FY98 USAF Military Space RDDS
0605712F Initial Operational Test & Eval
(U) A. Mission Description and Budget Item Justification: This program funds IOT&E tests conducted to evaluate a system's operational effectiveness and suitability and
to identify any operational deficiencies or need for modifications in support of the acquisition process. IOT&E is an evaluation of a system's performance when the complete
system is tested and evaluated against operational criteria by personnel with the same qualifications as those who will operate, maintain and support the system when
deployed. In general, IOT&E is performed on new systems in development, major modifications and other systems as directed. This PE funds Congressionally mandated
IOT&E to support major weapon system acquisition decisions (Milestone III). For major systems designated for use in combat, the law requires IOT&E be completed under
realistic field conditions before proceeding beyond low rate initial production. As an essential element of IOT&E, this PE will fund major Operational Utility Evaluations
(OUE), Early Operational Assessments (EOA) and Operational Assessments (OA) which support major milestones and decision points prior to Milestone III. IOT&E
programs are identified in five categories: aircraft/support; space; missile/munitions; computer, communication, command and control and information (C4I); and general.
This PE funds the costs of the test (e.g., data reduction, range costs, etc.), not the development of test resources or the maintenance of test infrastructure.
(U) FY 1996 ($ in Thousands):
| (U)
$22,948 |
(U) FY 96 IOT&E Accomplishments: F-22; B-1B CMUP BLK E; B-2; CMU, MILSTAR, Theater Battle Management C2 Information
Processing System (TBM); E3 Radar System Improvement Program (E3 RSIP); AIM-9X (Air Intercept Missile) and etc.
|
|
(U) Category: Aircraft/Support Accomplishments:
- F-22: Completed and obtained approval of F-22 comparison test concept. Developed draft operational assessment (OA) plan.
- B-1B CMUP BLK E: Conducted pretest planning.
- B-2: Continued combined developmental and operational flight test missions in support of B-2 test and evaluation for report due in Dec 97. |
|
(U) Category: Space:
- CMU: Missile warning IOT&E completed
- MILSTAR: Completed 80 percent MILSTAR low data rate testing. |
|
(U) Category: Missile/Munitions
- AIM-9X: Digital missile model development - to evaluate kinematic performance and capabilities of missiles, and modeling
/simulation to support AIM-9X lethality assessment.
|
|
(U) Category: Computer, Communication, Command and Control and Information System (C4 I).
- TBM: Advance planning stage; accomplished test readiness review.
- E3 RSIP: Program complete. Finished IOT&E and coordinating briefing trail/milestone III for RSIP. |
|
|
| (U) $22,948 |
Total |
(U) FY 1997 ($ in Thousands):
| (U) $21,454 |
(U) FY 97 IOT&E Planning Program: Conduct IOT&E on the F-22; Joint Strike Fighter (JSF); F- 15C/E TEWS; B-1 CMUP BLK D; B-1
CMUP BLK E; B-1B CMUP BLK F; CV-22; and etc. |
|
|
|
(U) Category: Aircraft/Support. Conduct IOT&E on the F-22; Joint Strike Fighter (JSF); F- 15C/E TEWS; B-1 CMUP BLK D; B-1
CMUP BLK E; B-1B CMUP BLK F; CV-22; and other systems.
- F-22: Develop and gain approval for the Operational Assessment Plan to support Low Rate Initial Production (LRIP). Conduct F-22 FMS
Review. Develop modeling/simulation plan, F-15C Comparison Test Plan, Roll-up Methodology Model, and Integrated Data Processing Plan.
- JSF: Develop and implement initial AFOTEC Test Concept. Initiate the development of Critical Operational Issues (COIs), Measures of
Effectiveness (MOEs), and Measures of Performance (MOPs) with USN, USMC, and ACC.
