Joint Service Imagery Processing System - NavyPART II - BILLETS AND PERSONNEL REQUIREMENTS
The following charts are not included in Part II:
II.A.2.a Fleet and Fleet Support Replacement The JSIPS-N does not replace any current systems.
Replacement Phase Out - Schedule
II.A.2.b Military Billets per Fleet Operational The JSIPS-N System does not replace any
Unit (Including Fleet Readiness Operational Units or Activities.
Squadron (FRS))and/or Activity - Old
II.A.2.c Total Number of Billets to be Replaced The JSIPS-N System does not replace any billets in Fleet Support Units and/or Activities within the Fleet Support Structure.
II.A.2.d Total Fleet and Fleet Support Billets The JSIPS-N System does not replace any current for Old/Replaced System system.
II.A.3 Net Total Officer and Enlisted Fleet The JSIPS-N System does not bring any new
and Fleet Support Billet Requirements fleet and fleet support billet requirements.
II.B.1 Fleet and Fleet Support Adjusted Annual No impact on Class "A" school because the JSIPS-N
Annual Training Input Requirements - System uses existing billets training requirements.
Class "A" School Training
II.B.3 Foreign, Other Service and Non-Military The JSIPS-N System has no Foreign, Other Services Personnel Annual Training Input or Non - Military Training Requirements. Requirements
II.B.4 Reserve Personnel Mobilization The JSIPS-N System has no Reserve Mobilization Adjusted Annual Training Input Training Requirements.
Requirements
II.A BILLET REQUIREMENTS
II.A.1.a. Ready for Operational and Fleet Support Use - New Development Introduction Schedule
Source: PMA-281 Master Integrated Installation Schedule
Unit/Activity/Hull No/UIC. PFY CFY FY-99 FY-00 FY-01 FY 02
George Washington (CVN 73)/21412 FY95 (4th Qtr)
Carl Vinson (CVN 70)/20993 FY96 (1st Qtr)
Theodore Roosevelt (CVN 71)/21247 FY96 (3rd Qtr)
Constellation (CV 64)/03364 FY96 (3rd Qtr)
Wash Planning Center/00032 (Note 1) FY97 (4th Qtr)
FITCPAC San Diego/0388A (Note 2) FY97 (4th Qtr)
Tarawa (LHA 1)/20550 (Note 3) FY97 (4th Qtr)
John C. Stennis (CVN 74)/21847 FY97 (4th Qtr)
Essex (LHD 2)/21533 (Note 3) FY97 (4th Qtr)
Abraham Lincoln (CVN 72)/21297 1st Qtr Notes:
Dwight D. Eisenhower (CVN 69)/03369 1st Qtr 1. PMA-281 Laboratory/Test Site.
AOSDLANT RDS #1/39492 (Note 4) 2nd Qtr 2. Training Site - Partial Install (PTW only).
AOSDPAC RDS # 1/39493 (Note 4) 2nd Qtr 3. JSIPS-N Partial Install (PTW only).
Carl Vinson (CVN 70)/20993 (Note 5) 2nd Qtr 4. APS Sites - Equipment installed at these sites
Kitty Hawk (CV 63)/03363 2nd Qtr are operated and maintained by APS personnel.
NMITC Dam Neck/49441 (Note 6) 3rd Qtr MP&T requirements for these personnel are
NSAWC Fallon RDS # 3/49350 (Note 4) 3rd Qtr documented in the current Afloat Systems NTP
Enterprise (CVN 65)/03365 3rd Qtr (NTP-A-00-9001C) approved by OPNAV (N869)
Boxer (LHD 4)/21808 (Note 3) 3rd Qtr on 16 October 1998.
Coronado (AGF 11)/07194 (Note 7) 3rd Qtr 5. JSIPS-N System Upgrade.
Nassau (LHA 4)/20725 (Note 3) 3rd Qtr 6. Formal JSIPS-N Training Site.
Theodore Roosevelt (CVN 71)/21247 (Note 5] 3rd Qtr 7. Partial JSIPS-N Installation (PTW/SPA/NIS).
