Basis of Issue Plan - BOIP

A. DESCRIPTION: THE ALL SOURCE ANALYSIS SYSTEM (ASAS): AN/TYQ-90/LIN Z04970 IS COMMONLY REFERRED TO AS THE ARMORED CAVALRY REGIMENT/SEPARATE BRIGADE (ACR/SEP BDE) ACE (ANALYSIS AND CONTROL ELEMENT). IT IS PART OF THE "ACR/ SEP BDE SET" (SEE A.3. BELOW) OF ASAS BLOCK II EQUIPMENT, WHICH CONSISTS OF 2 PRIMARY SUBSYSTEMS--THIS ACR/SEP BDE ACE AND THE COMMUNICATIONS CONTROL SET (CCS): AN/TYQ-63A(V)3/ Z43029 (W/RADIO) AND A SECONDARY SUBSYSTEM -- REMOTE WORKSTATIONS (RWS): AN/TYQ-93/Z72392. 1. THE ACR/SEP BDE ACE IS COMPRISED OF 8 WORKSTATIONS CONSISTING OF BASELINED COMMON HARDWARE AND SOFTWARE (CHS) COMPONENTS WHICH WORK AT THE TOP SECRET SENSITIVE COMPART- MENTED INFORMATION (TS-SCI) LEVEL AND PROVIDE AUTOMATED DATA PROCESSING IN THE ACR/SEP BDE ACE. EACH WORKSTATION HAS A 19" DIAGONAL SUPER HIGH RESOLUTION COLOR GRAPHICS DISPLAY, MASS STORAGE DEVICE(S), KEYBOARD, POINTING DEVICE, AND ACCESSES A PRINTER. NON-LIN COMPONENTS: NSN/PN QTY/ NOMENCLATURE RATIO --------------------------------------------------------------- V2U2S2000HCX3C 8:1 CHS2 ULTRA2 COMPUTER UNIT (UCU-2) 7025-01-421-7664 8:1 CHS2 19" COLOR MONITOR DEVICE 7025-01-444-9625 20:1 CHS2 9GB REMOVEABLE HARD DISK DRIVE 6130-01-421-7678 4:1 CHS2 UNINTERRUPTIBLE POWER SUPPLY (UPS) 02-2757027-1 2:1 CHS V2 MASS STORAGE EXPANSION UNIT-2 (MSEU-2) 11-2757020-1 2:1 CHS2 COLOR PRINTER 02-2757124-1* 1:1 LARGE SCREEN DISPLAY (CHS-2) 02-2755928-1 4:1 CHS V2 16" COLOR FLAT PANEL DISPLAY 02-2758672-1 4:1 CHS V1/V2 2.6-GB MAGNETO-OPTIONAL DISK DRIVE 02-2757253-1 8:1 CHS V1/V2 600-MB 15X CD-ROM DRIVE 02-2757252-1 4:1 CHS V1/V2 40-GB 8MM MAMMOTH TAPE DRIVE 2514 2:1 CISCO (10/100 MBPS ETHERNET) SWITCH 02-2757218-1 8:1 VOICE COMMUNICATIONS EQUIPMENT HEADSETS 99-2757054-18 8:1 OPERATIONAL CASE - V2 HCU/UCU 99-2757054-19 8:1 OPERATIONAL CASE - V2 19" CMD 99-2757054-33 20:1 TRANSIT CASE, V2 RHDD 99-2757054-22 4:1 OPERATIONAL CASE, V2 UPS 5895-01-446-8579 2:1 TRANSIT CASE, V2 RCP 99-2757054-26 1:1 CHS2 TRANSIT CASE, LARGE SCREEN DISPLAY 99-2757054-34 8:1 LEVELING/STORAGE CASE *PLACEHOLDER-AWAITING CHS UPDATED VERSION. 