(U) COST: (Dollars in Thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
R0739 Navy C4I Top Level Requirements 1,059 1,034 1,164 1,897 1,929 1,958 2,038 2,047 CONT. CONT.
X0706 EMI Reduction and Radio Frequency Management 1,911 1,719 1,619 2,273 2,325 2,381 2,433 2,488 CONT. CONT.
Total2,970 2,753 2,783 4,170 4,254 4,339 4,471 4,535 CONT. CONT.

(U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: Project R0739 Navy C4I Top Level Requirements - Analyzes fleet requirements and research and development technology to develop top level plans for operating Navy Communications, Command and Control Computers, and Intelligence (C4I) and space systems in the Space and Electronic Warfare (SEW) mission area. Project X0706 Electromagnetic Interference (EMI) Reduction and Radio Frequency (RF) Management develops advanced technology to identify and reduce EMI sources from Navy systems and platforms.

(U) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under RDT&E MANAGEMENT SUPPORT because it supports the operations and installations required for general research and development use.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY l997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N

PROGRAM ELEMENT TITLE: Navy Space and Electronic Warfare Support (SEW)

(U) RESOURCES: (Dollars in Thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
R0739 Navy C4I Top Level Requirements 1,059 1,034 1,164 1,897 1,929 1,958 2,038 2,047 CONT. CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project provides analysis of fleet requirements and research and development technology to develop top level plans for operating Navy Communications, C4I and space systems in the Space and Electronic Warfare mission area.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U) ($525) Identified programs and actions needed to provide networking office systems, e.g. enhanced multilevel security and mine warfare C4I.

(U) ($534) Identified programs and actions needed to provide joint capabilities for C4I architecture, e.g. enhanced near real time targeting, real time joint planning/coordination, early intelligence preparation of battle space, and hardkill/softkill weapons.

2. (U) FY 1997 PLAN:

(U) ($476) Identify programs and actions needed to provide networking of C4I. systems, e.g. enhanced

multilevel security, network management and mine warfare C4I.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY 1997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N PROJECT NUMBER: R0739

PROGRAM ELEMENT TITLE: Navy Space and Electronic PROJECT TITLE: Navy C4I Top Level Requirements Warfare Support (SEW)

(U) ($536) Identify programs and actions needed to provide joint capabilities for architecture, e.g.

enhance near real time targeting, real time joint planning/coordination, early intelligence preparation of

battle space, and hardkill/softkill weapons.

(U) ($22) Portion of extramural program reserved for Small Business Innovation Research Assessment in

accordance with 15 USC 638.

3. (U) FY 1998 PLAN:

(U) ($587) Support studies of increased efficiencies and technological advantages conferred by more

effective utilization of computing resources and bandwidth.

(U) ($577) Identify programs and actions needed to provide joint capabilities for C4I architecture, e.g.

enhance near real time targeting, real time joint planning/coordination, early intelligence preparation of

battle space, and hardkill/softkill weapons. Efforts have been reduced by 435K as a result of low

expenditures for FY 1996.

4. (U) FY 1999 PLAN:

(U) ($993) Support studies of increased efficiencies and technological advantages conferred by more

effective utilization of computing resources and bandwidth.

(U) ($904) Identify programs and actions needed to provide joint capabilities for C4I architecture, e.g.

enhance near real time targeting, real time joint planning/coordination, early intelligence preparation of

battle space, and hardkill/softkill weapons.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY l997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N PROJECT NUMBER: R0739

PROGRAM ELEMENT TITLE: Navy Space and Electronic PROJECT TITLE: Navy C4I Top Level Requirements Warfare Support (SEW)

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 President's Budget: 1,082 1,077 1,605 1,873

(U) Adjustments from 1997 PRESBUDG: -23 -43 -441 +24

(U) FY 1998/1999 PRESBUDG SUBMIT 1,058 1,034 1,164 1,897

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 adjustment is due to Jordanian rescission (-1), and administrative and personal services

rescission (-5) and SBIR assessment (-17). FY 1997 adjustment is due to Congressional Undistributed reductions (-43). FY l998 adjustment is due to low expenditures in FY 1996 (-435), NWCF and minor adjustments (-3), and inflation. FY 1999 adjustment is due NWCF and minor adjustments (+31), and inflation (-7).

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.

D. (U) SCHEDULE PROFILE: Not applicable.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY l997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N

PROGRAM ELEMENT TITLE: Navy Space and Electronic Warfare Support (SEW)

(U) COST (Dollars in thousands)

PROJECT NUMBER & TITLEFY 1996 ACTUALFY 1997 ESTIMATEFY 1998 ESTIMATEFY 1999 ESTIMATEFY 2000 ESTIMATEFY 2001 ESTIMATEFY 2002 ESTIMATEFY 2003 ESTIMATETO COMPLETETOTAL PROGRAM
X0706 EMI Reduction and Radio Frequency Management 1,911 1,719 1,619 2,273 2,325 2,381 2,433 2,488 CONT. CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: Electromagnetic Interference (EMI) Reduction and Radio Frequency (RF) Management. This project develops tools to identify and reduce EMI sources from Navy systems and platforms. There are several tools under development to identify and reduce EMI through proper use of the electromagnetic spectrum. The Battle Force (BF) EMI Evaluation System (BEES) is a computer-aided force-level EMI evaluation tool that is used to develop BF Electromagnetic Environmental Effects (E3) policy for naval operations in the joint arena and fosters national and international inter-platform EM compatibility (EMC) during operations and exercises. The Automated Spectrum Planning, Engineering, Coordination and Tracking System (ASPECTS) is a computer-aided force-level communications planning and frequency management tool that is used to plan communication links, and analyze, allocate and assign communication and radar frequencies for fleet operations. The Waveform Recording and Playback System (WRaPS) is a unique E3 testing system to be used to measure degradation of a system performance due to EMI. The waveform of a potential interfering system is recorded; the recording can then be played back at a variety of test sites to evaluate the vulnerability of other systems to this waveform. Research includes advanced technology chamber (ATC), shielding effectiveness of composite materials, application of fiber optics to signal cables to eliminate EMI, and coherent measurements and development of E3 testing criteria/procedures.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY l997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N PROJECT NUMBER: X0706

