
Basis of Issue Plan - BOIP
A. DESCRIPTION: THE PU-XX2/MJQ-26(V)1, POWER SYSTEM
ALTERNATE POWER TRAILER MOUNTED ON A SEMI-TRAILER, IS THE SECOND OF
TWO TRAILERS THAT MAKE UP THE AN/MJQ-26 POWER DISTRIBUTION SYSTEM.
IT CONSISTS OF:
1) TWO MEP007B 100 KW GENERATORS
2) ONE CABLE PALLET ASSEMBLY MOUNTED ON A M270A1 TRAILER
B. CAPABILITIES: THE AN/MJQ-26 POWER DISTRIBUTION SYSTEM,
ALTERNATE POWER TRAILER, PROVIDES THE POWER FOR THE MAINTENANCE SHOP
SEMITRAILER MOUNTED: AN/ARM-185A, FLIGHT LINE TEST SET:
AN/ARM-163(V)4, AND STORAGE VANS AN/ASM-189 AND 190.
C. EMPLOYMENT: THIS SYSTEM IS TO BE EMPLOYED TO THE MILITARY
INTELLIGENCE BRIGADE, AERIAL EXPLOITATION BATTALION, CORPS.
(34418C200)
D. BASIS OF ISSUE: ONE PER AVIATION COMPANY (ELECTRONIC
WARFARE), MILITARY INTELLIGENCE BATTALION (AERIAL EXPLOITATION),
CORPS.
E. POWER REQUIREMENTS: THIS POWER SYSTEM PROVIDES 200 KW
OUTPUT AT 60 HZ TO SUPPORT A 24 HOUR DAY OPERATION.
F. TRANSPORTATION REQUIREMENTS: THIS SYSTEM REQUIRES ONE TRUCK
TRACTOR (T91656) FOR MOBILITY.
G. PERSONNEL/MAINTENANCE IMPACTS:
1. OPERATOR: NONE DESIGNATED
2. MAINTAINERS:
A. UL MAINTENANCE: 33R, 52D, 63S
B. DS MAINTENANCE: 52D, 63W
C. GS MAINTENANCE: 52D, 63W
H. SPECIAL NOTES:
1. AS OF JUNE 1993, THE HISTORY OF THE GUARDRAIL FAMILY
IS AS FOLLOWS:
THE BASE ITEM IN ALL AERIAL EXPLOITATION BATTALIONS IS
GUARDRAIL V (GRV). GRV WAS FIELDED TO USAREUR AND 15TH MI BN, FT
HOOD. IT WAS REPLACED BY IGRV, AN/USD-9A, AT BOTH LOCATIONS. THE
IGRV IN USAREUR WAS THEN REPLACED BY THE GUARDRAIL COMMON SENSOR
SYSTEM 4 (GRCS-4), WHILE THE IGRV IN FT HOOD IS SCHEDULED TO BE
REPLACED BY THE GUARDRAIL COMMON SENSOR SYSTEM 2 (GRCS-2) IN
1997.
2. IGRV CONSIST OF THE FOLLOWING LINS:
Z04118 (M021AA), Z15849 (M021AB), Z15917 (M021AC),
Z28126 (M021MA), Z40903 (M021MB), Z41406 (M021MC),
Z50693 (M021AD), Z76231 (M021AE), Z77097 (M021AF),
Z77165 (M021AG), Z35208 (M021AH).
3. ALL PERSONNEL CHANGES GENERATED BY THE IGRV BOIP'S WERE
AFFECTED BY USING BOIP M021AA.
4. BOING IS NOT APPROPRIATE FOR PUBLICATION IN AR 71-13.