PPT Slide
- SITUATIONAL UNDERSTANDING: CSS COP WITH REQUIRED COMMS
- MAXIMIZE COMMONALITY OF VEHICLES AND SYSTEMS
- MAXIMIZE HOST NATION AND CONTRACTOR SUPPORT
- MULTIFUNCTIONAL CSS COMPANIES: HQ & DISTRO CO, BSC, FSMC
- DISTRIBUTION BASED SUSTAINMENT WITH INVENTORY IN PIPELINE
- MAXIMIZE INTER/INTRA-THEATER AIRLIFT FOR RESUPPLY
- LIMITED INITIAL SUSTAINMENT E.G. 3 DOS
- PRE-POSITIONED STRATEGIC CONFIGURED LOADS
- CRITICAL: PRE-DEPLOYMENT EQUIPMENT READINESS
- PRE-CONFIGURED UBLs LOADED FOR DEPLOYMENT
Brigade Sustainment Concept