2. PHYSICAL CHARACTERISTICS FOR EACH OF THE 8 WORKSTATIONS: LENGTH= 22.4 IN/WIDTH= 19 IN/HEIGHT= 22.6 IN/CUBE= 5.2 CU FT/WEIGHT= 125 LBS. a. DIMENSIONS DO NOT INCLUDE AN UNINTERRUPTIBLE POWER SUPPLY (UPS) (16" x 16" x 6", 78 LBS)), COLOR RASTER PRINTER (37" x 32" x H 23.75", 150 LBS) AND FLAT PANEL DISPLAY (17.5" x 5" x 15.75", 25 LBS) b. PHYSICAL CHARACTERISTICS FOR TRANSPORT OF DEVICES WITHIN TRANSIT CASES: -> HIGH CAPACITY UNIT/ULTRA CAPACITY UNIT (HCU/UCU) 25" x 28" x 24", 139 LBS -> MONITOR 25.11" x 28" x 26.24" AND 142 LBS -> MASS STORAGE EXPANSION UNIT (MSEU) 23.77" x 30.7" x 33.0". 80 LBS -> UPS 25.11" x 28.0" x 15.74", 146 LBS -> LEVELING/STORAGE CASE W/FLAT PANEL DISPLAY 25.32" x 19.3" x 10.0" AND 45 LBS (ESTIMATED) -> COLOR PRINTER 37.0" X 32.0" X 23.75" AND 150 LBS -> LARGE SCREEN DISPLAY (LSD) DIMENSIONS: 28" x 31.5"x 17.5" AND 74 LBS. A COMPLETE ACR/SEP BDE ACE ASAS WORKSTATION SUITE (8 WORKSTATIONS PLUS PERIPHERALS) CONSISTS OF 43 TRANSIT (OPERA- TIONAL & STORAGE) CASES WHICH TOTAL 278 CU.FT. AND 3699 LBS. c. NON-OPERATING/STORAGE TEMP SHOULD NOT BE LESS THAN -25F NOR MORE THAN +150F. OPERATING TEMP SHOULD BE 0 F TO 120 f. d. NON-OPERATING ALTITUDE UP TO 40,000 FT. OPERATING ALTITUDE 0-15,000 FT. 3. ASAS BLOCK II EQUIPMENT IS IDENTIFIED IN "ECHELON SETS" (I.E. EAC SET, CORPS SET, DIV SET, ACR/SEP BDE SET) & AND MAY BE COMPRISED OF VARYING TYPES OF: -> (1 OF 4 TYPES) ANALYSIS & CONTROL ELEMENT W/WORKSTATIONS- @ DIV: AN/TYQ-89/Z05038 W/14 WORKSTATIONS (BOIP M095AA); @ CORPS: AN/TYQ-92/Z07557 W/24 WORKSTATIONS (BOIP M095AF); @ EAC: AN/TYQ-91/Z05106 W/24 WORKSTATIONS (BOIP M095AH); @ ACR/SEP BDE: AN/TYQ-90/Z04970 W/8 WORKSTATIONS (BOIP M095AD). -> (1 OF 4 TYPES) COMMUNICATIONS CONTROL SET (CCS) @ DIV: AN/TYQ-40A(V)2/Z43301 (W/RADIO) (BOIP M095AB); @ CORPS: AN/TYQ-40A(V)3/Z43233 (W/O RADIO) (BOIP M095AG); @ EAC: AN/TYQ-63A(V)1/Z43165 (W/O RADIO) (BOIP M095AI); @ ACR/SEP BDE: AN/TYQ-63A(V)3/Z43029 (W/RADIOS)(BOIP M095AE). -> WORKSTATION COMPUTER GRAPHICS(WCG): AN/TYQ-93/Z72392 (REMOTE WORKSTATION (RWS) (BOIP M095AC)) ALL ASAS ITEMS (FOR DIV, CORPS, EAC, ACR/SEP BDE) ARE ASSIGNED BOIP NUMBERS WITHIN THE M095 ICP. 4. THE TRUCKS, TRAILERS, AND GENERATORS ARE REQUIRED TO TRANSPORT AND POWER THE WORKSTATION MODULES