FY98 USAF Military Space RDDS

0604480F Global Positioning System Block IIF (Space)

COST ($ In Thousands) FY 1996 Actual FY 1997 Estimate FY 1998 Estimate FY 1999 Estimate FY 2000 Estimate FY 2001 Estimate FY 2002 Estimate FY 2003 Estimate Cost to Complete Total Cost
0005 NAVSTAR GPS BLOCK IIF 18,530 35,406 71,094 67,853 27,558 24,163 17,745 14,782 405 277,536
Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 0


(U) A. Mission Description and Budget Item Justification

This program element funds Research and Development for the NAVSTAR Global Positioning System (GPS) space and control systems of the Block IIF Sustainment Program. This includes satellite design and development; control system, training simulator, and mission operation support center development and test; satellite upgrade design and development; control system, simulator and support center software upgrades; and R&D efforts to support deployment of GPS Block IIF. This PE is classified as Budget Activity 5, Engineering and Manufacturing Development (EMD),because it supports EMD of the GPS Block IIF satellite. Production funding for the Block IIF satellite is carried in PE 0305165.

(U) FY 1996 ($ in Thousands)
(U) $15,723 Award Contract for Block IIF - System Sustainment Satellite System Development
(U) $1,728 Award Contract for Block IIF - System Sustainment Ground System/Simulator Development
(U) $1,079 Studies
(U) $18,530 Total


(U) FY 1997 ($ in Thousands)
(U) $29,342 Continue Block IIF - System Sustainment Satellite System Development
(U) $4,095 Continue Block IIF - System Sustainment Ground System/Simulator Development
(U) $603 Initiate Block IIF - L-5 Navigation Signal Development
(U) $1,249 Studies
(U) $117 Mission Support
(U) $35,406 Total


(U) FY 1998 ($ in Thousands)
(U) $56,826 Continue Block IIF - System Sustainment Satellite System Development
(U) $7,559 Continue Block IIF - System Sustainment Ground System/Simulator Development
(U) $118 Mission Support
(U) $481 Continue Block IIF - L-5 Navigation Signal Development
(U) $6,110 Studies
(U) $71,094 Total


(U) FY 1999 ($ in Thousands)
(U) $27,613 Continue Block IIF - System Sustainment Satellite System Development
(U) $12,281 Continue Block IIF - System Sustainment Ground System/Simulator Development
(U) $127 Mission Support
(U) $18,832 Studies
(U) $9,000 IIF/IIR/IIA Compatibility Testing and Integration
(U) $67,853 Total


(U) B. Program Change Summary ($ in Thousands)


FY 1996


FY 1997


FY 1998


FY 1999
Total

Cost

(U) Previous President's Budget 18,656 37,142 74,944 65,262 Continuing
(U) Appropriated Value 19,699 37,142
(U) Adjustments to Appropriated Value
a. Cong Gen Reductions - 386 -778
b. SBIR - 416 -958
c. Omnibus or Other Above Threshold Reprogram
d. Below Threshold Reprogramming -6
e. Rescision - 361
(U) Adjustments to Budget Years Since FY97 PB -3,850 2,591
(U) Current Budget Submit/President's Budget 18,530 35,406 71,094 67,853 Continuing


(U) Change Summary Explanation:

Funding: Adjustments in FY98 (-3,850) and FY99 (2,591) realign funds to the years in which they are required.

Schedule: No Change

Technical: No Change

(U) C. Other Program Funding Summary ($ in Thousands)


FY 1996


FY 1997


FY 1998


FY 1999


FY 2000


FY 2001


FY 2002


FY 2003
To

Compl

Total

Cost

(U) Missile Procurement (GPS Block IIF)* 32,499 145,493 114,412 120,713 191,742 158,762 104,793 106,457
* Funding for GPS Block IIF resides in PE35165F
Related RDT&E:
(U) PE 0305164F, NAVSTAR GPS (User Equipment), provides receivers to use the positioning, navigation, and timing signals from satellites.
(U) PE 0101221N, Fleet Ballistic Missile System, range positioning.
(U) PE 0301357F and 0305913F (formerly 0102433F), Nuclear Detonation Detection System (NDS), fund NDS payloads on the GPS satellites.
(U) PE 0305119F Space Boosters, funds launch services (Delta II).
(U) PE 0305130F, Consolidated Space Operations Center (CSOC), funds CSOC which hosts the operational GPS Master Control Station.
(U) PE 0305165F, NAVSTAR GPS Space/Control, funds for Block IIR, CSEL, JPO support, and current ground system.


(U) D. Schedule Profile

FY 1996 FY 1997 FY 1998 FY 1999
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
(U) Award Block IIF System Sustainment Contract x
(U) System Design Review x
(U) Preliminary Design Review x


(U) A. Project Cost Breakdown ($ in Thousands)
FY 1996 FY 1997 FY 1998 FY 1999
(U) Block IIF Development 18,530 35,406 71,094 67,853
(U) Total 18,530 35,406 71,094 67,853


(U) B. Budget Acquisition History and Planning Information ($ in Thousands)

Performing Organizations:

Contractor or Government Performing Activity Contract Method/Type or Funding Vehicle

Award or Obligation Date


Performing Activity EAC


Project Office

EAC



Total

Prior to

FY 1996





Budget

FY 1996





Budget

FY 1997





Budget

FY 1998





Budget

FY 1999





Budget to Complete




Total Program
Product Development Organizations
Reserved Funds for BTR

N/A


N/A


N/A


N/A


N/A


8


N/A


N/A


N/A


N/A


N/A
Block IIF Development Rockwell Int

Downey, CA

CPAF 3rd Qtr 96 N/A N/A N/A 18,522 35,406 71,094 67,853 84,653 277,536


Subtotal Product Development 18,530 35,406 71,094 67,853 84,647 277,536
Subtotal Support and Management
Subtotal Test and Evaluation
Total Project 18,530 35,406 71,094 67,853 84,647 277,536