| COST ($ In Thousands) | FY 1996 Actual | FY 1997 Estimate | FY 1998 Estimate | FY 1999 Estimate | FY 2000 Estimate | FY 2001 Estimate | FY 2002 Estimate | FY 2003 Estimate | Cost to Complete | Total Cost | |
| Total Program Element (PE) Cost | 19,870 | 10,612 | 3,427 | 3,765 | 0 | 0 | 0 | 0 | 0 | 37,674 | |
| 4401 | Air Force Mission Support System | 2,801 | 5,200 | 948 | 0 | 0 | 0 | 0 | 0 | 0 | 8,949 |
| 4370 | Advanced Weapons Integration | 3,832 | 0 | 2,479 | 3,765 | 0 | 0 | 0 | 0 | 0 | 10,076 |
| 4371 | Global Positioning System TACAN Emulation | 8,866 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 8,866 |
| 4402 | Electronic Countermeasures Improvement | 0 | 4,818 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 4,818 |
| 4493 | B-61 Mod 11 Flight Tests | 4,371 | 594 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 4,965 |
| Quantity of RDT&E Articles | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
(U) A. Mission Description and Budget Item Justification
This program is in budget activity 7 - Operational System Development, Research Category 6.6 because it supports a currently operational system. The B-52 is the
primary nuclear roled bomber in the USAF inventory. It provides the only Air Launch Cruise Missile carriage in the USAF. The B-52 also provides theater CINCs
with a long range strike capability. The B-52 is undergoing a Conventional Enhancement Modification which allows it to carry MIL-STD 1760 weapons. The current
service life of the aircraft extends to 2040. The Advanced Weapons Integration (AWI) program supports the conventional enhancement of the B-52 through the
addition of the Wind Corrected Munitions Dispenser (WCMD), Joint Direct Attack Munition (JDAM), Joint Stand-off Weapon (JSOW), and the Joint Air-to-Surface
Stand-off Missile (JASSM). The Air Force Mission Support System supports the Air Force movement of all mission planning to a common system. GPS TACAN
Emulation provides support to the Congressionally-directed GPS-2000. Electronic Countermeasures Improvement supports a DESERT STORM identified deficiency.
The B-61 Mod 11 program was added at the direction of the Nuclear Posture Review and Presidential Decision Directive-30. The B-52 program management is
provided by Air Force Material Command's Oklahoma Air Logistics Center. The prime contractor for these projects is Boeing Defense and Space Group.
(U) Acquisition Strategy:
1. The AFMSS program is organically conducted at OC-ALC/LAS. Previously funded by the AFMSS program element.
2. The AWI program placed Boeing Defense and Space Group, Wichita KS, (BD&SG) on a Cost-Plus-Fixed-Fee contract as the Product Development Organization supported by OC-ALC/LH. Due to the short notice requirement, interface development and initial software requirements definition is being accomplished under the B-52 fleet support contract; a time and materials contract. The first phase will be to support the Direct Attack Stores Management Overlay (SMO) Developmental Test and Evaluation (DT&E) and DT&E of hardware interface equipment. The Direct Attack SMO supports WCMD and JDAM. The second phase will support the DT&E of the Stand-off SMO. The Stand-off SMO supports JSOW and JASSM. Due to the need for rapid Required Assets Availability and Initial Operational Capability dates, the Single Acquisition and Management Plan directed concurrence for RDT&E of the Direct Attack SMO and the production hardware (MIL-STD 1760 umbilicals to transfer 1760 data from the weapons pylon to the weapon itself). Although production continues through development of the Stand-off SMO, development of the production materials is completed in FY 97. JSOW and JASSM will use the same umbilicals as WCMD and JDAM.
3. The GPS TACAN program placed Boeing Defense and Space Group, Wichita, KS on a Firm-Fixed-Price contract as the Product Development Organization, supported by OC-ALC/LH, WR-ALC/LKN.