AND OTHER ASSO- CIATED SUPPORT ITEMS OF EQUIPMENT (ASIOE) WHEN DEPLOYED. B. CAPABILITIES: 1. THE PURPOSE OF ASAS IS TO FUSE INTELLIGENCE FROM VARIOUS SOURCES TO DEVELOP THE COLLATERAL COMMON RELEVANT ENEMY PICTURE OF THE BATTLEFIELD. EACH WORKSTATION USES THE BASELINED ASAS BLOCK II SOFTWARE THAT PROVIDES INTE- GRATED ALL SOURCE (AS) AND SINGLE SOURCE (SS) FUNCTIONALITY. a. WORKSTATIONS PERFORMING AS FUNCTIONS PROVIDE A SEMI-AUTOMATED INTELLIGENCE ANALYSIS, PRODUCTION, AND DISSEM- INATION CAPABILITY TO THE ACE. THE AS WORKSTATION WILL HAVE THREE HIGH-LEVEL CATEGORIES OF FUNCTIONALITY: SYSTEMS SERVICES SUPPORT, COMMUNICATIONS SUPPORT, AND INTELLIGENCE APPLICATIONS. THE SUPPORTING SOFTWARE WILL BE ORGANIZED INTO THREE MODULES: SYSTEM SOFTWARE MODULE (SSM); COMMUNICATIONS SOFTWARE MODULE (CSM); AND APPLICATIONS SOFTWARE MODULE (ASM). EACH OF THESE MODULES WILL BE DIVIDED INTO COMPUTER SOFTWARE CONFIGURATION ITEMS (CSCI) WHICH WILL PERMIT THE SIMULTANEOUS PROCESSING OF BOTH INTERACTIVE AND AUTOMATIC INTELLIGENCE ANALYSIS ACTIVITIES. THE INTERACTIVE FUNCTIONS REQUIRE THE JUDGEMENT AND/OR EXPERT KNOWLEDGE OF AN ANALYST OR SUPERVISOR. AUTOMATIC PROCESSING FUNCTIONS WHICH ARE FACTORY-SET OR SYSTEM-SUPVSR-SET WILL BE TRANSPARENT TO THE ANALYST. b. WORKSTATIONS PERFORMING SS FUNCTIONS PROVIDE SINGLE SOURCE ANALYSIS AND PROCESSING CAPABILITY. FUNCTIONALITY INCLUDES MAP OPERATIONS, OVERLAY OPERATIONS, TEMPLATE OPER- ATIONS, DATABASE UTILITIES MANIPULATION, FILE AND USER UTIL- ITIES WITH ANALYTIC TOOLS TAILORED TO THE SUPPORTED SOURCE OPERATIONS (SIGINT, IMINT, CI/HUMINT) ASSET MANAGEMENT, OFFICE PRODUCT SUITE, COMMUNICATIONS/MESSAGE UTILITIES, AND SYSTEM ADMINISTRATION. THE SS WORKSTATIONS INTERFACE WITH VARIOUS ORGANIC SENSORS, EXTERNAL DATA SOURCES THROUGH THE JOINT DEFENSE INTELLIGENCE SUPPORT SERVICES (JDISS) OVERSTANDARD COMMUNICATIONS LINKS. 