Aquila OT II PM’s Perspective
Sub-Systems Allocations
Aquila Met its Total System Mission Reliability (.75)
GCS Exceeds
Rgt Exceeds Top Priority
Recovery System Exceeds
Air Vehicle Exceeds Top Priority
Daytime Payloads Exceeds
Air Vehicle Handler Exceeds
Data Link Exceeds Top Priority
Launcher Failed to Meet Got all the Attention
Previous slide
Next slide
Back to first slide
View graphic version