| BDE AASLT TO SEIZE BRIDGE |
| UNIT | EQUIP | PAX | UH60L | CH47D | | UNIT | EQUIP | PAX | UH60L | CH47D |
| BDE TAC | 4H | 16 | | 2 | | Arty Btry (155) |
| MUX/FES | 3HH/3T | 12 | | 3 | | TAC | 2H | 8 | 2 |
| AVN LNOs | 2H | 8 | 2 | | | Guns | 8 guns | 56 | | 8 |
| SECURITY PLT | | 30 | 2 | | | HQ/FDC | 2H | 8 | 2 |
| | | | | | ammo | 54C | | | 18 |
| INF BN | | | | | | 2 x COLT | 2H | 8 | 2 |
| TAC/Log | 4H | 16 | 4 | | | 2 x Q36 | 4HH/4T | 16 | | 4 |
| 3 Rifle Cos | | 360 | 24 |
| 5 AT Plts | 22H | 68 | 2 | 10 | | Arty Btry (155) x 2 |
| 81mm mort plt | 6H | 26 | 8 | | | Guns | 16 guns | 112 | | 16 |
| Sct Plt | | 25 | 3 | | | HQ/FDC | 4H | 16 | 4 |
| 5 STGR Tms | | 15 | w/inf | | | ammo | 108C | | | 36 |
| Sapper Plt | 2H | 30 | 3 |
| | | | | | DIVARTY TAC | 3H | 12 | 3 |
| INF BN |
| TAC/Log | 4H | 16 | 4 | | | ADA Btry |
| 3 Rifle Cos | | 360 | 24 | | | HQ | 1H | 6 | 1 |
| 5 AT Plts | 22H | 68 | 2 | 10 | | 5 STGR | | | above AVGRs |
| 81mm mort plt | 6H | 26 | 8 | | | 4 AVG | 4HH | 12 | | 4 |
| Sct Plt | | 25 | 3 | | | LSDIS | 2HH/2T | 8 | | 2 |
| 5 STGR Tms | | 15 | w/inf |
| Sapper Plt | 2H | 30 | 3 | | | EN Co |
| | | | | | HQ | 2H/1T | 6 | 1 | 1 |
| INF BN | | | | | | 1 Sapper Plt | | 30 | 2 |
| TAC/Log | 4H | 16 | 4 | | | 4 x JD550 | 2Dozers | 4 | | 2 |
| 3 Rifle Cos | | 360 | 24 |
| 5 AT Plts | 22H | 68 | 2 | 10 | | MIST |
| 81mm mort plt | 6H | 26 | 8 | | | HQ | 1H | 4 | 1 |
| Sct Plt | | 25 | 3 | | | 2xGSR | | 6 | | above load |
| 5 STGR Tms | | 15 | w/inf | | | 2xLLVI | | 6 | | above load |
| Sapper Plt | 2H | 30 | 3 | | | TRQ32 | 1HH | 5 | | 1 |
| | | | | | DISE | 2HH/2T | 10 | | 2 |
| INF BN |
| TAC/Log | 4H | 16 | 4 | | | FLE (gnd spt) |
| 3 Rifle Cos | | 360 | 24 | | | HQ | 2H/2T | 24 | | 2 |
| 5 AT Plts | 22H | 68 | 2 | 10 | | CL III | 6drums | | 3 |
| 81mm mort plt | 6H | 26 | 8 | | | H2O | 6 drums | | 3 |
| Sct Plt | | 25 | 3 | | | Supplies | 6C | | 6 |
| 5 STGR Tms | | 15 | w/inf |
| Sapper Plt | 2H | 30 | 3 | | | ACP | 4H/2T | 30 | | 3 |
| | | | | | TOTAL (GROUND FORCE) | | 2613 | 210 | 144 |
| | Available Lift: |
| | 90 UH60L x .85OR = 78 - 8 logbirds = 70 x 3 lifts = 210 | | | | | | PAX | UH60L | CH47D |
| | 64 CH47D x .85OR = 54 - 6 logbirds = 48 x 3 lifts =144 | | | | TOTAL REQUIRED | | 2613 | 210 | 144 |
| | | | | | TOTAL AVAILABLE | | | 210 | 144 |