- F-15 TEWS: The system provides self protection for F-15 aircraft. TEWS consists of four federated subsystems; the ALR-56 Radar
Warning Receiver (RWR), The ALQ-135 Internal Countermeasures Set (ICS-a jammer), the ALQ-128 Electronic Warfare Warning Set
(EWWS), and the ALE-45 Countermeasures Dispenser (CMD). The ALR-56C provides threat warning for F-15C/E aircraft. The Band 3
provides countermeasures for F-15C/E aircraft. Neither the ALR-56C, Band 3, or Bank 1.5 have ever undergone an IOT&E. All of the ALR-56Cs and Band 3s have been produced.
- B-1 CMUP Block D: Conduct Operational Assessment.
- B-1 CMUP Blocks E/F: Conduct advance planning.
- CV-22: Conduct Operational Assessment. |
|
(U) Category: Space. Conduct IOT&E on CMU-CMU; ICBM Minuteman III GRP; MILSTAR; Evolved Expendable Launch Vehicle
(EELV); Space Based Infrared System (High); Space Based Infrared System-LOW ( SBIRS-LEO) and etc.
- CMU: Conduct Granite Shield and Air Mission Testing.
- ICBM GRP: Conduct Operational Assessment and modeling/simulation.
- MILSTAR: Complete Low Data Rate IOT&E and pre-test planning for MILSTAR II IOT&E
- EELV: Conduct Operational Assessment, IOT&E Pre-test planning and Modeling/Simulation.
- SBIRS (High): Conduct pre-test planning, modeling/simulation, validation verification & accreditation (VV&A) effectiveness model,
ground and space segment survivability analysis, and manning, workload and performance assessment.
- SBIRS (Low): Conduct OT&E program readiness assessment, monitoring design and test activities, infrared sensor stimulation/risk
reduction analysis (IRSS), hardware/software integration for flight test demo, hardbody radiation analysis, and pre-test planning. |
|
|
|
(U) Category: Missile/Munitions. - Conduct IOT&E on Joint Direct Attack Munitions (JDAM); Joint Standoff Weapon (JSOW); AIM-9X Air-to-Air (AIM-9X); and Joint Air-to Surface Stand-OFF Missile (JASSM), and etc.
- JDAM: Conduct test planning, operational assessment and IOT&E contractor support, target build-up, and range support.
- JSOW: Conduct test planning, test execution, contractor support, and range support.
- AIM-9X: Conduct Modeling/Simulation.
- JASSM: Oct 96 - Mar 97. Complete Evaluation Concept and start OT&E Test Plan including: test design matrix, refine test scenarios,
complete development of JASSM survivability, damage, and reliability methodology. Outline Preliminary Data Management Analysis
Plan (DMAP). |
|
|
|
(U) Category: Computer, Communication, Command and Control and Information System (C4 I). Conduct IOT&E on JTIDS Class 2 Terminal
Multiservice (JTIDS CL2) and etc.
- JTIDS Class 2 Terminal: Conduct Multi-service IOT&E and range support. |
|
(U) Category: General. Conduct IOT&E on Wind Corrected Munitions Dispenser (WCMD) and Chemical Hardened Air Transportable
Hospital (CHATH).
- WCMD: System is a new tail kit designed to correct for launch transients, ballistic error from lofts, medium-and high altitude deliveries,
and unknown winds between release point and function altitude for CBU (CEM/Gator/SFW) munitions. The combined DT/IOT&E will
support an initial LRIP decision in Nov 97, a B-52 required assets available (RAA) data in Feb 97 and Milestone III in FY99.
- CHATH: Program is a modification to the currently-fielded Air Transportable Hospital (ATH). The additional configuration includes
currently-fielded M-28 chemical liners and airlocks, and the developed chemically hardened air management plan (CHAMP), a four-to-one replacement for the ECU. The CHAMP provides the over-pressurization and filtered air needed to chemically harden the ATH.