4. The ECM Improvement program placed Boeing Defense and Space Group, Wichita, KS and ITT Avionics Nutley, NJ on Firm-Fixed-Price contracts as Product Development Organizations. Boeing provides the aircraft specific integration expertise, while ITT provides expertise on the ALQ-172 system. They are supported by OC-ALC/LH and WR-ALC/LNR.
5. The Department of Energy is organically conducting the modifications to the B-61 Mod 11 weapon.
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 16,505 | 7,457 | 955 | 0 | 24,917 |
| (U) Appropriated Value | 21,005 | 11,035 | 21,005 | ||
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | -1,129 | -231 | |||
| b. SBIR | -192 | ||||
| c. Omnibus or Other Above Threshold Reprogram | 0 | ||||
| d. Below Threshold Reprogramming | 0 | ||||
| (U) Adjustments to Budget Years Since FY 1997 PB | 0 | 2,472 | 3,765 | ||
| (U) Current Budget Submit/President's Budget | 19,870 | 10,612 | 3,427 | 3,765 | 37,674 |
(U) Change Summary Explanation:
Funding: FY 96 Congressional Appropriations added $4.5M for AGM-130 Integration. Since Air Combat Command did not have a requirement to integrate the
AGM-130 on the B-52 Congress authorized the Air Force to transfer these funds into the B-62 Mod 11 program. FY 98 PB adds $2.5M to FY 98 and
$3.8M to FY 99 for Advanced Weapons Integration.
Schedule: None
Technical: None
(U) C. Other Program Funding Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost | |
| (U) Aircraft Procurement (PE 11113F) | 4,765 | 8,782 | 28,854 | 61,641 | 43,039 | 34,241 | 20,953 | 6,779 | 0 | 209,054 |
| (U) Missile Procurement (PE 11113F) | 2,002 | 1,855 | 0 | 0 | 0 | 0 | 0 | 0 | n/a | 3,857 |
| (U) Mission Planning Systems (PE 28006F) | 180 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | n/a | 180 |
(U) D. Schedule Profile
| FY 1997 | FY 1998 | FY 1999 | FY 2000 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) WCMD/JDAM IOC | X | |||||||||||||||
| (U) GPS TACAN IOC | X | |||||||||||||||
| (U) ECM Improvement IOC | X | |||||||||||||||
| (U) B-61 Mod 11 Flight Test Completed | X |
(U) A. Mission Description and Budget Item Justification
Air Force Mission Support System (AFMSS) previously funded out of the AFMSS program element. Develops an aircraft specific avionics/weapons/electronic
countermeasures (A/W/E) module to be used in conjunction with core AFMSS. AFMSS is the replacement mission planning system for the current B-52 Mission Data
Preparation System. AFMSS will provide future ground/inflight mission planning capability. Block 1 provides the capability to plan conventional gravity missions at the
unit level. Block 2 provides the capability to plan nuclear and advanced weapons via AFMSS. Block 3 of this project will add smart weapons (like JDAM and JASSM)
capabilities and enhancements to the first two AFMSS blocks. Provides funding for the Periodic Depot Maintenance of the B-52 test aircraft stationed at Edwards Air Force
Base.
(U) FY 1996 ($ in Thousands):
| (U) $2,801 | Support WCMD and JDAM flight test with Block 1.3 engineering release |
| (U) $2,801 | Total |
(U) FY 1997 ($ in Thousands):
| (U) $5,200 | Develop Block 2 operational software for WCMD and JDAM, and PDM for the B-52 test aircraft |
| (U) $5,200 | Total |
(U) FY 1998 ($ in Thousands):
| (U) $948 | Develop Block 3 operational software for JSOW and JASSM, and other advanced weapons, as required |
| (U) $948 | Total |
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 2,983 | 5,507 | 951 | 0 | 6,320 |
| (U) Appropriated Value | 2,983 | 5,507 | 0 | 0 | 8,490 |
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | -182 | 0 | 0 | 0 | -182 |
| b. SBIR | 0 | 0 | 0 | 0 | 0 |
| c. Omnibus or Other Above Threshold Reprogram | 0 | 0 | 0 | 0 | 0 |
| d. Below Threshold Reprogramming | 0 | 0 | 0 | 0 | 0 |
| (U) Adjustments to Budget Years Since FY 1997 PB | -182 | -307 | -3 | 0 | -492 |
| (U) Current Budget Submit/President's Budget | 2,801 | 5,200 | 948 | 0 | 8,949 |
(U) Change Summary Explanation:
Funding: $3,121 added to FY97 budget to support Periodic Depot Maintenance of the B-52 test aircraft.