PROGRAM ELEMENT TITLE: Navy Space and Electronic PROJECT TITLE: Electromagnetic Interference

Warfare Support (SEW) (EMI) Reduction and Radio Frequency (RF)

Management

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

(U)($672) ASPECTS: Completed ASPECTS software development for inclusion in CSS. Continued developing

software for conversion of Frequency Management Module (FMM) of ASPECTS to TAC-4 in Joint Maritime Information Systems (JMCIS). Continued to develop Frequency Assignment Algorithms for Compatibility Analysis Program (EMCAP). Developed E3 Information Network software bridges to obtain access to multiple data bases for ASPECTS use.

(U)($1,007) BEES: Developed detection-to-engagement (DTE) capability for platforms. Developed EMI

displays for BEES Analyst Terminal to increase reporting capability. Continued development of capability

to measure and record the EME in real-time and record specific radio frequency (RF) signatures for use in

EMI investigations.

(U)($232) Criteria and Test Procedures: Completed development of capability to assess system performance in topside High Frequency Electromagnetic Environment (HF EME) Began developing criteria and test procedures using industry standards.

2. (U) FY 1997 PLAN:

(U)($373) ASPECTS: Complete development of software for conversion of FMM to TAC-4 in JMCIS. Continue

to develop Frequency Assignment Algorithms for EMCAP. Develop capability to receive real-time recordings of the EME to be used in frequency management. Continue to develop E3 Information Network Software bridges.

(U)($983) BEES: Continue to develop models and EMI displays for BEES Analyst Terminal to increase

model fidelity. Develop Decision Trees and begin to incorporate them into BEES to model operational

decisions in response to EMI degradation. Develop force-level (DTE) model and complete initial capability

command decision tree and terrain models.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY l997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N PROJECT NUMBER: X0706

PROGRAM ELEMENT TITLE: Navy Space and Electronic PROJECT TITLE: Electromagnetic Interference

Warfare Support (SEW) (EMI) Reduction and Radio Frequency (RF)

Management

(U)($338) Criteria and Test Procedures: Develop Coherent Measurement Techniques for E3 testing.

(U)($25) Portion of extramural program reserved for Small Business Innovation Research assessment in accordance with 15 U.S.C 638.

3. (U) FY l998 PLAN:

(U)($396) ASPECTS: Expand frequency assignment algorithms for EMCAP. Begin development of ASPECTS and

EMCAP software updates. Complete EME monitoring transition study and real-time frequency management

software development. Complete development of E3 information network software bridges to multiple

databases. Complete development of E3 Information Network Software bridges.

(U)($891) BEES: Begin development of generic and specific electronic-communication system models. Continue incorporation of Decision Trees into BEES to model operational decisions in response to EMI degradation.

(U)($332) Criteria and Test Procedures: Continue to investigate industrial standards for conversion to

military standards, where appropriate. Incorporate Coherent Measurement Techniques for E3 test criteria.

An additional $138K is forward financed with FY 1997 funding due to low expenditures in the accounting

system FY 1996.

4. (U) 1999 PLAN:

(U)($670) ASPECTS: Complete development of capability to receive real-time recordings of the EME to be used in frequency management. Continue ASPECTS and EMCAP software updates. Continue real-time frequency management software development.

(U)($1,234) BEES: Continue development of generic and specific electronic-communication system models. Apply conditional logic to selected additional models to replicate operational decision making as it relates to E3.

(U)($369) Criteria and Test Procedures: Continue to investigate industrial standards (foreign and domestic)

for conversion to military standards. Continue to incorporate Coherent Measurement Techniques into E3 test

criteria.

FY 1998 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: FEBRUARY 1997

BUDGET ACTIVITY: 6 PROGRAM ELEMENT: 0605866N PROJECT NUMBER: X0706

PROGRAM ELEMENT TITLE: Navy Space and Electronic PROJECT TITLE: Electromagnetic Interference

Warfare Support (SEW) (EMI) Reduction and Radio Frequency (RF)

Management

B. (U) PROGRAM CHANGE SUMMARY:

FY 1996 FY 1997 FY 1998 FY 1999

(U) FY 1997 PRESIDENT'S BUDGET: 1,946 1,791 1,769 2,293

(U) ADJUSTMENTS FROM 1997 PRESUDG: -35 -72 -150 -20

(U) FY 1998/1999 PRESBUDG SUBMIT: 1,911 1,719 1,619 2,273

(U) CHANGE SUMMARY EXPLANATION

(U) Funding: FY 1996 adjustment reflects SBIR assessment (-29K) and other minor adjustments (-6K). FY 1997 adjustment is due to Congressional Undistributed General Adjustments (-72K). FY 1998 adjustment reflects

an adjustment for low expenditures in FY 1996 (-138K); a NWCF rate adjustment (-6K), inflation (-4K) and other minor adjustments (-2K). FY 1999 adjustment is due to NWCF (-6K), inflation (-8K) and other minor adjustments (-6K).

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.