DT&E completed in Dec 96, system certification in Feb. 97, IOT&E testing 3 Mar - 7 Apr 97, and Milestone III decision in May 97. |
|
|
| (U) $21,454 |
Total |
(U) FY 1998 ($ in Thousands):
| (U) $28,319 |
(U) FY 98 IOT&E Planning Program: Conduct IOT&E on the F-22; Joint Strike Fighter (JSF); F-15 TEWS; B-1 CMUP BLK D; B-1B
CMUP BLK E; B-1B CMUP BLK F; CV-22; and etc. |
|
|
|
(U) Category: Aircraft/Support. Conduct IOT&E on the F-22; Joint Strike Fighter (JSF); F-15 TEWS; B-1 CMUP BLK D; B-1 CMUP
BLK E; B-1B CMUP BLK F; CV-22; and etc.
- F-22: Implement Operational Assessment plan and reporting results to LRIP. Finalize Roll-up Methodology Model and F-15C Comparison
Test Plan and coordinate required range and aircraft requirements.
- JSF: Develop, coordinate with USN/USMC, and gain approval of Early Operational Assessment Plan. Prepare resource requirement plan
and initiate resource acquisition.
- F-15 TEWS: Conduct suitability assessment, and type 1 training
- B-1B CMUP Block D: Conduct IOT&E testing.
- B-1B CMUP Block E: Conduct advance planning, contractor support modeling simulation
- B-1B CMUP Block F: Conduct advance planning, contractor support, fuze model development, Joint Modeling and Simulation System
(JMASS), and end game interface work.
- CV-22: Conduct operational test. |
|
|
|
(U) Category: Space. Conduct IOT&E on CMU-CMU; ICBM-Minuteman III Guidance Program (ICBM-MMIII GRP); MILSTAR; Evolved
Expendable Launch Vehicle (EELV); Space Based Infrared System-High; Space Based Infrared System-LOW ( SBIRS-LEO); and etc.
- CMU: Finish air mission testing, and Cheyenne Mountain testing.
- ICBM GRP: Modeling/Simulation, range support, and guidance replacement testing.
- MILSTAR: Participate in combined DT/OT.
- EELV: Conduct Operational Assessment, IOT&E pre-test planning, modeling/simulation
- SBIRS (HIGH): Modeling/simulation, Validation Verification and Accreditation (VV&A) Effectiveness models, ground and space segment
survivability analysis, operational assessment of ground consolidation, hardware/software integration, and planning for FY99 IOT&E.
- SBIRS (LOW): OT&E Program Readiness Assessment, Modeling and Simulation, Test and Evaluation Planning; and pre-test planning. |
|
|
|
(U) Category: Missile/Munitions. Conduct IOT&E on Joint Direct Attack Munitions (JDAM); Joint Standoff Weapon (JSOW); AIM-9X Air-to-Air (AIM-9X); and Joint Air-to Surface Stand-OFF Missile (JASSM), and etc.
- JDAM: Conduct IOT&E testing, contractor support, and range support
- JSOW: IOT&E testing, phase II test planning and contract support
- AIM-9X: Data Reduction, DMAP production and modeling/simulation
- JASSM: Oct 97 - Jan 98 - Complete OT&E Test Plan; develop and provide program introduction document to test ranges; complete and
brief Milestone II operational assessment; finalize CDT/OT plan with JPO and contractors, range costs including simulator initial checkout
and possible simulator deployments. |
|
|
|
(U) Category: Computer, Communication, Command and Control and Information System (C4I). Conduct IOT&E on Region/Sector Air
Operations Center (R/SAOC); Joint Precision Approach and Landing System (JPALS) and etc.
- R/SAOC (formerly R/SOCC): Concept development and test plan developments.
- JPALS: Conducting Operational Test, contractor support, data analysis, data reduction, and range support. |
|
|
|
(U) Category: General. Conduct IOT&E on Wind Corrected Munitions Dispenser (WCMD); etc.