2. THE AS WORKSTATIONS INTERFACE, VIA STANDARD COMMUNICATION LINKS, WITH THE SS WORKSTATIONS WITHIN THE ACE AND REMOTE WORK- STATIONS (RWS) OUTSIDE THE ACE USED FOR COLLATERAL PROCESSING. AS FUNCTIONALITY INCLUDES MAP OPERATIONS, OVERLAY OPERATIONS, TEMPLATE OPERATIONS, DATABASE UTILITIES/MANIPULATION, NODE OPERATIONS, HIGH CRITERIA/EVENT ALARM SETTING, FILE AND USER UTILITIES SUPPORTED BY ANALYTIC TOOLS, COLLECTION MANAGEMENT OPERATIONS, COMMUNICATIONS/MESSAGE UTILITIES, OFFICE PRODUCT SUITE, AND SYSTEM ADMINISTRATION. C. EMPLOYMENT: ASSIGNED TO THE ANALYSIS AND CONTROL ELEMENT (ACE) HQ, MI CO, ACR AND SEP BDE (EXCLUDING ENHANCED BDE). WHEN NO ACE YET EXISTS, (WITHIN THE ACR) IT SHOULD BE ASSIGNED TO TECH CONTROL & ANALYSIS ELEMENT (TCAE). ONCE ACE REDESIGN OCCURS, IT SHOULD BE ASSIGNED WITHIN THE ACE TO THE ACE COMMS SECT. UNITS CAN CONFIGURE THEIR WORKSTATIONS TO MEET MISSION NEEDS. D. BASIS OF ISSUE: - 1 PER ACE HQ, MI CO, ACR - 1 PER ACE HQ, MI CO, SEP BDE (EXCLUDING THE ENHANCED BDE) E. POWER REQUIREMENTS: POWER SOURCE: IN GARRISON, WORK- STATIONS UTILIZE COMMERCIAL POWER. WHEN DEPLOYED, THE ACE IS POWERED BY 2 15KW, 3/4T. TRAILER MTD POWER UNIT DEDICATED PU-801/LIN G78374/PU-801. POWER GENERATION DATA: 110/208 VAC THREE PHASE 50/60HZ. POWER REQMT: 120/208 VAC (+6% TO -12%), 50/60 HZ (+3% TO -3%), THREE PHASE TO THE M40 DISTRIBUTION BOX AND SINGLE PHASE OUTPUT FROM THE DISTRI- BUTION BOX TO THE INDIVIDUAL WORKSTATIONS. UNINTERRUPTIBLE POWER SOURCE (UPS)INTERFACES 80-132 VAC (47-66 HZ), 166-264 VAC (47-66 HZ) AND 22-32 VDC. F. TRANSPORTATION REQUIREMENTS: REQUIRES 1 3/4 TON HIGH MOBILITY TRAILER (HMT)/Z36272 AND 3 HMMWV/T61494, TWO OF WHICH PULL THE 2 ASIOE 15KW TRAILER-MTD GEN/G78374. ACR/SEP BDE ACE IS TRANSPORTABLE BY C130, C141, C5, C17 FIXED WING AND CH-47 ROTARY AIRCRAFT, AND RAIL. G. OPERATOR/MAINTAINER PERSONNEL IMPACTS: 1. OPERATORS: a. NO OPERATOR PERSONNEL PLUS-UPS AUTHORIZED FOR ASAS. b. THE FOLLOWING ORGANIC ANALYSIS AND CONTROL ELEMENT PERSONNEL WILL BE UTILIZED AS OPERATORS: -ALL SOURCE INTELLIGENCE 35D -INTELLIGENCE ANALYST 96B -IMAGERY ANALYST 96D -COUNTERINTELLIGENCE AGENT 97B -SIGNALS INTELLIGENCE ANALYST 98C -VOICE INTERCEPTOR 98G -ELECTRONIC INTELLIGENCE INTERCEPTOR/ANALYST 98J -TRAFFIC ANALYSIS TECH 352C -ALL SOURCE INTELLIGENCE TECHNICIAN 350B0 -INTERROGATOR 97E c. SSG/E6-MSG/E8 96B/INTEL SGT AND SSG/E6-MSG/E8 98C/SIGINT SGT IN ASAS-MANAGEMENT POSITIONS (I.E. THE SENIOR POSN) WITHIN THE ACR/SEP BDE ACE HQ, ASI SECT, SIGINT TM, AND TECH CNTRL & PROCESS (OR TECH CNTRL & ANAL) TM ARE AUTHORIZED ASI 1F/ASAS MASTER OPERATIONS. 