Basis of Issue Plan - BOIP
A. DESCRIPTION: THE DIVISION LEVEL TAC PROCESSING AND
ANALYSIS FACILITY CONSISTS OF THREE SHELTERS.
B. CAPABILITIES: THE FACILITY WILL HOUSE OPER/ANALYST-TAC
COMPUTER ITEMS-COMMUNICATIONS.
C. EMPLOYMENT: THE FACILITY WILL SERVE AS THE CENTER FOR
CONTROL AND MANAGEMENT OF DIVISION SIGINT/EW ASSETS.
D. BASIS OF ISSUE: WILL BE ISSUED ON A SELECTED BASIS.
E. POWER REQUIREMENTS: EACH SHELTER WILL BE EQUIPPED WITH A
30-KW GEN. ONE 30-KW GEN WILL DRIVE TWO SHELTERS; TWO 30-KW GEN
WILL DRIVE THREE SHELTERS. COMMERCIAL POWER, 208/120-V, 60-HZ.
F. TRANSPORTATION REQUIREMENTS: THE FACILITY WILL BE
MOUNTED ON M813 CARGO TRUCKS.
G. PERSONNEL/MAINTENANCE IMPACTS:
(1) OPERATOR: NO ADDITIONAL PERSONNEL AUTHORIZED.
(A) CREW SIZE/MOS: TCAC PERSONNEL WILL BE IDENTIFIED
AS FOLLOWS:
1. TWO WO, 982A0: ONE FROM EACH PARA 15 AND 16.
2. ONE WO, 983A0, FROM PARA 17.
3. ONE E7, 98G4L, FROM PARA 15.
4. THREE E6, 98C30: ONE FROM PARA 15; TWO
FROM PARA 16.
5. ONE E6, 98J30, FROM PARA 15.
6. SIX E5, 98C20: TWO FROM PARA 15; THREE FROM
PARA 16; ONE FROM PARA 18.
7. ONE E5, 98G2L, FROM PARA 15.
8. TWO E5, 98J20: ONE FROM EACH PARA 15 AND 17.
9. FIVE E4, 98C10: THREE FROM PARA 15; TWO FROM
PARA 16.
10. ONE E4, 98G1L, FROM PARA 15.
11. ONE E4, 98J10, FROM PARA 17.
12. SIX E3, 98C10: THREE FROM PARA 15; THREE
FROM PARA 16.
(B) TRAINING REQUIREMENTS (MOS/GENERAL): TRAINING
WILL BE CONDUCTED AT FT DEVENS FOR CONSOLIDATED OPERATOR/
SUPERVISOR COURSE. LENGTH OF TRAINING WILL BE FOUR WEEKS AND
THREE DAYS.
(2) MAINTAINERS: CONTRACT MAINTENANCE.
H. SPECIAL NOTES:
(1) PERSONNEL TO MAN THE TCAC ARE ORGANIC TO TOE
34166H810/820.
(2) THIS ITEM IS APPROPRIATE FOR INCLUSION IN AR 310-34.