- WCMD: IOT&E test continues at Eglin AFB FL., and Utah Test and Training Range. Dedicated IOT&E will employ inert munitions to
evaluate multiple-wean deliveries and to measure CEP to an 80% confidence level. |
| |
|
| (U) $28,319 |
Total |
(U) FY 1999 ($ in Thousands):
| (U) $25,035 |
(U) FY99 IOT&E Planning Program: Conduct IOT&E on the F-22, Joint Strike Fighter (JSF); F-15 TEWS; B-1B CMUP BLK E; B-1B
CMUP BLK F; an etc. |
|
|
|
(U) Category: Aircraft/Support. Conduct IOT&E on the F-22; Joint Strike Fighter (JSF); F-15C/E TEWS; B-1 CMUP BLK E; B-1B
CMUP BLK F; CV-22; and etc.
- F-22 : Conduct F-15C Comparison Test open-air Testing; Conduct Operational Assessment to Support Certification Ready for IOT&E.
- JSF: Conduct Early Operation Assessment.
- F-15 TEWS: Conduct IOT&E testing.
- B-1B CMUP Block E: Advance planning, contractor support, and modeling/simulation.
- B-1B CMUP Block F: Advance Planning, contractor support, and fuze model development.
- CV-22: Contractor support for operational evaluation (OPEVAL) |
|
|
|
(U) Category: Space. Conduct IOT&E on CMU-CMU; MILSTAR; Evolved Expendable Launch Vehicle (EELV); and etc.
- CMU: Complete Cheyenne Mountain Testing.
- MILSTAR: Participate in combined DT/OT.
- EELV: Conduct Operational Assessment #2. |
|
|
|
(U) Category: Missile/Munitions. Conduct IOT&E for Joint Standoff Weapon (JSOW); AIM-9X Air-to-Air (AIM-9X); and Joint Air-to
Surface Stand-OFF Missile (JASSM), etc.
- JSOW: Conduct IOT&E testing, phase II testing planning, and contractor support.
- AIM-9X: Conduct data reduction, DMAP Production, and modeling/simulation.
- JASSM: Participate and accomplish CDT/OT; prepare for IOT&E (planned start Feb ). Provide manpower and equipment, and range cost
including possible simulator deployment and early CDT/OT testing. |
|
|
|
(U) Category: Computer, Communication, Command and Control and Information System (C4I). Conduct IOT&E on Region/Sector Air
Operation Center (R/SACC), etc.
- R/SAOC (formerly R/SOCC): Conduct OT&E testing |
|
|
|
(U) Category: General. Conduct IOT&E Casualty Care Systems; Base Intrusion Security Systems (BISS); Chemical Warfare Defense,
Next Generation Generators and External Control Unit; etc.
- CCS: Test all newly developed flyaway transportable medical care systems.
- BISS: Conduct on-going tests of various commercial off-the-shelf and other personnel and asset protection techniques.
- CWD: AF focus of chemical protection programs.
- Next Generation Generator and External Control Units: Support the Airbase Operability Concept. |
|
|
| (U) $25,035 |
Total |
(U) B. Program Change Summary ($ in Thousands):
|
FY 1996 |
FY 1997 |
FY 1998 |
FY 1999 |
Total Cost |
| (U) Previous President's Budget |
23,806 |
26,921 |
34,601 |
31,320 |
Cont |
| (U) Appropriated Value |
|
21,921 |
|
|
|
| (U) Adjustments to Appropriated Value |
|
-467 |
|
|
|
| a. Congressional Adjustments |
|
-467 |
|
|
|
| (U) Adjustments to Budget Years Since FY 1997 PB |
|
|
-6,282 |
-6,285 |
|
| (U) Current Budget Submit/President's Budget |
22,948 |
21,454 |
28,319 |
25,035 |
Cont |
(U) Change Summary Explanation:
Funding: FY97 congressional reduction of $5 million. FY98 and FY99 budget changes reflect content and requirements adjustments.
Schedule: None.
Technical: None.
(U) C. Other Program Funding Summary ($ in Thousands): Not applicable.
(U) D. Schedule Profile: Not applicable
THIS PAGE INTENTIONALLY LEFT BLANK