Schedule: None
Technical: None
(U) C. Other Program Funding Summary ($ in Thousands) - not applicable
(U) D. Schedule Profile
The B-52 peculiar mission planning software development is accomplished and delivered incrementally. Each work package within a block build is treated as a mini-development with its own analysis, design, and test. The work package are integrated with one another and with the AFMSS core. Requirements are continually evolving, however, the program is geared to complete known requirements by Sep 98.
| FY 1996 | FY 1997 | FY 1998 | FY 1999 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) Contract award Block 2 | X | |||||||||||||||
| (U) Software development Block 2 | X | X | X | X | X | |||||||||||
| (U) Contract award Block 3 | X | |||||||||||||||
| (U) Software development Block 3 | X | X | X | X | ||||||||||||
| (U) Test aircraft PDM | X |
(U) A. Project Cost Breakdown ($ in Thousands)
| FY 1996 | FY 1997 | FY 1998 | FY 1999 | |
| (U) Software development | 2,751 | 2,050 | 885 | 0 |
| (U) System Program Office support | 50 | 50 | 63 | 0 |
| (U) OC-ALC/LH Program Depot Maintenance | 0 | 3,100 | 0 | 0 |
| (U) Total | 2,801 | 5,200 | 948 | 0 |
(U) B. Budget Acquisition History and Planning Information ($ in Thousands)
Performing Organizations:
| Contractor or Government Performing Activity | Contract Method/Type or Funding Vehicle |
Award or Obligation Date |
Performing Activity EAC |
Project Office EAC |
Total Prior to FY 1996 |
Budget FY 1996 |
Budget FY 1997 |
Budget FY 1998 |
Budget FY 1999 |
Budget to Complete |
Total Program |
| Product Development Organizations |
| Oklahoma
ALC/LAS |
Project Order |
|
5,686 |
0 |
2,751 |
2,050 |
885 |
0 |
n/a |
5,686 |
|
Support and Management Organizations |
| OC-ALC/LH
OC-ALC/LH |
Project order
Project order |
163
3,100 |
0 | 50 | 50
3,100 |
63 | 0 | n/a | 3,263 |
|
Test and Evaluation Organizations |
| OO-ALC/LIRC
USAFAWC/28 TESTS |
compatability flight testing Project order |
(U) A. Mission Description and Budget Item Justification
The requirement exists for the integration of near precision and precision guided MIL-STD 1760 weapons on the B-52. This includes the Wind Corrected Munitions
Dispenser (WCMD), Joint Direct Attack Munition (JDAM), Joint Stand-off Weapon (JSOW), and the Joint-Air-to-Surface Stand-off Missile (JASSM). The B-52 is
designated as the threshold bomber test platform for WCMD, JDAM, and JASSM with the objective of meeting aircraft integration and weapon testing requirements. To
provide complete understanding of the program and its funding, the following schedule information will reflect the money received from the WCMD, JDAM, and JASSM
program elements for weapons integration on the B-52.
