FY98 Program Element Descriptive Summaries / RDDS

0603261N Tactical Airborne Reconnaissance

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance

(U) Cost (Dollars in Thousands)
PROJECT
NUMBER & FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 TO TOTAL
TITLE ACTUAL ESTIMATE ESTIMATE ESTIMATE ESTIMATE ESTIMATE ESTIMATE ESTIMATE COMPLETE PROGRAM
E0534 Tactical Reconnaissance System
21,669 23,082 10,607 1,458 0 0 0 0 0 216,767

(U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Tactical Airborne Reconnaissance Program develops systems to provide timely and accurate imagery intelligence. Present systems provide such imagery from manned platforms using film based sensors, necessitating a return to base for film processing. Manned reconnaissance, with Electro-Optical, Infrared and Synthetic Aperture Radar (SAR) sensors can provide both broad coverage and high resolution imagery at extended ranges via data link in near real time. The USMC RF-4Bs were phased out in 1990. A Navy Follow-On Tactical Reconnaissance capable aircraft will replace the interim Navy F-14 Tactical Air Reconnaissance Pod System (TARPS) with a suite of sensors that will provide near real time data-linked information, Overflight and Short Range Stand-Off (O&SRS-O) sensors used for imagery processing, analysis, and storage.

(U) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under DEMONSTRATION & VALIDATION because it develops and integrates hardware for experimental test related to specific ship or aircraft applications.

Page 31-1 of 31-10 Pages Exhibit R-2

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

A. (U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($16,172) Awarded Element III of F/A-18 ATARS development contract to complete system development and

integration. Received replacement digital tape recorders. Commenced data link pod integration with ATARS and developmental flight test. Obtained Engineering Change Proposal (ECP) approval for Sensor suite and pallet production. Conducted data link minipod PDR/CDR.

(U) ($5,258) Completed sensor specific ATARS developmental flight testing. Commenced ATARS developmental flight

testing with replacement digital tape recorder and data link. Commenced/completed ATARS operational analysis flight testing. Conducted limited production readiness review. Provided in-house technical support.

(U) ($239) Continued in-house engineering support.

2. (U) FY 1997 PLAN:

(U) ($20,811) Continue development of F/A-18 ATARS Tactical Reconnaissance System. Conduct software development

testing for incorporation into Operational Flight Plan (OFP) 13C. Commence Tactical Reconnaissance (TAC RECCE) system unique integration efforts into Radar Upgrade (RUG) phase II. Conduct minipod flight test.

(U) ($1,018) Continue testing of ATARS and RUG II Radar with data link. Continue in-house technical support.

(U) ($813) Continue in-house engineering support.

(U) ($440) Portion of program reserved for Small Business Innovation Research and assessment in accordance with 15

USC 638.

3. (U) FY 1998 PLAN:

(U) ($6,518) Complete development and integration of F/A-18 Tactical Reconnaissance System.

(U) ($3,339) Complete ATARS and RUG II development testing with data link and Operational Flight Program (OFP) 13C.

Initiate system operational evaluation. Continue in-house technical support.

(U) ($750) Continue in-house engineering support.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

4. (U) FY 1999 PLAN:

(U) ($1,208) Complete system Operational Evaluation. Conduct program review for full production decision. Award

full rate production contract. Achieve Initial Operational Capability with limited production systems. Conduct Follow-On Test and Evaluation. Continue in-house technical support.

(U) ($250) Continue in-house engineering support.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System
B. (U) PROGRAM CHANGE SUMMARY:
FY 1996 FY 1997 FY 1998 FY 1999
(U) FY 1997 President's Budget 20,214 24,085 10,840 1,477
(U) Appropriated amount: 24,085
(U) Adjustments from President's Budget: +1,455 -1,003 -233 -19
(U) FY 1998/99 President's Budget Submit: 21,669 23,082 10,607 1,458

(U) Funding: The net increase of +$1,455 thousand in FY96 reflects a Major Range Test Facility Base restoral, SBIR

assessment, and other minor program adjustments. The net decrease of -$1,003 thousand in FY 1997 is comprised of Navy Working Capital Fund (NWCF) and minor balancing reductions. The net decreases of -$233 thousand in FY 1998 and -$19 thousand in FY 1999 are comprised of NWCF and minor balancing adjustments.

(U) Schedule: TAC RECCE was upgraded to an ACAT II Program in August 1996, changing Acquisition Approval Authority

to ASN (RD&A). Based on this change new milestones are displayed on the budget exhibit. Specifically, a Program Review is now required for LRIP II (1Q98) and the associated LRIP II Contract Award is now displayed. Additionally, increased reporting requirements have caused a one quarter slip in the Program Review for LRIP I (from 4Q96 to 1Q97), LRIP I Con-tract Award (from 1Q97 to 2Q97), the Full Rate Production Decision (from 1Q99 to 2Q99) and the Full Rate Production Contract Award (from 2Q99 to 3Q99). Also, the Marine Corps Operational Assessment, originally scheduled for 4Q97, has been deleted based on information obtained by the Operational Test Community during Developmental Testing. Addition-ally, an Operational Evaluation was added in FY 1999.

