ADVANCED CONCEPT TECHNOLOGY DEMONSTRATIONS
PRECISION FORCE




REAL-TIME RETARGETING (RTR) PROGRAM

    OBJECTIVES:
  • PROVIDE S&T BASE TO SUPPORT RAPID STRIKE (RE)PLANNING AND EXECUTION FOR CRUISE MISSILE AND TACAIR IN A HIGHLY DYNAMIC TARGET ENVIRONMENT.
NOT AVAILABLE
SCHEDULE AND FUNDING:
MILESTONE FY95 FY96 FY97
6.1 RESEARCH 0 3848 4060
6.2 DEVELOPMENT 5133 7275 7410
6.3 DEMONSTRATION 0 4088 4316
    CAPABILITY GAPS:
  • MISSION PLANNING SYSTEMS NOT FAST ENOUGH TO ADDRESS TIME CRITICAL TARGETS.
  • C3 BETWEEN MISSION PLANNING SYSTEMS, SURVEILLANCE ASSETS, TACAIR, AND CRUISE MISSILES IS INADEQUATE OR DOES NOT EXIST.
  • CAPABILITY DOES NOT EXIST TO UPDATE ATR AND AIM POINT SELECTION AFTER LAUNCH IN RESPONSE TO DYNAMIC TARGETS.
  • REAL-TIME SUPPORT LACKING FOR ALL-SOURCE TACTICAL INFORMATION PRESENTATION, IN-FLIGHT MISSION REHEARSAL, AND RESOURCE OPTIMIZATION.



REAL-TIME RETARGETING (RTR) PROGRAM EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













TO BE PROVIDED
















PRECISION STRIKE NAVIGATOR (PSN) ATD*

    OBJECTIVES:
  • DEMONSTRATE HIGH ACCURACY FOG IMU ON A HYBRID CHIP USING AWB PIONEERED TECHNOLOGY.
    RISK:
  • ELECTRO-OPTICAL HYBRID INTEGRATION IS A FIRST.
  • POLARIZING WAVEGUIDE
  • PHASE MODULATORS
  • LIFE-OFF PROCESSES
  • PHOTO-VOLTAICS
NOT AVAILABLE
SCHEDULE
    TECHNICAL APPROACH:
  • DEVELOP FABRICATION PROCESSES FOR THE HYBRID CHIP.
  • GFE CHIPS TO THE IMU CONTRACTOR.
  • INSTRUMENT THE IMU INTO A TEST POD.
  • COLLECT DATA AND CALCULATE CEP.
  • PREPARE DATA PACKAGE.
*ATD IN YEAR ONE ONLY



PRECISION STRIKE NAVIGATOR (PSN) EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













TO BE PROVIDED
















GPS/INERTIAL COMPETENT MUNITIONS ATD

    OBJECTIVES:
  • DEMONSTRATE GPS/MICROMECHANICL IMU GN&C WITH DESPUN CANARD ACTUATOR INTEGRATED IN THE NOSE OF A 5" SHELL.
  • SEVERE LAUNCH ENVIRONMENT
    • 9.5 MEGAJOULE GUN—30,000 G, 250 HZ ROLL
    • 18 MEGAJOULE GUN—NEAR 80,000 G
    OBJECTIVES:
NOT AVAILABLE
SCHEDULE AND FUNDING ($M):
PE Number FY96 FY97 FY98
63792N 6.0
63217N 6.0 3.0
    APPROACH:




NOT AVAILABLE






GPS/INERTIAL COMPETENT MUNITIONS EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE
















CRUISE MISSILE REAL TIME RETARGETING DEMONSTRATION

    OBJECTIVES:
  • ADVANCED TECHNOLOGY DEMONSTRATION OF BRASSBOARD REAL-TIME G&C SYSTEM TO LAUNCH ON COORDINATES, MAKE IN-FLIGHT DECISIONS, IDENTIFY TARGETS, AND SELECT AIMPOINTS ON FIXED AND RELOCATABLE TARGETS.
    JUSTIFICATION:
NOT AVAILABLE
SCHEDULE AND FUNDING ($M):
PE Number FY96 FY97 FY98 FY99 FY00
63217N 4.1 4.3 4.1 4.9 4.5
    TECHNICAL ISSUES:
  • INTEGRATE AIMPOINT SELECTION ALGORITHMS WITH LADAR SEEKER AND PREPARE FOR CAPTIVE-CARRY ON F/A-18 OR F-15.
  • DEVELOP REAL-TIME PROCESSOR USING OFF-THE-SHELF COMPONENTS TO PERFORM MISSION PLANNING, IMAGE PROCESSING, AND GUIDANCE DECISIONS.