Kearsarge (LHD 3)/21700 (Note 3) 3rd Qtr
Constellation (CV 64)/03364 (Note 5) 4th Qtr
II.A.1.a. Ready for Operational and Fleet Support Use - New Development Introduction Schedule (cont.)
Unit/Activity/Hull No/UIC. PFY CFY FY-99 FY-00 FY-01 FY 02
Mount Whitney (LCC 20)/20001 (Note 7) 1st Qtr
Bataan (LHD 5)21879 (Note 3) 1st Qtr
John F. Kennedy (CV 67)/03367 1st Qtr
COMFIFTHFLT/57045 (Note 4) 1st Qtr
Blue Ridge (LCC 19)/05840 (Note 7) 2nd Qtr
LaSalle (AGF 3)/07172 (Note 7) 2nd Qtr
Wasp (LHD 1)/21560 (Note 3) 2nd Qtr
Tarawa (LHA 1)/20550 (Note 5) 2nd Qtr
Harry S. Truman (CVN 75)/21853 3rd Qtr
Peleliu (LHA 5)20748 (Note 3) 3rd Qtr
Essex (LHD 2)/21533 (Note 5) 4th Qtr
Saipan (LHA-2)/20632 1st Qtr
Bon Homme Richard (LHD 6)/22202 1st Qtr
Belleau Wood (LHA 3)/20633 3rd Qtr
Kearsarge (LHD 3)/21700 (Note 5) 4th Qtr
Nimitz (CVN 68)/03368 2nd Qtr
Wasp (LHD 1)/21560 (Note 5) TBD
Nassau (LHA 4)/20725 (Note 5) TBD
Boxer (LHD 4)/21808 (Note 5) TBD
Carl Vinson (CVN 70)/20993 (Note 5) TBD
Theodore Roosevelt (CVN 71)/21247 (Note 5) TBD
George Washington (CVN 73)/21412 (Note 5) TBD
Ronald Reagan (CVN 76)/22178 TBD
II.A.1.b. Military Billets per Fleet Operational Unit and or Activities - New
Equipment/
System/ Total Per Rank NOBC
Subsystem Ship or Operator Maintenance Rate PNEC SNEC
Designation Activity Off Enl Off Enl Rating PMOS SMOS
JSIPS-N 7 0 3 0 0 IS2 3926 3910/
AN/SYQ-23 0000
CV/CVN 0 2 0 0 RM3 2720
LHA/LHD
AGF/LCC
Requirements 0 0 0 2 ET3 1654
Notes 1 - 3
Totals 7 0 5 0 2
Notes:
1. Billets are displayed for information and computation of training requirements only. NTP-A-50-9204A identified a
requirement for three IS1s holding NEC IS-3925 (DIWSA Operator/Analyst). Given the recent decision by the Program
Sponsor (N88) to defer installation of the DIWSA onboard large deck amphibious ships (LHA/LHD) and fleet flagships (AGF/LCC) and fleet concerns with the training, qualification and certification requirements for the ship’s company DIWSA
Operator, the NEC 3925 requirement for JSIPS-N has been deleted.
2. NAVMAC concluded in their analysis, that with few exceptions, the watch stations required to support the billets listed
above already exist in the applicable Ship Manpower Document. No additional manpower is required to satisfy JSIPS-N requirements on CVs/CVNs, LHAs or LHDs. NAVMAC ltr 5311 Ser 412/0383 of 13 Jun 95 pertains.
3. Manpower requirements to support operation and maintenance of the JSIPS-N equipment to be installed in AGFs and LCCs were not included in the manpower analysis described above. However, based upon discussions at the NTP Conference conducted 11-13 March 1996, it was agreed that the manpower requirements should be the same as those described above for LHAs and LHDs.
II.A.1.b. Military Billets per Fleet Operational Unit and or Activities - New (cont.)