(U) Technical: The original data link pod also known as the Engineering Development Model (EDM) pod was designed to

house the Electro-Optic Long Range Oblique Photography System (EO-LOROPS) in addition to data link. However, EO-LOROPS was cancelled in 1994. The EDM pod housing was retained because it could still be used for Congressionally mandated data link requirement for TAC RECCE. In late summer 1995, a suitability study of the EDM pod indicated that it was unsuitable as a data link pod because of poor loading characteristics, not-carrier suitable and not jettisonable. Seven alternative designs were evaluated and in October 1995 Loral "minipod" was selected. This pod utilizes the same cone and tail section as the EDM pod but has a much smaller center section to house the data link Weapon Replaceable Assemblies. This commonality has also allowed continued use of the EDM pod for ground and flight risk reduc-tion testing until a minipod is built. The data link minipod completed PDR and CDR in 1996 and one R&D asset is being built and will be test flown in 1997.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

C. (U) OTHER PROGRAM FUNDING SUMMARY: (Dollars in thousands)

(U) PROCUREMENT: Included in the F/A-18 E/F funding.

(U) RELATED RDT&E:

(U) PE 0204136N (F/A-18 Squadrons (Project E2065 F/A-18 Radar Upgrade Phase II)): Adds all weather reconnaissance

capability to multi-mission aircraft; adds SAR imagery mode provisions to radar upgrade.

(U) PE 0206625M (Marine Corps Intelligence/Electronic Warfare System): Receives EO/IR/SAR imagery.

(U) SBIR: Common Aperture Multi-Spectral Sensor and Night IR and Day EO in one sensor.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

D. (U) SCHEDULE PROFILE:
FY 1996 FY 1997 FY 1998 FY 1999 TO COMPLETE
Program 1Q/PROGRAM REVIEW 1Q/PROGRAM REVIEW 2Q/FULL RATE
Milestones FOR LRIP I FOR LRIP II PRODUCTION
DECISION
Engineering 3Q/ATARS OA 3Q/MINI-POD 3Q/COMPLETE
Milestones 3Q/MINI-POD PDR DELIVERY SOFTWARE
4Q/MINI-POD CDR ENHANCEMENTS
T&E 1Q/CFT 4Q97-1Q98/MINI-POD DT 4Q/PRODUCTION 1Q-2Q/OPEVAL
Milestones 3Q95-3Q96/ATARS DT&E VERIFICATION
FLIGHT TEST
Contract 2Q/LRIP I CONTRACT 1Q/LRIP II CONTRACT 3Q/FRP CONTRACT
Milestones AWARD AWARD AWARD

Page 31-6 of 31-10 Pages Exhibit R-2

FY 1998 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System
A. (U) PROJECT COST BREAKDOWN: ($ in thousands)
Project Cost Categories FY 1996 FY 1997 FY 1998 FY 1999
a. Contract 16,759 17,797 6,209 1,014
b. Support Contract 297 353 319 242
c. In-House Support 2,503 3,465 3,554 112
d. Test and Evaluation 2,110 1,027 525 90
e. SBIR Assessment 440
Total 21,669 23,082 10,607 1,458

Page 31-7 of 31-10 Pages Exhibit R-3

FY 1998 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS
Contractor/Government Perofrming Activity Contract Method/ Fund Type Award/Oblig Date Perform Activity EAC Project Office EAC Total FY 1995 & Prior FY 1996 Budget FY 1997 Budget FY 1998 Budget FY 1999 Budget To Complete Total Program
Product Development
Loral Fairchild S-CPFF Dec 92 20,579 20,579 20,500 79 0 0 0 0 20,579
Syosset, NY
MDA S-CPFF Nov 95 49,010 49,010 7,310 16,680 17,797 6,209 1,014 0 49,010
St. Louis, MO
MDA Var Var 26,676 26,676 26,676 0 0 0 0 0 26,676
St. Louis, MO
Misc Field Activities Var Var 70,551 70,551 70,551 0 0 0 0 0 70,551
Support and Management
Rail T&M Oct 94 TBD 2,159 948 297 353 319 242 0 2,159
Field Activities Var Oct 97 28,796 28,796 25,890 503 732 1,641 30 0 28,796
NAWC China Lake Var Oct 97 8,528 8,528 1,800 2,000 2,733 1,913 82 0 8,528
Test & Evaluation
Field Activities WX Oct 97 5,376 5,376 5,176 50 35 100 15 0 5,376
NAWC PAX River WX Oct 97 4,652 4,652 1,100 2,060 992 425 75 0 4,652
SBIR Assessment 440 440
GOVERNMENT FURNISHED PROPERTY: Not Applicable

Page 31-8 of 31-10 Pages Exhibit R-3

FY 1998 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

A. <(U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands) (cont.)

Total
FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total
& Prior Budget Budget Budget Budget Complete Program
Subtotal Product Development 125,037 16,759 17,797 6,209 1,014 0 166,816
Subtotal Support and Management 28,638 2,800 3,818 3,873 354 0 39,483
Subtotal Test and Evaluation 6,276 2,110 1,027 525 90 0 10,028
SBIR Assessment 440 440
Total Project 159,951 21,669 23,082 10,607 1,458 0 216,767

Page 31-9 of 31-10 Pages Exhibit R-3

FY 1998 RDT&E,N PROGRAM ELEMENT/PROJECT COST BREAKDOWN DATE: February 1997

BUDGET ACTIVITY: 4 PROGRAM ELEMENT: 0603261N PROJECT NUMBER: E0534

PROGRAM ELEMENT TITLE: Tactical Airborne Reconnaissance PROJECT TITLE: Tactical Reconnaissance System

THIS PAGE INTENTIONALLY BLANK