(U) FY 1996 ($ in Thousands):
| (U) $3,832 | Software requirements for WCMD and JDAM. Hardware requirements for WCMD, JDAM, JSOW, and JASSM. |
| (U) $3,832 | Total |
(U) FY 1997 ($ in Thousands):
| (U) $0 | Total |
(U) FY 1998 ($ in Thousands):
| (U) $2,479 | Software development for JSOW and JASSM |
| (U) $2,479 | Total |
(U) FY 1999 ($ in Thousands):
| (U) $3,765 | Software development for JSOW and JASSM |
| (U) $3,765 | Total |
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 3,977 | 0 | 2,489 | 3,784 | 10,250 |
| (U) Appropriated Value | 3,900 | 0 | 0 | 0 | 3,900 |
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | -68 | 0 | 0 | 0 | -68 |
| b. SBIR | 0 | 0 | 0 | 0 | 0 |
| c. Omnibus or Other Above Threshold Reprogram | 0 | 0 | 0 | 0 | 0 |
| d. Below Threshold Reprogramming | 0 | 0 | 0 | 0 | 0 |
| (U) Adjustments to Budget Years Since FY 1997 PB | 0 | 0 | -10 | -19 | 6,176 |
| (U) Current Budget Submit/President's Budget | 3,832 | 0 | 2,479 | 3,765 | 10,076 |
(U) Change Summary Explanation:
Funding: FY 96 -$68K Undistributed Congressional Reductions.
Schedule: None
Technical: None
(U) C. Other Program Funding Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost | |
| (U) RDT&E (WCMD - PE 27600F) | 5,900 | 3,035 | 0 | 0 | 0 | 0 | 0 | 0 | n/a | 8,935 |
| (U) RDT&E (JDAM - PE 27583F) | 4,525 | 7,110 | 0 | 0 | 0 | 0 | 0 | 0 | n/a | 11,635 |
| (U) RDT&E (JASSM - PE 27160F) | 1,500 | 8,500 | 8,000 | 3,400 | 0 | 0 | 0 | 0 | n/a | 21,400 |
| (U) Aircraft Procurement (PE 11113F) | 0 | 4,181 | 6,600 | 5,100 | 0 | 0 | 0 | 0 | n/a | 15,881 |
(U) D. Schedule Profile
| FY 1996 | FY 1997 | FY 1998 | FY 1999 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) Direct Attack SMO | ||||||||||||||||
| (U) Software/hardware Req DT&E | X | X | X | |||||||||||||
| (U) Test planning | X | X | X | X | X | X | ||||||||||
| (U) Technical data development | X | X | X | X | X | |||||||||||
| (U) Ground/flight testing | X | X | X | X | ||||||||||||
| (U) AFMSS module DT&E | X | X | X | X | X | X | X | X | ||||||||
| (U) Program office support | X | X | X | X | X | X | X | X | ||||||||
| (U) Stand-off SMO | ||||||||||||||||
| (U) Contractor Interface Development | X | X | ||||||||||||||
| (U) Software/hardware Req DT&E | X | X | X | X | X | X | X | X | ||||||||
| (U) Test planning | X | X | X | X | X | X | X | |||||||||
| (U) Technical data development | X | X | X | |||||||||||||
| (U) Ground/flight testing | X | X | X | X | X | X | X | X | ||||||||
| (U) AFMSS module DT&E | X | X | X | X | X | X | X | X | X | X | ||||||
| (U) Program support office | X | X | X | X | X | X | X | X | X | X | X | X |
(U) A. Project Cost Breakdown ($ in Thousands)
| FY 1996 | FY 1997 | FY 1998 | FY 1999 | |
| (U) Software/hardware requirements | 3,832 | 0 | 2,479 | 3,765 |
| (U) Total | 3,832 | 0 | 2,479 | 3,765 |
(U) B. Budget Acquisition History and Planning Information ($ in Thousands)
Performing Organizations:
| Contractor or Government Performing Activity | Contract Method/Type or Funding Vehicle |
Award or Obligation Date |
Performing Activity EAC |
Project Office EAC |
Total Prior to FY 1996 |
Budget FY 1996 |
Budget FY 1997 |
Budget FY 1998 |
Budget FY 1999 |
Budget to Complete |
Total Program |
| Product Development Organizations |
| Boeing Defense and Space Group Wichita, KS |
CPFF |
10,076 |
0 |
0 |
3,832 |
0 |
2,479 |
3,765 |
n/a |
10,076 |
|
Support and Management Organizations |
|
Test and Evaluation Organizations |
(U) B. Budget Acquisition History and Planning Information Continued ($ in Thousands)
Government Furnished Property: None
(U) A. Mission Description and Budget Item Justification
GPS TACAN Emulation includes installation of a Control Display Unit (CDU) at the pilot and copilot stations and the integration of concurrent TACAN capabilities
into the on-board GPS system. The TACAN Replacement System (TRS) will satisfy current TACAN emulation requirements directed by Congressional mandate and
provide an architecture to expand/increase navigational capabilities/requirements planned by FAA and International Civil Organization bodies. The system allows the
crew to fly a non-precision approach using the GPS constellation for navigation guidance. In addition, as an open architecture system, it can be easily upgraded to
allow precision approaches when standards are established.