Equipment/
System/ Total Per Rank NOBC
Subsystem Ship or Operator Maintenance Rate PNEC SNEC
Designation Activity Off Enl Off Enl Rating PMOS SMOS
JSIPS-N TBD
AN/SYQ-23
COMFIFTHFLT Elements of JSIPS-N will be co-located with APS equipment in facilities currently being
UIC 57007 developed. Equipment will be operated and maintained by a contingent of people assigned to
COMFIFTHFLT staff. However, the specific number of military billets required to support the
operation and maintenance of this equipment is yet to be determined.
OPNAV N864F is coordinating manning, training, certification, and installation issues.
II.A.1.c. Total Number of Billets Required by Fleet Support Units and/or Activities - New
Fleet
Support Total Per O&M Rank NOBC
Unit & Unit Operator Maintenance Other Team Rate PNEC SNEC
UIC Off Enl Off Enl Off Enl Off Enl Off Enl Rating PMOS SMOS
NSWCDD This facility was previously utilized to support DIWS and DIWSA software testing and support
Dahlgren functions. There are no military billets established at this activity to support JSIPS-N functions.
UIC 00178
Washington WPC is a laboratory and test facility for PMA-281 programs. There are no military billets established
Planning at the WPC to support JSIPS-N software maintenance requirements.
Center
UIC N00032
SPAWARSYSCEN SPAWARSYSCEN Philadelphia is the In-Service Engineering Agent (ISEA) for PMA-281 programs.
San Diego Det There are no military billets established at this activity to support ISEA functions performed in
Philadelphia support of JSIPS-N.
UIC 68592
NSAWC Elements of JSIPS-N are co-located with APS equipment in imagery vans located at Naval Strike Air
Fallon Warfare Center (NSAWC) Fallon. The APS/JSIPS-N equipment is utilized to support the strike UIC 59350 warfare school and BG advanced team training. Manpower required to operate and maintain this
equipment are addressed in the current Afloat Systems NTP (NTP-A-00-9001C) approved by
OPNAV (N869) on 16 October 1998.
FITCPAC At the request of FITCPAC, PMA-281 has installed a TAC-4 Precision Targeting Workstation (PTW)
San Diego at the Fleet Intelligence Training Center (FITCPAC). The PTW is being utilized to support both delta
UIC 0388A and refresher training for personnel located in the San Diego area. There are no new military billets
required at FITCPAC to support this training.
II.A.1.d. Total Fleet and Fleet Support Billets for New System
Rank/ NOBC CFY &
Rating/ PNEC Prior FY-99 FY-00 FY-01 FY-02
Rate PMOS Enl Enl Enl Enl Enl
Fleet IS (E4-E6) 3926 36 27 12 3 0
RM3 2720 0 0 0 0 0
Fleet Support N/A
Maintenance
Fleet ET3 1654 24 18 8 2 0
Fleet Support N/A
Oper & Maint
Fleet N/A
Fleet Support N/A
Fleet Total: 60 45 20 5 0
Fleet Support Total: 0 0 0 0 0
Grand Total: 60 45 20 5 0
Note:
1. Data is being displayed for information and computation of training requirements only. There are no officer billet requirements or new enlisted fleet and fleet support billet requirements for JSIPS-N.
2. For the RM3-2720, throughput requirements are addressed in the GCCS-M NTSP (E-70-9804) approved 23 July
1998. JSIPS-N system administration training occurs within the normal GCCS-M Afloat System Administration training
pipeline, as shown in Part I, Figure I-12 of this NTP. See Part I, paragraph I.M.2 for additional information.
3. For the ET3-1654, throughput requirements are addressed in the GCCS-M NTSP (E-70-9804) approved 23 July
1998. JSIPS-N maintenance training occurs within the normal Intelligence Center Maintenance training pipeline, as shown in Part I, Figure I-13 of this NTP. See Part I, paragraph I.M.2 for additional information.
