Mission Description and Budget Item Justification: The changing global threat and the new Army Warfighting Doctrine developed to respond to this changing threat all significantly impact the mission of Air Defense Artillery (ADA). This doctrine calls for U.S. forces to be able to win two nearly simultaneous major regional conflicts and to conduct combat operations characterized by rapid response and a high probability of success while minimizing the risk of significant American casualties. ADA must continually be upgraded and modernized in accordance with the ADA missions. The FY 98 budget funds critical improvements to PATRIOT and Stinger. These projects support development of upgrades to current equipment and are appropriately funded in Budget Activity 7.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D036

PATRIOT Product Improvement Program

43137

46280

12388

9474

5777

4768

0

0

0

401886

A. Mission Description and Justification D036 - PATRIOT Product Improvement Program: The PATRIOT system is being upgraded through a series of individual materiel changes (MC) culminating in the attainment of the PATRIOT Advanced Capability - 3 (PAC-3) system. The communication upgrades improve PATRIOT’s above and below battalion communication equipment. These changes eliminate PATRIOT peculiar communications equipment and improve PATRIOT’s interoperability between systems and between the services.

Acquisition Strategy: The design objective of the PATRIOT system was to provide a baseline system capable of being modified to cope with the evolving threat. This alternative minimizes technological risks and provides a means of enhancing system capability through planned upgrades of deployed systems. The PATRIOT Program consists of two interrelated acquisition programs - The PATRIOT Growth Program and the PAC-3 Missile Program. Growth program modifications are grouped into configurations which are scheduled to be fielded in the same time-frame. Configuration groupings are a convenience for managing block changes of hardware and software and are not a performance-related grouping. However, incremental increases in performance will be determined for each configuration in order to provide benchmarks for configuration testing and for the development of user doctrine and tactics.

FY 1996 Accomplishments:

 

5226

P3I test program

 

3978

Communications upgrades

 

750

Responsive threat analysis

 

33183

Anti-Cruise Missile upgrade

Total

43137

 

FY 1997 Planned Program:

 

5326

P3I test program

 

5667

Communications upgrades

 

750

Responsive threat analysis

 

33437

Anti-Cruise Missile upgrade

 

1100

Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Programs

Total

46280

 

 

FY 1998 Planned Program:

 

5675

P3I test program

 

2960

Communication upgrade

 

750

Responsive threat

 

3003

Horizontal Battlefield Digitization

Total

12388

 

FY 1999 Planned Program:

 

5718

P3I test program

 

750

Responsive threat

 

3006

Horizontal Battlefield Digitization

Total

9474

 

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

46477

12291

9406

6481

Appropriated Value

47823

46280

   

Adjustments to Appropriated Value

-4686

     

FY 1998 President’s Budget Request

43137

46280

12388

9474

Change Summary Explanation: Funding: FY 1996: Undistributed Congressional reductions/rescissions (-2488); reprogramming to higher priority requirements (-2198).

FY 1998: Funding increase for Horizontal Battlefield Digitization (+2982).

FY 1999: Funding increase for Horizontal Battlefield Digitization (+2993).

C. Other Program Funding Summary

Missile Procurement, Army

FY 1996

FY 1997

FY 1998

FY 1999

FY 2000

FY 2001

FY 2002

FY 2003

To

Complete

Total

Cost

Budget Activity 2 - PATRIOT (C49100)

4924

0

349109

369885

459233

445367

433145

396760

12087483

Budget Activity 3 - PATRIOT Mod (C50700)

6767

23442

20825

15575

19589

24310

19894

16544

39645

565916

D. Schedule Profile

FY 1996

FY 1997

FY 1998

FY 1999

 

1

2

3

4

1

2

3

4

1

2

3

4

1

2

3

4

Development Test & Evaluation

 

X

                           

A. Project Cost Breakdown

FY 1996

FY 1997

FY 1998

FY 1999

Contract Engineering Support

37376

37926

6963

4006

Program Management Support

1301

1436

1691

1291

Developmental Test and Evaluation

4460

5818

3734

4177

SBIR/STTR

 

1100

   

Total

43137

46280

12388

9474

B. Budget Acquisition History and Planning Information

Performing Organizations

Contractor or Government Performing Activity

Contract Method/Type or Funding Vehicle

Award or Obligation Date

Performing Activity EAC

Project Office

EAC

Total

Prior to

FY 1996

 

 

FY 1996

 

 

FY 1997

 

 

FY 1998

 

 

FY 1999

 

Budget to Complete

 

Total Program

Product Development Organizations

Raytheon

                     

DAAH0182CA181

       

3722

         

3722

DAAH0187CA025

       

22455

         

22455

DAAH0189C0458

       

23228

         

23228

DAAH0192C0036

       

5000

         

5000

Small Contracts

       

1168

         

1168

General Electric

                     

DAAH0187CA006

       

4824

         

4824

Brunswick Corp.

