Basis of Issue Plan - BOIP

A. DESCRIPTION: THE AN/TSQ-XXX, DATA ANALYSIS CENTRAL (DAC) IS A SYSTEM THAT PROVIDES DATA PROCESSING CAPABILITY, COMMUNICATIONS, DATA DISPLAY, AND OUTPUTS IN TWO TRANSPORTABLE S-280 MODIFIED SHELTERS. EACH SHELTER HAS TEN DISMOUNTABLE WORKSTATIONS. IT PROVIDES THE HARDWARE REQUIRED TO SUPPORT CONTROL AND ANALYSIS SYSTEM FUNCTIONS. B. CAPABILITIES: IT IS CAPABLE OF STAND-ALONE OPERATIONS IN CONJUNCTION WITH ANOTHER DAC WITH WHICH IT IS FIELDED. THE DAC WAS FORMERLY KNOWN AS THE INTERIM SINGLE SOURCE PROCESSOR FOR SIGNAL INTELLIGENCE ELECTRONIC WARFARE (ISSP-S) AND IS NOW REFERRED TO AS TOP-GALLANT. THE SYSTEM IS INTENDED TO OPERATE 24 HOURS PER DAY AS AN INTERIM SOLUTION TO SUPPORT SIGNAL INTELLIGENCE REQUIREMENTS AT EAC LEVEL. C. EMPLOYMENT: THE SYSTEM IS DESIGNED TO BE THE TECHNICAL CONDUIT BETWEEN NATIONAL SIGNAL INTELLIGENCE SYSTEMS AND THEIR THEATER AND CORPS COUNTERPARTS. D. BASIS OF ISSUE: THIS IS A NONDEVELOPMENTAL ITEM (NDI) AND A LIMITED BUY OF ONE SYSTEM. IT IS USED AS AN INTERIM SOLUTION TO SUPPORT SIGNAL INTELLIGENCE REQUIREMENTS AT ECHELONS ABOVE CORPS. E. POWER REQUIREMENTS: POWER IS PROVIDED BY THE 30-KW GENERATOR, PU-406B/M. F. TRANSPORTATION REQUIREMENTS: MOUNTED IN TWO S-280 SHELTERS (MODIFIED). G. PERSONNEL/MAINTENANCE IMPACTS: (1) OPERATOR: (A) CREW SIZE/MOS: DURING PEACETIME THE SYSTEM REQUIRES THREE OPERATORS: ONE MOS 72E, ONE 74D, AND ONE OTHER PERSON IN ANY MOS 98C, 98G, 98J, OR 74F. DURING WARTIME THE SYSTEM REQUIRES TWO OPERATORS. (B) TRAINING REQUIREMENTS (MOS/GENERAL): NONE. (2) MAINTAINERS: (A) UNIT MAINTENANCE: CONTRACTOR PROVIDED. (B) IDS/IGS MAINTENANCE: CONTRACTOR PROVIDED. H. SPECIAL NOTES: THIS ITEM IS NOT APPROPRIATE FOR INCLUSION IN AR 71-13.