The TROJAN Transportable Mini-Switch (TTMS) is a self-contained, transportable switching subsystem interoperable with the existing TROJAN network. The TTMS adds a distributed switching capability to the TROJAN network, and provides a limited theater level switching subsystem for contingency operations. The TTMS provides a forward deployed switching capability tailored to support the intelligence processing and dissemination mission of the TROJAN Special Purpose Integrated Remote Intelligence Terminal (SPIRIT) II systems during split-based contingency operations. This theater capability may be independent of or connected to the existing TROJAN Switching Center at Fort Belvoir, VA. In essence, the TTMS is a transportable extension of the existing Trojan Switch Center, located to support, but not necessarily within, a theater of operations to support inter-theater connectivity between deployed TROJAN SPIRIT II systems and/or an intra-theater gateway between strategic and tactical assets during split-based, force projection operations. The transportability profile of the TTMS is not as a tactical system but having the capability of being transported by military airlift, shipping vessel, rail car or vehicle towed to a U.S. military installation within satellite coverage of the contingency area of operations. This installation requires the proper power and communications resources to support the TTMS.

TRANSPORTATION CHARACTERISTICS / LIMITATIONS: Self-contained within 8'x20' ISO shelter transport by trailer, CH-47/CH-53 Helo, C5A, C17, C-141 and C-130 fixed wing.

HISTORICAL BACKGROUND:

US Army-Intel Center documented requirement to eliminate dual satellite hops providing a cost savings when TROJAN SPIRIT II is deployed to support split-based and contingency operations.

REQUIREMENTS DOCUMENT: TROJAN SPIRIT ORD 15 Dec 92, Annex dated 5 Jan 94.

TYPE CLASSIFICATION: Standard.

EVENT SCHEDULE FISCAL YEAR

96

97

98

99

00

01

QTR

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

1 2 3 4

TTMS #1 Acceptance Testing

1

 

 

 

 

 

TTMS #2 Acceptance Testing

2

 

 

 

 

 

Environment/Transportability Testing

3

 

 

 

 

 

Site Survey

4

 

 

 

 

 

Sources and Methods



FAS | Intelligence | Programs| Disseminate |||| Index | Search |


http://www.fas.org/irp/program/disseminate/trojan_ttms.htm
Created by John Pike
Maintained by Steven Aftergood

Updated Friday, July 04, 1997 11:18:40 AM