Document Title : Rollout and Installation of Risk
Management at the IMINT Directorate, National Reconnaissance Office
| Filename |
MIME Type |
Size (Bytes) |
| ADA375848.pdf |
application/pdf |
10818169 |
AD Number: ADA375848
Subject Categories: ADMINISTRATION AND MANAGEMENT
Corporate Author:
CARNEGIE-MELLON UNIV PITTSBURGH PA SOFTWARE ENGINEERING INST
Title: Rollout
and Installation of Risk Management at the IMINT Directorate, National
Reconnaissance Office
Descriptive Note: Technical rept.,
Personal
Authors: Loveland, Jo L.; Barbour, Rick; Krum, Al; Neitzel, August C.
Report
Date: DEC 1999
Pages: 218 PAGES
Report Number: CMU/SEI-99-TR-009
Contract Number: F19628-95-C-0003
Monitor Acronym: ESC*, XC
Monitor
Series: TR-99-009, ESC*
Descriptors: *MANAGEMENT PLANNING AND CONTROL,
*RISK, COMPUTER PROGRAMS, IMAGE PROCESSING, ACQUISITION, TEAMS(PERSONNEL),
CONCURRENT ENGINEERING, INSTALLATION, PILOT STUDIES, RECONNAISSANCE,
SYSTEMS MANAGEMENT, RADAR INTELLIGENCE.
Identifiers: RISK MANAGEMENT,
IDP(IMAGERY DEVELOPMENT PROGRAM), IMINT(IMAGERY INTELLIGENCE), NATIONAL
RECONNAISSANCE OFFICE
Abstract: The NRO Risk Management pilot
project, and subsequent rollout and installation, were launched in the Imagery
Development Program (IDP) at the Imagery Intelligence (IMINT) Directorate. This
was preceded by a Software Acquisition Capability Maturity Model(registered)
(SA-CMM(registered)) assessment to determine strengths and gaps in IMINT's
capability as an acquisition organization. From the potential SA-CMM improvement
areas, IMINT leaders determined that the optimum first initiative would be
Acquisition Risk Management. To launch the Risk Management initiative, MINT
leaders identified the Command and Control Division (CCD) in IDP as the pilot
initiative. They further decided to conduct Software Risk Evaluations (SREs)
with both the government organization and the principal contractor for CCD. The
CCD division proceeded to install a dynamic, interactive Risk Management process
throughout its program, with a Team Risk Management approach. This approach was
leveraged by monthly CCD Team Risk Reviews (TRRs). The TRRs served as regular
forums for government and contractors to identify and mitigate joint risks. The
IDP director, observing the success of the CCD pilot, called for consistent Risk
Management training across the divisions. Concurrently, the IDP director also
launched the EIS System Risk Management Team (ESRT) with a mission to identify
and address system-level risks. The divisional Risk Management processes
(including contractor Risk Management) were combined with system-level Risk
Management at the ESRT to develop a comprehensive, consistent Risk Management
process that became routinely operational. The central purpose of this report is
to provide a knowledge asset repository for the National Reconnaissance
Office that can be leveraged in support of further Risk Management efforts.
Limitation Code: APPROVED FOR PUBLIC RELEASE
Source Code: 416208
Citation Creation Date: 19 APR 2000