4. U S Marine Corps (USMC) requirements are listed separately on page II-8.
II.A.1.d. Total Fleet and Fleet Support Billets for New System
Rank/ NOBC CFY &
Rating/ PNEC Prior FY-99 FY-00 FY-01 FY-02
Rate PMOS Enl Enl Enl Enl Enl
USMC Requirements
Operation
Fleet E6 0241 10 10 10 10 10
Fleet Support N/A
Maintenance
Fleet N/A
Fleet Support N/A
Oper & Maint
Fleet N/A
Fleet Support N/A
Fleet Total: 10 10 10 10 10
Fleet Support Total: 0 0 0 0 0
Grand Total: 0 10 10 10 10
Note:
1. Billets are displayed for information and computation of training requirements only. There are no USMC officer billet
requirements projected for JSIPS-N.
2. Projections are based upon training 108 enlisted Marines per year (2 marines per embarked staff or squadron). This
will support 2 LANTFLT and 2 PACFLT LHA/LHD deployments per year. Annual breakout includes four Marines
assigned to Marine Corps Forces Atlantic, four Marines assigned to Marine Corps Forces Pacific, and two Marines
assigned to Marine Corps Forces Okinawa.
II.A.4. Training Activities Staff (Instructor/Support) Billet Requirements
Course/Type School/ CFY & Rank/ NOBC
of Training Location Prior FY-99 FY-00 FY-01 FY-02 Rate PNEC
CIN UIC Enl Enl Enl Enl Enl Rating PMOS
Imagery NMITC 2 0 0 0 0 IS1 3926/
Dissemination Dam Neck 9502
Manager 49441
J-150-2973
GCCS-M NMITC 2 0 0 0 0 RM1 2720/
Afloat System Dam Neck 9502
Administration 0387A
J-150-2955
Intelligence NMITC 0 0 0 0 0 ET1 1654/
Center Dam Neck 9502
Maintenance 0387A
J-150-2019
Total 4 0 0 0 0
Note:
1. The Imagery Dissemination Manager course (J-150-2973) is supported by PMA-281. Instructor requirements for this
course are described in Part I, paragraph I.M.5.
2. The GCCS-M Afloat System Administration course (J-150-2955) is under the cognizance of CNET ETE412.
Instructor requirements for this course are addressed in the GCCS-M NTSP (E-70-9804).
Additional Instructor requirements to support JSIPS-N are described in Part I, paragraph I.M.5.
3. The Intelligence Center Maintenance course (J-150-2019) is under the cognizance of CNET ETE412.
Instructor requirements for this course are addressed in the GCCS-M NTSP (E-70-9804).
There have been no additional instructor requirements identified to support JSIPS-N Non-TAC equipment described in
Part I, paragraph I.M.3.
II.A.5. Chargeable Student Billet Requirements
CFY &
Activity/ Prior FY-99 FY-00 FY-01 FY-02
Location/UIC Course Enl Enl Enl Enl Enl
NMITC J-150-2973 0 3 3 3 3
Dam Neck, VA Imagery
49441 Dissemination
Manager Course
NMITC J-150-2955 0 0 0 0 0
Dam Neck, VA GCCS-M Afloat
0387A System Admin
Course
NMITC J-150-2019 0 0 0 0 0
Dam Neck, VA Intelligence Center
0387A Maintenance
Course
Total: 0 3 3 3 3
Note:
1. There are no officer billet requirements for JSIPS-N.
2. There are no chargeable student billet requirements for RM personnel who will perform JSIPS-N System Admin
functions. Training occurs as part of the GCCS-M Afloat System Admin training pipeline shown in Part I, Figure I-12. The
throughput requirements for that pipeline are addressed in the GCCS-M NTSP (E-70-9804).
3. There are no chargeable student billet requirements for ET personnel who will maintain the JSIPS-N equipment.
Training occurs as part of the Intelligence Center training pipeline shown in Part I, Figure I-13. The throughput
requirements for that pipeline are addressed in the GCCS-M NTSP (E-70-9804).