                     

DAAH0189C0167

       

3100

         

3100

Martin Marietta

                     

DAAH0192C0301

SS/CPFF

15Jul92

5463

5463

3763

100

       

3863

Raytheon

                     

DAAH0191C0602

SS/CPIF

22Apr92

20702

20702

23077

         

23077

DAAH0192C0006

SS/CPAF

27Jan92

   

56460

         

56460

DAAH0195C0043

SS/CPAF

01Feb95

   

6005

4093

513

1000

1000

1690

14301

PAC 2 Anti-Cruise

         

33183

32637

     

65820

TPS

           

200

     

200

RL-CEU

           

4576

2960

   

7536

Horiz Btlfld Digit

             

3003

3006

 

6009

SBIR/STTR

           

1100

     

1100

Support and Management Organizations

CAS

                     

DAAH0187CA008

       

2270

         

2270

DAAH0190C0487

       

6266

         

6266

DAAH0194C0105

C/CPAF

31Jan94

   

5344

791

 

791

791

422

8139

In-House Support

       

10817

510

1436

900

500

1163

15326

Test and Evaluation Organizations

Missile Command

1095

     

2322

1098

1882

1000

700

1312

8314

White Sands Missile Range

1095/MIPR

 

 

 

 

 

 

2841

1370

2596

1534

1737

2843

12921

Other Govt Agen

MIPR

     

2023

1992

1340

1200

1740

3115

11410

RDEC and

Other Govt Agent

       

95377

         

95377

Government Furnished Property: None.

Subtotal Product Development

152802

37376

39026

6963

4006

1690

241863

Subtotal Support and Management

24697

1301

1436

1691

1291

1585

32001

Subtotal Test and Evaluation

102563

4460

5818

3734

4177

7270

128022

Total Project

280062

43137

46280

12388

9474

10545

401886

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D303

Stinger Product Improvement Program

16061

18277

5024

1957

27982

27984

39406

39456

Continuing

Continuing

A. Mission Description and Budget Item Justification: D303-Stinger Product Improvement Program: This project provides a product evolution of the STINGER-RMP to improve countermeasures capability via externally loaded software, which is downloaded from a reprogrammable module in the gripstock. This concept allows for timely upgrades to correct system deficiencies, rapid reaction to new threats or threat countermeasures, development of specialty software programs where full capability may not be desired, and accommodation of new missions. The Block I upgrade project, which adds a roll sensor and enhanced software, extends the missile service life, solves the recognized system performance deficiencies in countermeasures and other engagement conditions, and increases terminal accuracy. The Block II program is a development of an advanced infrared (IR) Focal Plane Array Seeker which improves the performance of the missile against an expanded target and in background clutter. The program develops the improved missile for adaptation to any or all of the STINGER firing platforms, extends the missile service life and establishes a government post deployment software support posture. The Block II Engineering, Manufacturing, Development (EMD) program provides for development to a performance specification, design qualification of guidance section conducted as part of the production qualification, and platform integration. A portion of funds in FY 1996 and FY 1997 will be used to develop MIL-STD 1760 launcher electronics to be fielded with the Apache Longbow Helicopter air-to-air requirements, based on Joint Service (U.S. Air Force and U.S. Army) doctrine. The air-to-air requirement satisfies three tasks: self protection, protect force, and augmentation of air defense forces. Funding in FY 1996 and FY 1997 in this project also supports an eight nation Memorandum of Understanding (MOU) signed by the Office of Secretary of Defense in 1994 for the conduct of a two-year competitive Feasibility Study on NATO Very Short Range Air Defense Systems (VSHORADS) and Short Range Air Defense Systems (SHORADS). The output of the Feasibility Study will form the basis for the development of a VSHORADS/SHORADS NATO Staff Requirement and information to support the development of a follow-on system to STINGER.

Acquisition Strategy: The Block I development program is a Sole Source (SS)/Cost Plus Incentive Fee (CPIF) contract awarded in 1992. The Block II development began FY 1993 as Technology Base Broad Agency announcement with a SS/Cost Plus Fixed Fee (CPFF) contract. Current SS/CPFF contract awarded 1996 for pre-EMD, EMD start FY 2000, MS IIIa FY 2005, and FUE FY 2007. A SS/CPIF contract for MIL-STD Launcher electronics development is planned for mid-FY 1997. The VSHORADS/SHORADS Competitive/Firm Fixed Price (FFP) contract was awarded to two international consortia. The United Kingdom was designated as the Pilot Nation, serving as Contracting Authority.

FY 1996 Accomplishments:

 

2007

Conducted testing of Block I Phase II Software

 

1019

Completed Block I Phase II Software Design; performed Block I Software Critical Design Review and release Engineering Change Proposal

 

493

Initiated Block I performance assessment

 

4238

Fabricated/tested second Block II Seeker Head

FY 1996 Accomplishments: (continued)

   
 

3088

Initiated Block II electronics state-of-the-art packaging (miniaturization) of electronics section

 

1434

Upgraded Block II Seeker to correct limitations discovered in initial development

 

1040

Initiated development of contractor Block II Simulation and defined Platform versus Block II interfaces

 

1127

Initiated development of Stinger Universal Electronics for MIL-STD 1760 launcher which supports digital electronic-based systems.