2. MAINTAINERS: a. PRINCIPAL LIN: ELECTRONIC WARFARE/INTERCEPT SYSTEMS REPAIRER, MOS 33W (ORGANIC TO THE UNIT) IS REQ'D FOR UL/DS MAINT. b. ASIOE: -> +1 63B AND/OR +1 52D MAINTAINER PLUS-UP AUTHORIZED IN SELECTED TOES, ONLY AS SUPPORTED BY INCREASE IN MARC HRS DRIVEN BY EQUIPMENT TO SUPPORT BOTH THIS ITEM AND THE ACR/SEP BDE CCS/BOIP M095AE. -> UL: 52D, 63B -> DS: 52D, 63W -> GS: 35H, 52D 3. MAINTENANCE CONCEPT: a. THE STANDARD ARMY EQUIPMENT WILL BE SUPPORTED USING ESTABLISHED ARMY SUPPLY AND MAINTENANCE PROCEDURES. b. THE CHS-2 COMPONENTS WILL BE SUPPORTED USING THE SUPPLY AND MAINTENANCE CONCEPT APPROVED FOR CHS-2 COMPONENTS. OPERATORS WILL PERFORM FAULT ISOLATION DOWN TO LRU USING TECH- NICAL MANUALS AND DIAGNOSTIC SOFTWARE. MOS 33W WILL VERIFY SUSPECTED FAULTY LRU'S AND PERFORM REMOVE-AND-REPLACE ACTIONS AT THE UNIT LEVEL. CHS-2 COMPONENTS ARE SUPPORTED BY CONTRACTOR WARRANTY (LIFE OF CONTRACT, 1995-2005). c. THE COMMERCIAL-OFF-THE-SHELF (COTS) COMPONENTS WILL BE SUPPORTED USING MOS 33W AT THE UNIT (UL) AND DIRECT SUPPORT (DS) LEVELS. BEYOND DIRECT SUPPORT, THE COMPONENTS WILL BE EVACUATED TO THE DESIGNATED GOVERNMENT OR CONTRACTOR GENERAL SUPPORT (GS) FACILILTY OR DEPOT FOR REPAIR. SPARES ARE TO BE REQUISITIONED THROUGH THE SUPPLY SYSTEM AND DEPOT REPARABLE UNSERVICEABLES ARE TO BE TURNED IN THROUGH THE SUPPLY SYSTEM FOR REPAIR. d. POST DEPLOYMENT SOFTWARE SUPPORT WILL BE PROVIDED BY CECOM SOFTWARE ENGINEERING CENTER (SEC). H. SPECIAL NOTES: 1. THIS ITEM IS APPROPRIATE FOR INCLUSION IN FORCE MANAGEMENT BULLETIN BOARD (FMBB) "ABOI" DATABASE (FORMERLY AR 71-13). 2. ASAS BLOCK I AND ASAS-EXTENDED (ASAS-E) HARDWARE, ALTHOUGH NOT DOCUMENTED IN TOE, IS CURRENTLY DOCUMENTED IN MTOE AND AUTHORIZED TO UNITS BASED ON MEMORANDUM OF AUTHORIZATION (MOA) FROM HQDA (DAMO-FDI) DATED 191247Z MAR 93, SUBJECT: MI BASIS OF ISSUE PLAN (BOIP) PRIORITIZATION AND DOCUMENTATION AND THE FOLLOWING UPDATES: a. MESSAGE, DAMO-FDI, DTG 0110835 MAY 95: SUBJECT: AMENDMENT 1 TO ASAS MOA. b. MESSAGE, DAMO-FDI, DTG 241800Z JUN 96, SUBJECT: ASAS-E. c. MESSAGE, DAMO-FDI, DTG 251708Z SEP 