CRUISE MISSILE REAL-TIME RETARGETING DEMONSTRATION EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE
















CRUISE MISSILE DEFENSE, PHASE I (MOUNTAIN TOP)

    OBJECTIVES:
  • DEMONSTRATE AIR-DIRECTED SURFACE-TO-AIR MISSILE (ADSAM) OVER-THE-HORIZON ENGAGEMENT
  • USING ELEVATED SENSORS AS A SURROGATE AIR PLATFORM, DETECT, TRACK, ENGAGE, AND KILL OVER-THE-HORIZON CRUISE MISSILE TARGETS.
USE MOUNTAIN TOP SENSORS (RSTER, MK 74 MFCS, CEC) AS SURROGATE AIRBORNE PLATFORM.
  • PROVIDE INSIGHTS INTO NEW AIR DEFENSE CONCEPTS OF OPERATIONS.
  • JOINT NAVY/ARMY DEMONSTRATION WITH JOINT STAFF AND ALL SERVICE MODELING AND SIMULATION SUPPORT.
    RESIDUALS:
  • NONE IN PHASE I
NOT AVAILABLE
SCHEDULE:
  • 06-26 JAN 96: ARMY "VIRTUAL ENGAGEMENTS" MISSIONS (SIMULATED FIRING ON TRACK DATA.).
  • 20-21 JAN 96: NAVY LIVE MISSILE FIRING TESTS.
  • 29 JAN--2 FEB 96: MOUNTAIN TOP ENHANCED JOINT EXERCISE (LITTORAL WARFARE AND DATA COLLECTION)
    FUNDING ($M):
PE Number FY95 FY96 FY97 FY98 FY99
63238N 26.7 46.9 46.3 31.6 12.3
NOTE: TOTALS OF PHASES I AND II
    TECHNOLOGY:
  • EXISTING SURVEILLANCE AND FIRE CONTROL SENSORS (RADAR SURVEILLANCE TECHNOLOGY EXPERIMENTAL RADAR(RSTER) WITH ADS-18S ANTENNA, MK 74 MISSILE FIRE CONTROL SYSTEM, AGEIS PATRIOT RADAR).
  • COOPERATIVE ENGAGEMENT CAPABILITY (CEC).
  • MODIFIED STANDARD MISSILE (SM-2, BLK III).
  • CAPTIVE CARRY PATRIOT PAC-3 MISSILE SEEKER.
    PLAYERS:
  • USERS: CINCPAC; SERVICE DOCTRINE COMMANDS; U.S. ARMY AIR DEFENSE ARTILLERY SCHOOL
  • S&T MANAGERS:
    • NAVY: ONR, PEO(TAD), PMS 400 (AEGIS)
    • ARMY: PEO(MD), PATRIOT
  • OTHERS: USAF, USMC, JOINT STAFF, BMDO, ARPA (PLANNING, SIMULATION, CONOPS, DATA COLLECTION)



CRUISE MISSILE DEFENSE, PHASE I (MOUNTAIN TOP) EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE
















HARD TARGET SMART FUZE (HTSF) ATD AIR FORCE

    OBJECTIVES/GOALS:
  • MATURE, DEMONSTRATE, AND REDUCE OVERALL RISK OF PRODUCIBLE, TACTICAL BASELINE SMART FUZE.
  • INTEGRATE HTSF WITH MMT.
  • DEMONSTRATE OPERATIONAL UTILITY OF HTSF.
    PAYOFF/MILITARY SIGNIFICANCE:
  • SUPPORTS C.P. OF WMD.
  • INCREASED SORTIE EFFECTIVENESS AND REDUCED COLLATERAL DAMAGE.
  • STREAMLINED ACQUISITION CYCLE.
NOT AVAILABLE
KEY MILESTONES:
  • ASSEMBLY LINE FACILITIZED 2Q96
  • OPERATIONAL UTILITY EVALUATION 2Q96
  • CPI PHASE I DEMO 2Q96
  • COMPLETE QUAL 3Q96
  • FAB/DELIVER 70/16 UNITS 3Q96
    FUNDING ($M):
PE Number FY95 FY96 TOTAL
606601F,
PROJ. 670B
3.3 1.9 5.2
    PAST ACCOMPLISHMENTS:
  • PRODUCIBLE TACTICAL DESIGN.
  • 16 SUCCESSFUL SLED TESTS
  • 7 SUCCESSFUL FLIGHT TESTS
  • CRITICAL ENVIRONMENTAL QUALITY TESTS
  • CONTRACT AWARD—JULY/SEP 95



