CONVERGED PRELIMINARY DESIGN SOLUTION
It Will Be Demonstrated That the Preliminary Design Meets:
- All “Core” Requirements Without Question
- Supportable Within the Existing Framework of the Marine Corps Maintenance Infrastructure
- Can Be Produced Utilizing Existing Industrial Base Capabilities Without Major Investment
- Maximizes Use of Open System Architecture to Ensure Technology Upgrade and Affordability Over the System’s Life Cycle