
PREFACE
This manual is intended to provide the potential customers with a handy reference in the design of their payloads to assess the compatibility between the payloads and Long March 2C (LM-2C) launch vehicle. The basic design parameters, detailed technical specifications and interface requirements of the launch vehicle are described.
Any special requirements from the customers, which are not written inside this Manual, can also be met through the technical coordination for the programs.
Issue 1999 supersedes any information given in the previous issues or occasions.
CONTENTS
|
1.1 Long March Family and Its History |
1.2.2 Taiyuan Satellite Launch Center |
|
1.2 Launch Sites for Various Missions |
1.2.3 Jiuquan Satellite Launch Center |
|
1.2.1 Xichang Satellite Launch Center |
1.3 Launch Record of Long March |
CHAPTER
2 GENERAL DESCRIPTION TO LM-2C
|
2.1 Summary |
2.4 CTS Introduction |
|
2.2 Technical Description |
2.4.1 Spacecraft Adapter |
|
2.3 LM-2C System Composition |
2.4.2 Spacecraft Separation System |
|
2.3.1 Rocket Structure |
2.4.3 Orbital Maneuver System |
|
2.3.2 Propulsion System |
2.6 Missions to be Performed by LM-2C |
|
2.3.3 Control System |
2.7 Coordinate Systems and Attitude |
|
2.3.4 Telemetry System |
2.8 Spacecraft Launched by LM-2C |
|
2.3.5 Tracking and Safety System |
2.9 Upgrading to LM-2C |
|
2.3.6 Separation System |
|
|
3.1 LM-2C Mission Description |
3.3 Injection Accuracy |
|
3.1.1 Flight Sequence |
3.3.1 Two-stage LM-2C Injection Accuracy |
|
3.1.2 LM-2C/CTS Characteristic Parameters |
3.3.2 LM-2C/CTS Injection Accuracy |
|
3.2 Launch Capacities |
3.4 Separation Accuracy |
|
3.2.1 Basic Information on Launch Sites |
3.4.1 Two-stage LM-2C Separation Accuracy |
|
3.2.2 Two-stage LM-2C Mission Performance |
3.4.2 LM-2C/CTS Separation Accuracy |
|
3.2.3 LM-2C/CTS Mission Performance |
3.5 Launch Windows |
|
4.1 Fairing Introduction |
4.3 Heat-proof Function of the Fairing |
|
4.1.1 Summary |
4.4 Fairing Jettisoning Mechanism |
|
4.1.2 Fairing Static Envelope |
4.4.1 Lateral Unlocking Mechanism |
|
4.2 Fairing Structure |
4.4.2 Longitudinal Unlocking Mechanism |
|
4.2.1 Dome |
4.4.3 Fairing Separation Mechanism |
|
4.2.2 Forward Cone Section |
4.5 RF Windows and Access Doors |
|
4.2.3 Cylindrical Section |
|
CHAPTER
5 MECHANICAL/ELECTRICAL INTERFACE
|
5.1 Description |
5.3 Electrical Interface |
|
5.2 Mechanical Interface |
5.3.1 In-Flight-Disconnectors (IFDs) |
|
5.2.1 Composition |
5.3.2 Umbilical System |
|
5.2.2 Explosive Bolt Interface |
5.3.3 Anti-lightning, Shielding and Grounding |
|
5.2.3 Clampband Interface |
5.3.4 Continuity of SC “Earth-Potential” |
|
5.2.4 Anti-collision Measures |
5.3.5 Miscellaneous |
CHAPTER
6 ENVIRONMENTAL CONDITIONS
|
6.1 Summary |
6.3.3 Static Acceleration |
|
6.2 Pre-launch Environments |
6.3.4 Dynamic Environment |
|
6.2.1 Natural Environment |
6.4 Load Conditions for Payload Design |
|
6.2.2 Payload Processing Environment |
6.4.1 Frequency requirement |
|
6.2.3 Electromagnetic Environment |
6.4.2 Loads for Payload Structure Design |
|
6.2.4 Contamination Control |
6.4.3 Coupled Load Analysis |
|
6.3 Flight Environment |
6.5 SC Qualification and Acceptance Test Specifications |
|
6.3.1 Pressure Environment |
6.5.1 Static Test (Qualification) |
|
6.3.2 Thermal Environment |
6.5.2 Dynamic Environment Test |
|
Part A: North Launch Site |
B7.1.2 LV Vertical Processing (BLS) |
|
A7.1 North Technical Center |
B7.1.3 SC Non-hazardous Operation Building (BS2) |
|
A7.1.1 LV&SC Processing (BLS) |
B7.1.4 SC Hazardous Operation Building (BS3) |
|
A7.1.2 SRM Checkout and Processing Building (BM) |
B7.1.5 SRM Checkout and Processing Building (BM) |
|
A7.2 North Launch Center |
B7.1.6 Launch Control Console (LCC) |
|
A7.2.1 General |
B7.1.7 Pyrotechnics Storage & Testing Rooms (BP1 & BP2) |
|
A7.2.2 Moveable Service Tower |
B7.1.8 Power Supply, Grounding, Lightning Protection, Fire Alarm & Protection Systems in the South Center |
|
A7.2.3 Umbilical Tower |
B7.2 South Launch Center |
|
A7.2.4 Launch Control Center (LCC) |
B7.2.1 General |
|
A7.2.5 Mission Command & Control Center (MCCC) |
B7.2.2 Umbilical Tower |
|
A7.3 Tracking Telemetry and Control System (T,T&C) |
B7.2.3 Moveable Launch Pad |
|
Part B: South Launch Site |
B7.2.4 Underground Equipment Room |
|
B7.1 South Technical Center |
B7.2.5 Mission Command & Control Center (MCCC) |
|
B7.1.1 LV Horizontal Transit Building (BL1) |
B7.3 Tracking, Telemetry and Control System (TT&C) |
CHAPTER
8 LAUNCH SITE OPERATION
|
8.1 LV Checkouts and Processing |
8.4 Launch Limitation |
|
8.2 Combined Operation Procedures |
8.4.1 Weather Limitation |
|
8.2.1 SC/LV Integration and Fairing Encapsulation in North Center |
8.4.2 "GO" Criteria for Launch |
|
8.2.2 SC Transfer and Fairing/Stage-2 Integration |
8.5 Pre-launch Countdown Procedure |
|
8.3 SC Preparation and Checkouts |
8.6 Post-launch Activities |
|
9.1 Safety Responsibilities and Requirements |
9.4 Safety Criteria |
|
9.2 Safety Control Plan and Procedure |
9.4.1 Approval procedure of safety criteria |
|
9.2.1 Safety Control Plan |
9.4.2 Common Criteria |
|
9.2.2 Safety Control Procedure |
9.4.3 Special Criteria |
|
9.3 Composition of Safety Control System |
9.5 Emergency Measures |
CHAPTER
10 DOCUMENTS AND MEETINGS
|
10.1 General |
|
10.2 Documents and Submission Schedule |
|
10.3 Reviews and Meetings |