(U) FY 1996 ($ in Thousands):
| (U) $1,281 | System Requirement Review completion |
| (U) $100 | Preliminary Design Review |
| (U) $1,900 | Fabrication of lab demonstration system |
| (U) $3,300 | Fabrication of system mock-up |
| (U) $2,000 | Fabrication of prototype unit |
| (U) $85 | Critical Design Review |
| (U) 200 | Test and Evaluation |
| (U) $8,866 | Total |
(U) FY 1997 ($ in Thousands):
| (U) $0 | No activity |
(U) FY 1998 ($ in Thousands):
| (U) $0 | No activity |
(U) FY 1999 ($ in Thousands):
| (U) $0 | No activity |
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 9,545 | 0 | 0 | 0 | 9,545 |
| (U) Appropriated Value | 9,360 | 0 | 0 | 0 | 9,360 |
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | -494 | 0 | 0 | 0 | -494 |
| b. SBIR | 0 | 0 | 0 | 0 | 0 |
| c. Omnibus or Other Above Threshold Reprogram | 0 | 0 | 0 | 0 | 0 |
| d. Below Threshold Reprogramming | 0 | 0 | 0 | 0 | 0 |
| (U) Adjustments to Budget Years Since FY 1997 PB | -494 | 0 | 0 | 0 | -494 |
| (U) Current Budget Submit/President's Budget | 8,866 | 0 | 0 | 0 | 8,866 |
(U) Change Summary Explanation:
Funding: $494 taken in FY 96 for Undistributed Congressional Reductions and bills to pay for Bosnia operations.
Schedule: Schedule changes were necessary to provide concurrent RDT&E with GPS Line-Replaceable-Units (LRU) redesign effort. The requirement for 24
additional aircraft to receive NAVSTAR GPS provoked re-design of key Group B LRUs. The TRS new start provided an opportunity to combine the
two efforts, reducing additional LRUs originally planned for TRS and incorporating requirements into a single, integrated design. Thus, instead of
designing and fielding two separate systems (GPS and TRS), the software and hardware requirements will be integrated. Reducing engineering time and
independent costs associated with each program.
Technical: Technical changes include eliminating the requirement for a separate Interface Unit for TACAN and integrating TACAN system requirements in the
GPS Interface Unit, currently installed on NAVSTAR GPS equipped aircraft. This also eliminates the requirement for a Signal Data Converter to
interface the GPS and TRS. The majority of the TRS program requirements will affect software integration. The hardware requirements are essentially
CDUs at the pilot and copilot positions and associated Group A necessary for installation.