II.A.6. Net Annual Incremental and Cumulative Billet Increases/Decreases
CFY &
Billet Prior FY-99 FY-00 FY-01 FY-02
Base +/- CUM +/- CUM +/- CUM +/- CUM +/- CUM
Enlisted
Fleet ACDU/TAR N/A 0 0 0 0 0 0 0 0 0 0
Billets SELRES N/A 0 0 0 0 0 0 0 0 0 0
Fleet ACDU/TAR N/A 0 0 0 0 0 0 0 0 0 0
Support SELRES N/A 0 0 0 0 0 0 0 0 0 0
Billets
Staff ACDU/TAR N/A 4 4 0 4 0 4 0 4 0 4
Billets SELRES N/A 0 0 0 0 0 0 0 0 0 0
Instructor/
Support
Chargeable ACDU/TAR N/A 0 0 +3 3 0 3 0 3 0 3
Student SELRES N/A
Billets
Note: There are no officer billet requirements for JSIPS-N.
II.B PERSONNEL REQUIREMENTS
II.B.2 Fleet and Fleet Support Adjusted Annual Training Input Requirements - Skill Progression and Functional TrainingCourse Title: Imagery Dissemination Manager
CIN: J-150-2973
Course Length: 4 Weeks
Course Attrition Factor: 2 %
Sea Tour Length: 42 Months for Navy personnel
Backout Factor: 0.08
CFY &
Rank/ PNEC/ Prior FY-99 FY-00 FY-01 FY-02
IS (E4-E6) 3926 36 27 27 27 27
USMC (E6) 0241 0 10 10 10 10
Total: 36 37 37 37 37
Note:
1. There are no officer training requirements for JSIPS-N.
2. JSIPS-N will be installed aboard 12 CV/CVNs, 11 LHA/LHDs, and 4 AGF/LCCs. Requirements dictate that each site have
three IS personnel holding NEC IS-3926. Based upon 42 month sea-tour, training input is based upon training
requirement of one student per site per year (27).
3. For USMC, annual training input requirements are based upon training 10 enlisted Marines per year (2 marines per embarked staff or squadron). This will support 2 LANTFLT and 2 PACFLT LHA/LHD deployments per year. Annual breakout includes four Marines assigned to Marine Corps Forces Atlantic, four Marines assigned to Marine Corps Forces
Pacific, and two Marines assigned to Marine Corps Forces Okinawa.
II.B.2 Fleet and Fleet Support Adjusted Annual Training Input Requirements - Skill Progression and Functional Training (cont.)
Course Title: GCCS-M Afloat System Administration
CIN: J-150-2955
Course Length: 8 Weeks
Course Attrition Factor: 1 %
Sea Tour Length: 36-48 months
Backout Factor: 0.1
CFY &
Rank/ PNEC/ Prior FY-99 FY-00 FY-01 FY-02
RM3 2720 0 0 0 0 0
Total: 0 0 0 0 0
Note:
1. This course of instruction is on-going at NMITC.
2. Course is under the cognizance of CNET ETE412.
3. System administration training occurs within the normal GCCS-M Afloat System Administrator training pipeline, as shown
in Part I, Figure I-12 of this NTP. The throughput requirements for that pipeline are addressed in the GCCS-M NTSP
(E-70-9804).
II.B.2 Fleet and Fleet Support Adjusted Annual Training Input Requirements - Skill Progression and Functional Training (cont.)
Course Title: Intelligence Center Maintenance
CIN: J-150-2019
Course Length: 8 Weeks
Course Attrition Factor: 1 %
Sea Tour Length: 48 months
Backout Factor: 0.16
CFY &
Rank/ PNEC/ Prior FY-99 FY-00 FY-01 FY-02
ET3 1654 0 0 0 0 0
Total: 0 0 0 0 0
Note:
1. This course of instruction is on-going at NMITC.
2. Course is under the cognizance of CNET ETE412.
3. Training occurs as part of the Intelligence Center training pipeline shown in Part I, Figure I-13. The throughput
requirements for that pipeline are addressed in the GCCS-M NTSP (E-70-9804).
