR VAR VAR VAR 8,503 137 61 560736 CONT CONT

Support and Management: Not Applicable.

Test and Evaluation: Not applicable.

GOVERNMENT FURNISHED PROPERTY - Not applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X2074

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Communications

Support Systems (CSS)
Total FY 1995 & PriorFY 1996 BudgetFY 1997 BudgetFY 1998 Budget FY 1999To CompleteTotal Program
Subtotal Product Development 26,9605,041 3,418 4,209 6,596 CONT CONT
Subtotal Support and Management 0 0 0 0 0 0 0
Subtotal Test and Evaluation 0 0 0 0 0 0 0
Total Project26,960 5,041 3,418 4,209 6,596 CONT CONT

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

(U) COST: (Dollars in thousands)
PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

X1083 Shore to Ship Communication Systems
*14,603 13,334 12,982 12,767 8,426 7,963 7,011 7,167 CONT CONT

*Assumes an erroneous reduction which was the result of a double posting error for a BTR adjustment.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project develops communications systems elements which provide positive command and control of deployed of ballistic missile submarines (SSBNs). This program provides enhancements to the shore-to-ship transmitting systems, shipboard receiver systems, and development of the Submarine Low Frequency (LF)/Very Low Frequency (VLF) Versa Module Eurocard (VME) Receiver (SLVR) System (formerly the Advanced VLF/LF VME (AVR/VME) receiver system). Continuing evaluation of this communications system is provided via the Strategic Communications Assessment Program (SCAP). Fixed VLF/LF develops an energy efficient, solid state, power amplifier for the VLF shore based transmitters of the Submarine Broadcast System, investigates improvement of the radio frequency high voltage insulators bushings and antenna components used in these stations through the High Voltage Insulator Program (HVIP) and measures and signal propagation through the Coverage Prediction Improvement Program (CPIP).

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($640) Installed SSPAR at Naval Radio Transmitting Facility (NRTF), Jim Creek.

(U) ($262) HVIP insulator/bushing development and test.

(U) ($5,103) Completed SLVR Lab testing and performed OP assessment.

(U) ($3,247) Completed SSPAR E&MDM hardware/software integration and factory test.

(U) ($1,253) Continued SLVR Communications Support System (CSS) phase I integration.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

(U) ($3,744) Continued SCAP and conducted continuing evaluation of strategic communications (CEP).

(U) ($404) Completed VLF Test bed analysis.

(U) (-$50) Reflects an erroneous reduction which was the result of a double posting for a BTR adjustment.

2. (U) FY 1997 PLAN:

(U) ($317) High Voltage and antenna component development and test.

(U) ($8,210) Complete SLVR TECHEVAL/OPEVAL.

(U) ($750) Complete SSPAR E&MDM on site training.

(U) ($267) Complete SLVR CSS Phase I integration. (

(U) ($3,586) Continue SCAP and CEP.

(U) ($204) Portion of extramural program reserved for Small Business Innovation Research assessment in

accordance with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

(U) ($350) Continue high voltage and antenna component development and test.

(U) ($7,563) Conduct Follow-on Test and Evaluation (FOT&E) of SLVR, integration and test of the KG-38 replacement and begin SLVR P3I.

(U) ($1,445) Begin CSS Phase II integration.

(U) ($3,624) Continue SCAP and conduct continuing evaluation of CEP.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

4. (U) FY 1999 PLAN:

(U) ($370) Continue high voltage and antenna component development and test.

(U) ($7,597) Complete SLVR P3I efforts.

(U) ($885) Continue CSS Phase II integration.

(U) ($3,915) Continue SCAP and conduct continuing evaluations of CEP.

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget 15,059 13,963 14,096 12,979

(U) Adjustments from FY 1997 PRESBUDG: -456 -629 -1,114 -212

(U) FY 1998 President's Budget Submit: 14,603 13,334 12,982 12,767

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 reduction of $406K for other minor Navy fiscal adjustments and $50K erroneous reduction due to double posting. FY 1997 decreased $629K for Congressional undistributed general adjustment. FY 1998 reduction of $16K due to reduction in CSS Phase II integration for SLVR, $1011K NWCF rate adjustments, $33K for inflation, $9K for NWCF activites, $45K for rebalance. FY 1999 reduction of $14K due to reduction in CSS Phase II integration for SLVR, $174K are due to NWCF rate adjustments, $47K for inflation, $4K for rebalance. FY 1999 increased $27K for NWCF RDT&E activities.

(U) Schedule: SLVR MSIII slipped as a result of software design issues involving Fiber Data Distributed Interface and timing interfaces which have now been resolved.

