FY98 Program Element Descriptive Summaries / RDDS

0604778A Positioning Systems Development (SPACE)

COST (In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
D168 NAVSTAR Global Positioning System (GPS) Equipment 436 428 419 409 458 453 0 0 0 2603


A. Mission Description and Budget Item Justification: Project D168 provides for Army participation in the research and development phases of Army weapon systems requiring positioning/navigational capabilities. It provides for the engineering development of several alternatives for integration of GPS receivers into selected systems. These alternatives include, but are not limited to, Embedded/Integrated GPS, Advanced GPS Receivers (AGR), Tactical GPS Anti-Jam Technology (TGAT) and Differential GPS. The project in this program element supports research efforts in the engineering and manufacturing development phases of the acquisition strategy and are therefore correctly placed in Budget Activity 5.

Acquisition Strategy: Perform studies and analyses of host vehicles to support development of alternative GPS applications.

FY 1996 Accomplishments:
163 Procured and tested items in the marketplace to remain current with NDI alternatives (to include embedding)
161 Advanced GPS receiver framework conceptualization (non-hardware work)to meet evolving user requirements.
112 Air receiver exploration for MAGR follow-on replacement
Total 436


FY 1997 Planned Program:
111 Improve accuracy and time to fix studies for follow-on equipment requirements
150 Test program for NDI aviation GPS receiver (MAGR follow-on/replacement)
156 Improve survivability of GPS capability (renewed anti-jam/anti-spoof and other threats response)
11 Small Business Innovation Research/Small Business Technology Transfer(SBIR/STTR)
Total 428


FY 1998 Planned Program:
120 Continue improving accuracy and time to fix studies
134 Continue survivability studies
165 Explore emerging capabilities based on follow-on satellite configuration options
Total 419


FY 1999 Planned Program:
200 Continue exploration of emerging capabilities
109 Support miniaturization studies
100 Conduct studies on interfacing GPS with other systems
Total 409


B. Project Change Summary FY 1996 FY 1997 FY 1998 FY 1999
FY 1997 President's Budget 448 437 436 424
Appropriated Value 452 428
Adjustments to Appropriated Value -16
FY 1998 Pres Bud Request 436 428 419 409


C. Other Program Funding Summary

FY 1996


FY 1997


FY 1998


FY 1999


FY 2000


FY 2001


FY2002


FY2003
To

Compl

Total

Cost

K47800, Other Procurement, Army, NAVSTAR GPS 49040 26255 6796 7018 6895 33332 33967 51991 40000 255295


D. Schedule Profile: Not applicable

A. Project Cost Breakdown FY 1996 FY 1997 FY 1998 FY 1999
Developmental Test and Evaluation 0 150 134 109
Government Engineering Support 273 156 165 200
Contractor Engineering Support 163 111 120 100
SBIR/STTR 11
Total 436 428 419 409


B. Budget Acquisition History and Planning Information: Not applicable