(U) C. Other Program Funding Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost | |
| (U) Aircraft Procurement (PE 11113F) | 0 | 3,000 | 11,400 | 15,700 | 4,662 | 0 | 0 | 0 | n/a | 34,762 |
(U) D. Schedule Profile
| FY 1996 | FY 1997 | FY 1998 | FY 1999 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) Contract award | X | |||||||||||||||
| (U) System Requirement Review documentation | X | |||||||||||||||
| (U) Human resource interface on equipment placement | X | |||||||||||||||
| (U) Preliminary Design Review | X | |||||||||||||||
| (U) Fabrication of upgraded development at contractor support facilities | X | X | X | |||||||||||||
| (U) Critical Design Review | X | |||||||||||||||
| (U) Development of prototype unit | X | X | X | |||||||||||||
| (U) Ground/flight testing | X | X | X |
(U) A. Project Cost Breakdown ($ in Thousands)
| FY 1996 | FY 1997 | FY 1998 | FY 1999 | |
| (U) System Requirement Review completion | 1,281 | |||
| (U) Preliminary Design Review completion | 100 | |||
| (U) Fabrication of lab demonstration system | 1,900 | |||
| (U) Fabrication of system mock-up | 3,300 | |||
| (U) Fabrication of prototype unit | 2,000 | |||
| (U) Critical Design Review | 85 | |||
| (U) Test and evaluation | 200 | |||
| (U) Total | 8,866 |
(U) B. Budget Acquisition History and Planning Information ($ in Thousands)
Performing Organizations:
| Contractor or Government Performing Activity | Contract Method/Type or Funding Vehicle |
Award or Obligation Date |
Performing Activity EAC |
Project Office EAC |
Total Prior to FY 1996 |
Budget FY 1996 |
Budget FY 1997 |
Budget FY 1998 |
Budget FY 1999 |
Budget to Complete |
Total Program |
| Product Development Organizations |
| Boeing Defense and Space Group Wichita, KS |
FFP |
Mar 96 |
8,766 |
0 |
8,766 |
0 |
0 |
0 |
n/a |
8,766 |
|
Support and Management Organizations |
| OC-ALC/LH
WR-ALC/LKN |
50
50 |
0 | 50
50 |
0
0 |
0
0 |
0
0 |
n/a
n/a |
50
50 |
|
Test and Evaluation Organizations |
(U) B. Budget Acquisition History and Planning Information Continued ($ in Thousands)
Government Furnished Property: None
(U) A. Mission Description and Budget Item Justification
The electronic countermeasures of the B-52 ALQ-172 ECM suite must be improved to cover a requirement identified during DESERT STORM. The improvement provides
for an increased memory capability to handle advanced threats as well as correcting a coverage capability problem. The project adds a third ALQ-172 to the ECM suite and
develops the new display required by the addition of the third system. The modification also improves two common core Line-Replaceable-Units. Normal circuit cards are
replaced with circuit cards holding erasable PROMs and gate array modules. Memory is increased 400% and Mean-Time-Between-Failure is increased. Development
program will be completed in FY 97.
(U) FY 1996 ($ in Thousands):
| (U) $0 | No activity |
| (U) $0 | Total |
(U) FY 1997 ($ in Thousands):
| (U) $150 | System Requirement Review |
| (U) $300 | Fabrication of lab mock-up |
| (U) $4,268 | Developmental kit fabrication |
| (U) $100 | System Program Office support |
| (U) $4,818 | Total |
(U) FY 1998 ($ in Thousands):
| (U) $0 | No activity |
| (U) $0 | Total |
(U) FY 1999 ($ in Thousands):
| (U) $0 | No activity |
| (U) $0 | Total |
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 0 | 5,071 | 0 | 0 | 5,071 |
| (U) Appropriated Value | 0 | 4,921 | 0 | 0 | 4,921 |
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | 0 | -103 | 0 | 0 | -103 |
| b. SBIR | 0 | 0 | 0 | 0 | 0 |
| c. Omnibus or Other Above Threshold Reprogram | 0 | 0 | 0 | 0 | 0 |
| d. Below Threshold Reprogramming | 0 | 0 | 0 | 0 | 0 |
| (U) Adjustments to Budget Years Since FY 1997 PB | 0 | 0 | 0 | 0 | -103 |
| (U) Current Budget Submit/President's Budget | 0 | 4,818 | 0 | 0 | 4,818 |
(U) Change Summary Explanation:
Funding: OSD directed reductions.