HARD TARGET SMART FUZE (HTSF) ATD EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE
















ANTIMATERIEL WARHEAD FLIGHT TESTS (AWFT) ATD AIR FORCE

    OBJECTIVES/GOALS:
  • DEMO MULTI-MODE WARHEAD IN FLIGHT TEST
    • AEROSTABLE SLUG
    • STRETCHING ROD
    • FRAGMENTS
  • DEMO LADAR SENSOR.
    • DETECT, CLASSIFY, TRACK
  • DEMO SUBMUNITION MANEUVER PERFORMANCE
    PAYOFF/MILITARY SIGNIFICANCE:
  • LOW COST/KILL—5 TO 1 IMPROVEMENT.
  • INCREASED SORTIE EFFECTIVENESS AND REDUCED COLLATERAL DAMAGE.
  • EFFECTIVE MUNITION—SEAD, TMD, JSASM TARGETS, ETC.
NOT AVAILABLE
KEY MILESTONES/TRANSITION:
  • COMPLETE WARHEAD/SUBMUNITION
    INTEGRATION DESIGN 3Q97
  • FABRICATE HARDWARE 3Q98
  • GROUND TESTING 1Q99
  • FLIGHT TESTING 3Q99
  • TRANSITION 4Q99
--< SUPPRESSION OF ENEMY AIR DEFENSE (SEAD) WEAPON
    FUNDING ($M):
PE Number FY95 FY96 FY97 FY98 FY99 FY00 TOTAL
63601F, Proj. 670A 0.5 0.5 2.0 4.4 4.1 0.7 12.0
    ACCOMPLISHMENTS:
  • SENSOR PROVED IN TOWER AND FLIGHT TESTS 1QFY94
  • GUIDED FLIGHT TEST (NO WARHEAD) 4QFY94



ANTIMATERIEL WARHEAD FLIGHT TESTS (AWFT) ATD EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE
















ANTIJAM GPS TECHNOLOGY FLIGHT TEST (AGTFT) ATD AIR FORCE

    OBJECTIVES:
  • IDENTIFY AND FLIGHT TEST LOW COST ANTIJAM CAPABILITY FOR JDAM TYPE WEAPONS
    • LAB AND ANECHOIC CHAMBER TESTING OF EXISTING OR NEAR-TERM DEVELOPMENTAL ANTIJAM CAPABILITY
    • INTEGRATE AJ TECHNOLOGY INTO SUITABLE CARRIER VEHICLES
    • CONDUCT AJ GPS/INS FLIGHT TEST AT HOLLOMAN AFB, NM
    PAYOFF/MILITARY SIGNIFICANCE:
  • ANTIJAM CAPABILITY PERMITS GPS ACCURACY FROM WEAPON LAUNCH TO IMPACT
  • INCREASED ACCURACY AND EFFECTIVENESS REDUCES NUMBER OF AIRCRAFT SORTIES REQUIRED
NOT AVAILABLE
KEY MILESTONES/TRANSITION:
  • COMPLETE SUBSYSTEM TESTING 2Q96
  • COMPLETE INTEGRATION 2Q97
  • COMPLETE GROUND TESTING 4Q97
  • COMPLETE FLIGHT TESTING 2Q98
  • TRANSITION TO JDAM PIP 1Q99
FUNDING ($M):
PE Number FY95 FY96 FY97 FY98 FY99 TOTAL
6.3, 63601F, Proj. 670A 0.8 2.9 2.8 3.1 0.0 9.5
6.4, 63601F, Proj. 670A 0.9 1.7 2.0 0.04 0.0 4.7
    ACCOMPLISHMENTS:
  • SPATIAL/TEMPORAL DISCRIMINATION OF JAMMER 2Q93
  • THAGG HARDWARE FABRICATED 4Q94



ANTIJAM GPS TECHNOLOGY FLIGHT TEST (AGTFT) ATD EXIT CRITERIA

OPERATIONAL CAPABILITY
BASELINE
MINIMUM GOAL













NOT AVAILABLE