96, SUBJECT: UPDATE TO AMENDMENT 1 TO THE ASAS MOA. d. MESSAGE, DAMO-FDI, DTG 301728Z OCT 96, SUBJECT: AMENDMENT 2 TO THE ASAS MOA. e. MESSAGE, DAMO-FDI, DTG 061834Z NOV 96, SUBJECT: CORRECTION TO AMENDMENT 2 TO ASAS MOA. f. MESSAGE, DAMO-FDI, DTG 181442Z DEC 96, SUBJECT: AMENDMENT 3 TO THE ASAS MOA. 3. ALTHOUGH ASAS BLOCK II IS THE FIRST ASAS EQUIPMENT DOC- UMENTED IN TOE, ANY/ALL OF THE FOLLOWING BLOCK I OR ASAS-E EQUIPMENT WILL BE REPLACED, IN APPROPRIATELY FIELDED UNITS, UPON FIELDING OF THIS BLOCK II ACR/SEP BDE ACE W/8 WORKSTATIONS: a. NSN 7010-01-428-2291 WORKSTATION, COMPUTER GRAPHICS: AN/TYQ-72(V)1, LIN NOT ASSIGNED (THE ALPHA RISC WORKSTATIONS USED IN THE ALL SOURCE) b. NSN 5895-01-417-8441 WORKSTATION, COMPUTER GRAPHICS: AN/TYQ-52(V)2/LIN Z98150 (THE CODAR WORKSTATIONS USED IN THE SINGLE SOURCE) c. NSN 5895-01-374-1770 SUPPLEMENTARY EQUIPMENT, ELECTRONIC: AN/TYQ-42(V)13/LIN S90427. d. NSN 5895-01-370-3670 SUPPLEMENTARY EQUIPMENT, ELECTRONIC: AN/TYQ-42(V)14/LIN S60284. e. NSN 7010-01-428-2314 WORKSTATION, COMPUTER GRAPHICS: AN/TYQ-74(V)1, LIN NOT ASSIGNED. f. NSN 7010-01-338-3296 WORKSTATION, COMPUTER GRAPHICS: AN/TYQ-37(V)5, LIN W95329 (NOW OBSOLETE) 4. ALL SOURCE ANALYSIS SYSTEM (ASAS) IS A COMMAND, CONTROL, AND COMMUNICATIONS SYSTEM CONSISTING OF COMMERCIAL-OFF-THE SHELF (COTS) AND NON-DEVELOPMENTAL ITEMS OF EQUIPMENT AND SELECTED ITEMS OF GOVERNMENT FURNISHED EQUIPMENT INTEGRATED TO MEET THE REQUIREMENTS OF THE ORD. ASAS SUPPORTS THE WARFIGHTING COM- MANDER'S BATTLE MANAGEMENT AND INFORMATION WARFARE PROCESS BY RAPIDLY PROCESSING AND CORRELATING LARGE VOLUMES OF COMBAT INFORMATION AND SENSOR REPORTS. 5. THE PURPOSE OF ASAS IS TO FUSE INTELLIGENCE FROM ALL SOURCES INTO A COLLATERAL COMMON PICTURE OF THE BATTLEFIELD AND PROVIDE TIMELY AND ACCURATE TARGETING INFORMATION, INTEL- LIGENCE PRODUCTS, AND THREAT ALERTS. ASAS PROVIDES AUTOMATED INTELLIGENCE AND INFORMATION MANAGEMENT, INCLUDING INTERFACE DATA HANDLING, TO COUPLE INTELLIGENCE AND ELECTRONIC WARFARE (IEW) SENSORS, PREPROCESSORS, THE ASAS, AND THE ARMY BATTLE COMMAND SYSTEM (ABCS) TO MEET TIME AND ACCURACY REQUIREMENTS FOR DECISION SUPPORT AND INFORMATION WARFARE PLANNING AND EXECUTION.