Schedule: None
Technical: None
(U) C. Other Program Funding Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost | |
| (U) Aircraft Procurement (PE 11113F) | 0 | 0 | 4,749 | 22,100 | 31,300 | 31,700 | 20,953 | 6,779 | n/a | 117,781 |
(U) D. Schedule Profile
| FY 1996 | FY 1997 | FY 1998 | FY 1999 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) Contract award | X | |||||||||||||||
| (U) Kit proof | X | |||||||||||||||
| (U) System Requirement Review | X |
(U) A. Project Cost Breakdown ($ in Thousands)
| FY 1996 | FY 1997 | FY 1998 | FY 1999 | |
| (U) System Requirement Review | 0 | 150 | 0 | 0 |
| (U) Mock-up fabrication | 0 | 300 | 0 | 0 |
| (U) Developmental kit proof | 0 | 4,268 | 0 | 0 |
| (U) System Program Office support | 0 | 100 | 0 | 0 |
| (U) Total | 0 | 4,818 | 0 | 0 |
(U) B. Budget Acquisition History and Planning Information ($ in Thousands)
Performing Organizations:
| Contractor or Government Performing Activity | Contract Method/Type or Funding Vehicle |
Award or Obligation Date |
Performing Activity EAC |
Project Office EAC |
Total Prior to FY 1996 |
Budget FY 1996 |
Budget FY 1997 |
Budget FY 1998 |
Budget FY 1999 |
Budget to Complete |
Total Program |
| Product Development Organizations |
| Boeing Defense
and Space Group
Wichita, KS
ITT Avionics, Nutley, NJ |
FFP
FFP |
Oct 96
Oct 96 |
4,418
300 |
0
0 |
0
0 |
4,418
300 |
0
0 |
0
0 |
n/a
n/a |
4,418
300 |
|
Support and Management Organizations |
| OC-ALC/LH
WR-ALC/LKN |
50
50 |
0
0 |
0
0 |
50
50 |
0
0 |
0
0 |
n/a
n/a |
50
50 |
|
Test and Evaluation Organizations |
| 419th FLTS Edwards AFB, CA | Project order |
(U) B. Budget Acquisition History and Planning Information Continued ($ in Thousands)
Government Furnished Property: None
(U) A. Mission Description and Budget Item Justification
The program involves development and testing of a modified nuclear weapon on B-52 operational aircraft. Replacement of a strategic weapon was recommended by
the Nuclear Posture Review and directed by Presidential Decision Review-30. Congress was notified during the second quarter of FY 1995, of the Department of
Defense, and the Department of Energy intent to modify an existing weapon to provide a replacement option. Modifications (made by the Department of Energy) to
the B-61 Mod 7 strategic bomb accomplish the mission requirements of the replaced weapon. Modification of an existing weapon is less expensive than the cost to
develop a new weapon from "scratch." Flight testing by the 419th FLTS, Edwards AFB, CA is required to certify the modified weapon mass and physic properties are
the same as the Mod 7 device. The Air Force asked and received permission from Congress to reprogram the $4.5M FY 96 Congressional plus-up for AGM-130
integration on the B-52, into the B-61 Mod 11 Flight Test program. This program will be completed in FY 97.