(U) Technical: Not applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)
NUMBER TITLE FY 1996 ACTUAL FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

(U) OPN Line 3107 Shore LF
4,159 4,140 7,795 16,429 19,809 19,680 19,922 4,400 CONT CONT
(U) OPN Line 3147 Advanced VLF Receiver
0 0 7,675 18,566 20,972 19,140 3,000 0 CONT CONT
(U) O&M,N
23,273 26,190 26,392 26,231 19,798 18,733 19,143 19,561 CONT CONT

(U) RELATED RDT&E: Not applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

D. (U) SCHEDULE PROFILE:

FY 1996 FY 1997 FY 1998 FY 1999

Program

Milestones 2Q SLVR MS III

Engineering

Milestones

T&E 3Q SLVR TECHEVAL

Milestones 3Q SLVR OPEVAL

Contract

Milestones

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
PROJECT COST CATEGORIES FY 1996 FY 1997 FY 1998 FY 1999
a. Project Management 2,615 2,240 2,200 2,100
b. Systems Engineering 3,189 2,962 3,406 2,871
c. Software Development 1,796 2,110 2,000 2,000
d. Hardware Development 4,079 1,357 1,000 1,796
e. System Test & Evaluation 1,907 2,481 2,676 2,400
f. Integrated Logistic Spt 647 1,524 1,000 800
g. Site/Platform Integration 420 660 700 800
TOTAL *14,653 13,334 12,982 12,767

*Assumes correction of the erroneous posting reduction (-$50K).

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS
Contractor/

Government

Performing

Activity

Contract

Method/

Fund Type

Vehicle

Award/

Oblig

Date

Perform

Activity

EAC

Project

Office

EAC

Total

FY 1995

& Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 1999

Budget

To

Complete

Total

Program

Product Development
U.S. Army WX 2/96 N/A N/A 1,656 1,091 650 77 30 CONT CONT
Monmouth, NJ
Misc Contracts Various Var N/A N/A 628 1,077 818 903 741 CONT CONT
APL/JHU CPFF 10/95 N/A N/A 1,114 3,984 3,586 3,624 3,915 CONT CONT
Baltimore, MD
NCCOSC NRaD WX 10/95 N/A N/A 11,453 3,602 6,021 7,479 7,416 CONT CONT
San Diego, CA
ROCKWELL CPFF 12/93 11,287 11,287 6,608 3,505 500 0 0 0 10,613
Richardson, TX
Miscellaneous Labs Various 10/95 N/A N/A 581 316 660 576 335 CONT CONT

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X1083

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: Shore to Ship Communication Systems

Contractor/

Government

Performing

Activity

Contract

Method/

Fund Type

Vehicle

Award/

Oblig

Date

Perform

Activity

EAC

Project

Office

EAC

Total

FY 1995

& Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 99

Budget

To

Complete

Total

Program

Support and Management
Miscellaneous Various 10/95 866 866 0 646 316 323 330 0 1,615
Test and Evaluation
Miscellaneous Various 10/95 1,215 1,215 0 432 783 0 0 0 1215

GOVERNMENT FURNISHED PROPERTY: Not applicable.
FY 1995

& Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 1999

Budget

To

Complete

Total

Program

Subtotal Product Development 22,040 13,575 12,235 12,659 12,437 CONT CONT
Subtotal Support and Management 0 646 316 323 330 0 1,615
Subtotal Test and Evaluation 0 432 783 0 0 0 1215
Total Project 22,040 *14,653 13,334 12,982 12,767 CONT CONT

*Assumes correction of the erroneous posting reduction (-$50K).

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0795

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: MEECN

(U) COST: (Dollars in thousands)
PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003 ESTIMATE TO

COMPLETE

TOTAL

PROGRAM

X0795 MEECN
691 674 495 774 796 789 807 827 CONT CONT

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: Support of Minimum Essential Emergency Communications Network (MEECN). MEECN is the Tri-Service transmission system which ensures delivery of Emergency Action Messages (EAMs) to our strategic platforms. Because of substantial downsizing in the number of MEECN assets, such as the CINC Airborne Command Post (ABNCP) fleet, it is necessary to improve the range, timeliness and reliability of MEECN communications to maintain connectivity to the platforms. This project identifies, researches, and develops improvements to the MEECN primarily in the Very Low Frequency and Low Frequency (VLF/LF) ranges of MEECN. The MEECN Message Processing Mode (MMPM), which reduces transmission time while improving message delivery reliability at greater ranges, was developed under this project and is being implemented in the MEECN VLF/FL Systems. The new High Data Rate (HIDAR) mode, which greatly reduces message transmission time while providing the performance of low data rate modes, has been deployed. Potential improvements in mode design and signal processing are continually being investigated for MEECN application.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($184) EVS SV 7.6, which provided HIDAR and 3-Mode Automatic Mode Recognition (AMR) became operational; issued EVS 7.7 to correct a deficiency in the 3-Mode AMR.

