ADVANCED CONCEPT TECHNOLOGY DEMONSTRATIONS
JOINT THEATER MISSILE DEFENSE




CRUISE MISSILE DEFENSE (CMD) PHASE II ACTD (PROPOSED)

    OBJECTIVES:
  • FOLLOW-ON TO PHASE I WITH:
    • FIXED WING AND AEROSTAT SENSORS
    • RAPID DATA DISSEMINATION TO SHOOTERS
    • PATRIOT AND AEGIS ADSAM CAPABILITY
    • FIGHTERS/AMRAAM
    • IMPROVED, CENTRALIZED TARGET ID
    • REQUIRED WPN SYSTEM MODIFICATIONS
    • JOINT CONOPS
  • PREPARE FOR ACQUISITION DECISION ON:
    • AIRBORNE SENSORS
    • MODIFIED WEAPON SYSTEMS AND MISSILES
NOT AVAILABLE
    SCHEDULE:
  • FY96 START
  • DEMOs IN FY98-01
    STATUS:
  • EXISTING TECHNOLOGY DEMO PROGRAM (KNOWN AS 2+2) DIRECTED BY DEPSECDEF IN DEC 94
    FUNDING ($M): TO BE DETERMINED
    PLAYERS:
  • S&T: ARMY MICOM, PEO-MD, NAVY PEO-TAD, AF PEO, ESC, ARPA, BMDO
  • USERS: TBD
    TECHNOLOGY:
  • EXISTING ADVANCED SURVEILLANCE AND FIRE CONTROL SENSORS
  • MINOR MODS TO EXISTING WEAPONS SYSTEMS AND MISSILES
  • CEC/JTIDS FOR DATA DISSEMINATION



CRUISE MISSILE DEFENSE (CMD) PHASE II ACTD (PROPOSED) EXIT CRITERIA

OPERATIONAL CAPABILITY
CURRENT CAPABILITY
END GOALS











NOT AVAILABLE














AEROSTATS FOR CRUISE MISSILE DEFENSE ACTD (PROPOSED)

    OBJECTIVES:
  • DEMONSTRATE
    • AEROSTAT AIRWORTHINESS, AVAILABILITY, DEPLOYABILITY, MANEUVERABILITY
    • ADVANCED SURVEILLANCE AND FIRE CONTROL SENSORS
    • DATA DISSEMINATION TO AEGIS, PATRIOT, AND FIGHTERS
  • DEVELOP AND EVALUATE
    • CONOPS
    • DATA DISSEMINATION CONCEPTS SUPPORTING TAD AND TMD
NOT AVAILABLE
    SCHEDULE:
  • FY96 START
  • 3-4 OPERATIONAL SYSTEMS IN 2001
    STATUS:
  • JPO BEING FORMED WITH ARMY LEAD
  • PROGRAM DETAILS BEING DEFINED
    FUNDING ($M):
    FY97 FY98 FY99 FY00 FY01
    40.0 110.0 140.0 115.0 120.0
    *FUNDS IDENTIFIED IN PBD 725.
    PLAYERS:
  • ARMY SSDC, NAVY PEO TAD, AF PEO, ARPA, BMDO
  • USERS TBD
    TECHNOLOGY:
  • AEROSTAT DERIVATIVE OF EXISTING DESIGNS (NOMINALLY 91M VS. EXISTING 71M)
  • SENSORS ARE LIGHTWEIGHT DERIVATIVES OF EXISTING SYSTEMS



AEROSTATS FOR CRUISE MISSILE DEFENSE ACTD (PROPOSED) EXIT CRITERIA

OPERATIONAL CAPABILITY
CURRENT CAPABILITY
END GOALS











NOT AVAILABLE