(U) FY 1996 ($ in Thousands):
| (U) $756 | Complete 6 Degree of Freedom aerodynamic analysis for release and initial development of flight test characteristics |
| (U) $981 | Complete operational flight tests for Major Assembly Release (MAR) and Aircraft Compatability Control Release Drawing release by DOE |
| (U) $1,221 | Complete aeroballistic and dispersion flight tests and Alaska proof test series for final aerodynamic model development verification of ballistic dispersion/CEP requirement defines in Military Characteristics (MCs) |
| (U) $1,413 | Data analysis and develop new ballistics tables for aircraft operational delivery |
| (U) $4,371 | Total |
(U) FY 1997 ($ in Thousands):
| (U) $594 | Complete data analysis and develop new ballistics tables for aircraft operational delivery |
| (U) $594 | Total |
(U) FY 1998 ($ in Thousands):
| (U) $0 | No activity |
| (U) $0 | Total |
(U) FY 1999 ($ in Thousands):
| (U) $0 | No activity |
| (U) $0 | Total |
(U) B. Program Change Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total
Cost | |
| (U) Previous President's Budget | 0 | 607 | 0 | 0 | 5,100 |
| (U) Appropriated Value | 0 | 607 | 0 | 0 | 5,100 |
| (U) Adjustments to Appropriated Value | |||||
| a. Cong Reductions | 0 | 0 | 0 | 0 | 0 |
| b. SBIR | 0 | 0 | 0 | 0 | 0 |
| c. Omnibus or Other Above Threshold Reprogram | 0 | 0 | 0 | 0 | 0 |
| d. Below Threshold Reprogramming | 0 | 0 | 0 | 0 | -4,500 |
| (U) Adjustments to Budget Years Since FY 1997 PB | 4,371 | -13 | 0 | 0 | 4,365 |
| (U) Current Budget Submit/President's Budget | 4,371 | 594 | 0 | 0 | 4,965 |
(U) Change Summary Explanation:
Funding: FY 96 Congressional Appropriations added $4.5M for AGM-130 integration. Since Air Combat Command did not have a requirement to integrate the
AGM-130 on the B-52 Congress authorized the Air Force to transfer these funds into the B-61 Mod 11 program. Original funding request was for FY97
expenditures. The Air Fore is expending all moneys in FY 97 to complete the program.
Schedule: None
Technical: None
(U) C. Other Program Funding Summary ($ in Thousands)
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
FY 2000 |
FY 2001 |
FY 2002 |
FY 2003 |
To
Compl |
Total
Cost | |
| (U) not applicable |
(U) D. Schedule Profile
| FY 1996 | FY 1997 | FY 1998 | FY 1999 |
| 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | 1 | 2 | 3 | 4 | |
| (U) Major Assembly Release test | X | |||||||||||||||
| (U) Aeroballistic/Dispersion tests | X | X | X | |||||||||||||
| (U) DOE modification program | X | X | X |
(U) A. Project Cost Breakdown ($ in Thousands)
| FY 1996 | FY 1997 | FY 1998 | FY 1999 | |
| (U) Software development | 1,413 | 594 | 0 | 0 |
| (U) Developmental test and evaluation | 2,202 | 0 | 0 | 0 |
| (U) Program management support | 236 | 0 | 0 | 0 |
| (U) Contractor support | 470 | 0 | 0 | 0 |
| (U) Travel | 50 | 0 | 0 | 0 |
| (U) Total | 4,371 | 594 | 0 | 0 |
(U) B. Budget Acquisition History and Planning Information ($ in Thousands)
Performing Organizations:
| Contractor or Government Performing Activity | Contract Method/Type or Funding Vehicle |
Award or Obligation Date |
Performing Activity EAC |
Project Office EAC |
Total Prior to FY 1996 |
Budget FY 1996 |
Budget FY 1997 |
Budget FY 1998 |
Budget FY 1999 |
Budget to Complete |
Total Program |
| Product Development Organizations |
| San Antonio ALC/Nuc Wpns Integration Division | MIPR | Jan 97 | 4,965 | 0 | 4,371 | 594 | 0 | 0 | n/a | 4,965 |
|
Support and Management Organizations |
|
Test and Evaluation Organizations |
(U) B. Budget Acquisition History and Planning Information Continued ($ in Thousands)
Government Furnished Property: None