II.B.5. Total Number of Instructor and Support Personnel Required for Training Activities
School/ Required Operator Maint SYSADMIN Support Rank/ NOBC
Location/ On Board J-150-2973 J-150-2019 J-150-2955 Personnel Rate/ PNEC
UIC Mo Yr Off Enl Off Enl Off Enl Off Enl Rating PMOS
NMITC 01 98 0 2 0 0 IS1 3926/
Dam Neck 9502
UIC
49441
NMITC 01 98 0 0 0 0 RM1 2720/
Dam Neck 9502
UIC
0387A
NMITC On Going 0 0 0 0 ET1 1654/
Dam Neck 9502
UIC
0387A
Note:
1. The GCCS-M Afloat System Administration Course (J-150-2955) is under the cognizance of CNET ETE412.
Instructor requirements for this course are addressed in the GCCS-M NTSP (E-70-9804).
Additional Instructor requirements to support JSIPS-N are described in Part I, paragraph I.M.5.
2. The Intelligence Center Maintenance Course (J-150-2019) is under the cognizance of CNET ETE412.
Instructor requirements for this course are addressed in the GCCS-M NTSP (E-70-9804).
There have been no additional instructor requirements identified to support JSIPS-N Non-TAC equipment described in
Part I, paragraph I.M.3.
II.B.6 Total Annual Training Input Requirements to Attain and Sustain Fleet, Fleet Support, Instructor and Support Requirements
CFY &
Source/Type Source of PNEC Prior FY-99 FY-00 FY-01 FY-02
Training Requirement PMOS Enl Enl Enl Enl Enl
Operator Course
Course: Imagery Dissemination Manager
CIN: J-150-2973
PNEC: IS-3926
Fleet & Fleet Support 3926 36 27 27 27 27
Other Service (USMC) 0241 10 10 10 10 10
Instructor/Support 3926 2 0 0 2 0
Total 38 37 37 39 37
Note:
1. JSIPS-N will be installed aboard 12 CV/CVNs, 11 LHA/LHDs, and 4 AGF/LCCs. Requirements dictate that each site
have three IS personnel holding NEC IS-3926. Based upon 42 month sea-tour, training input is based upon training
requirement of one student per site per year (27).
2. For USMC, annual training input requirements are based upon training 10 enlisted Marines per year (2 marines per
embarked staff or squadron). This will support 2 LANTFLT and 2 PACFLT LHA/LHD deployments per year. Annual
breakout includes four Marines assigned to Marine Corps Forces Atlantic, four Marines assigned to Marine Corps
Forces Pacific, and two Marines assigned to Marine Corps Forces Okinawa.
II.B.6 Total Annual Training Input Requirements to Attain and Sustain Fleet, Fleet Support, Instructor and Support
Requirements
CFY &
Source/Type Source of PNEC Prior FY-99 FY-00 FY-01 FY-02
Training Requirement PMOS Enl Enl Enl Enl Enl
System Administrator Course
Course: GCCS-M Afloat System Administration
CIN: J-150-2955
PNEC: RM-2720
Fleet & Fleet Support 2720 0 0 0 0 0
Other Service N/A 0 0 0 0 0
Instructor/Support 2720 2 0 0 2 0
Total 2 0 0 2 0
Note: System administration training occurs within the normal JMCIS/NTCS-A System Administrator training pipeline, as
shown in Part I, Figure I-12 of this NTP. The throughput requirements for that pipeline are addressed in the
GCCS-M NTSP (E-70-9804).
II.B.6 Total Annual Training Input Requirements to Attain and Sustain Fleet, Fleet Support, Instructor and Support Requirements
CFY &
Source/Type Source of PNEC Prior FY-99 FY-00 FY-01 FY-02
Training Requirement PMOS Enl Enl Enl Enl Enl
Maintenance Course
Course: Intelligence Center Maintenance
CIN: J-150-2019
PNEC: ET-1654
Fleet & Fleet Support 1654 0 0 0 0 0
Other Service N/A 0 0 0 0 0
Instructor/Support 1654 0 0 0 0 0
Total 0 0 0 0 0
Note: Maintenance training occurs as part of the Intelligence Center training pipeline shown in Part I, Figure I-13. The
throughput requirements for that pipeline are addressed in the GCCS-M NTSP (E-70-9804).