(U) ($106) HIDAR implementation in SLVR completed.

(U) ($262) Issued HIDAR Mode Standard for Multi-Channel Receivers (e.g., Modified Miniature Receive Terminal (MMRT)).

(U) ($75) NONAP optimized for HIDAR.

(U) ($64) Issued the initial version of the wideband atmospheric noise data base.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0795

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: MEECN

2. (U) FY 1997 PLAN:

(U) ($237) Develop integrated NONAP and signal separator AJ algorithm.

(U) ($102) Investigate HIDAR/Block II compatibility.

(U) ($71) Document HIDAR Signal Design.

(U) ($106) Support EVS HIDATR upgrade software release.

(U) ($76) Support KG-38 replacement development.

. (U) ($70) Support SLVR MMPM and HIDAR implementation certifications.

(U) ($12) Portion of extramural program reserved for Small Business Innovation Research (SBIR) assessment in accordance with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

(U) ($100) Support HIDAR implementation in MMRT for TACAMO aircraft.

(U) ($133) Implement and test integrated NONAP and signal separator AJ algorithm.

(U) ($122) Initiate development of MEECN Mode Frequency Scanning as P3I for SLVR.

(U) ($73) Support MMRT MMPM and HIDAR implementation certification.

. (U) ($67) Continue data collection and analysis for inclusion in the wideband atmospheric noise data base. An additional $189K is forward financed with FY 1997 funding due to low expenditures in FY 1996.

1. (U) FY 1999 PLAN:

(U) ($193) Support implementation of MEECN Mode Frequency Scanning in SLVR.

(U) ($71) Continue the wideband atmospheric noise base effort.

(U) ($237) Investigate the application of newly emerging error detection and correction (EDAC) algorithms for application to the MEECN Modes.

(U) ($273) Update the MEECN Integrated Test Bed to reflect modifications made to the MEECN Modes and to take advantage of technology improvements in processor speed and memory density.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0795

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: MEECN

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget 702 703 746 836

(U) Adjustments from FY 1997 PRESBUDG: -11 -29 -251 -62

(U) FY 1998 President's Budget Submit: 691 674 495 774

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 reduction of $11K reflects other minor Navy adjustments. FY 1997 decreased $29K for Congressional undistributed general adjustment. FY 1998 reduction of $51K for Navy decisions, $7K for NWCF Rate adjustment, $1K for inflation, $3K due to rebalance, and $189K due to an adjustment for poor execution. FY 1999 reduction of $58K is for Navy decisions, $3K for inflation, and $1K for NWCF rate adjustment.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)

(U) RELATED RDT&E: Not applicable.

D. (U) SCHEDULE PROFILE: Not applicable.

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0795

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: MEECN

A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
PROJECT COST CATEGORIES FY 1996 FY 1997 FY 1998 FY 1999
a. Project Management 691 674 495 774
TOTAL 691 674 495 774

FY 1998/FY 1999 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204163N PROJECT NUMBER: X0795

PROGRAM ELEMENT TITLE: Fleet Communications PROJECT TITLE: MEECN

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)
PERFORMING ORGANIZATIONS
Contractor/

Government

Performing

Activity

Contract

Method/ Fund Type

Vehicle

Award/

Oblig

Date

Perform

Activity

EAC

Project

Office

EAC

Total

FY 1995 & Prior

FY 1996

Budget

FY 1997

Budget

FY 1998

Budget

FY 1999

Budget

To

Complete

Total

Program

Product Development
Misc Contracts Various Various N/A N/A 795 454 599 435 615 CONT CONT
Misc Labs WX 10/97 N/A N/A 418 237 75 60 159 CONT CONT
Support and Management: Not Applicable.
Test and Evaluation: Not Applicable.

GOVERNMENT FURNISHED PROPERTY - Not applicable.
FY 1995 & Prior FY 1996 Budget FY 1997 Budget FY 1998 Budget FY 1999 Budget To Complete Total Program
Subtotal Product Development 1,213 691 674 495 774 CONT CONT
Subtotal Support and Management 0 0 0 0 0 CONT CONT
Subtotal Test and Evaluation 0 0 0 0 0 CONT CONT
Total Project 1,213 691 674 495 774 CONT CONT