 

575

Conducted Bradley linebacker concept studies

 

200

VSHORADS/SHORADS international proposal evaluation/negotiations/contract awards

 

840

VSHORADS/SHORADS technology and subsystem development

Total

16061

 

FY 1997 Planned Program:

 

702

Complete Block I performance assessment

 

2435

Initiate development of Unmanned Aerial Vehicle (UAV) specific software

531

UAV software performance analysis

 

3898

Produce prototype Block II electronics state of the art packaging (miniaturization) of electronics section

 

4811

Integration of Block II tactical-sized guidance assembly

 

2191

Perform valuation of Block II guidance assembly

 

2202

VSHORADS/SHORADS system variants development and evaluation of system variants

 

1061

Continue development of MIL-STD 1760 Launcher electronics

 

446

Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Programs

Total

18277

 

FY 1998 Planned Program:

 

1450

Finalize Block II packaging and fabricate one tactical size guidance section

 

1464

Design and package Block II control section

 

460

Initiate development of contractor hardware-in-the-loop flight simulations

 

1650

Complete VSHORADS/SHORADS Feasibility Study and Forward NATO Staff Requirement

Total

5024

 

FY 1999 Planned Program:

 

735

Design/fabricate/evaluate three Block II launch tube and end cap units

 

840

Continue Contractor Hardware-in-the Loop Flight Simulations

 

382

Block II airframe dynamic analysis/performance prediction

Total

1957

 

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

13662

18668

2314

2849

Appropriated Value

14046

18277

   

Adjustments to Appropriated Value

2015

     

FY 1998 President’s Budget Request

16061

18277

5024

1957

Change Summary Explanation: Funding: FY 1996: Funding reprogrammed for OSD International MOU program, Bradley concept studies, and launcher electronics design (+2743); project decrement for undistributed congressional reductions and rescissions (-728).

FY 1998: Funding reprogrammed to support Block II development effort (+2710).

FY 1999: Funding reprogrammed to higher priority requirements (-892).

Schedule: None

Technical: Block II EMD risk reduction initiatives FY 1998-99

C. Other Program Funding Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 2000

FY 2001

FY 2002

FY 2003

To

Compl

Total

Cost

Missile Procurement, Army

                   

Budget Activity 2 - Stinger (C18500)

                 

1143340

Budget Activity 3 - Stinger Mods (C20000)

9804

29742

8710

14403

24086

34519

40108

31872

Cont’d

Cont’d

Budget Activity 3 - BSFV-E Mods (C21500)

1500

7118

3701

10

   

16866

26866

Cont’d

Cont’d

D. Schedule Profile

FY 1996

FY 1997

FY 1998

FY 1999

 

1

2

3

4

1

2

3

4

1

2

3

4

1

2

3

4

Block I CDR Software ECP

     

X

                       

Block I Performance Assessment

         

X

                   

Complete Block I Flight Tests

     

X

                       

Initiate Future Software Development

         

X

                   

Initiate Block II Guidance Section

Integration Design

           

X

                 

Complete Block II Tactical Size

Electronics

             

X

               

Complete Block II Guidance

Section Integration

                     

X

       

Complete Integration of Guidance

Hardware with Contractor Simulation

                             

X

A. Project Cost Breakdown

FY 1996

FY 1997

FY 1998

FY 1999

Project Management In-House

821

1199

414

75

RDEC Engineering Support

2334

3843

200

159

Major Development Contractor

11097

10448

2760

1723

Contracted Services

727

97

   

Other Government Agencies

42

42

   

UK MOU Contractor

643

1732

1207

 

UK Management Office

106

176

124

 

UK MOU U.S. Program Support

291

294

319

 

SBIR/STTR

 

446

   

Total

16061

18277

5024

1957

B. Budget Acquisition History and Planning Information

Performing Organizations

Contractor or Government Performing Activity

Contract Method/Type or Funding Vehicle

Award or Obligation Date

Performing Activity EAC

Project Office

EAC

Total

Prior to

FY 1996

 

 

FY 1996

 

 

FY 1997

 

 

FY 1998

 

 

FY 1999

 

Budget to Complete

 

Total Program

Product Development Organizations

Hughes Msl Sys

                     

DAAH0192C0213

SS-CPIF

Apr 92

 

20606

18224

2382

       

20606

Future S/W Upgrd

TBD

TBD

       

2105

     

2105

DAAH0193CR127

SS-CPIF

Apr 93

4629

4629

4629

         

4629

DAAH0196C0180

SS-CPFF

Mar 96

     

6750

7196

     

13946

BLOCK II 98-99

SS-CPIF

TBD

         

2760

1723

 

4483

Block II EMD

SS-CPIF

TBD

             

125805

125805

DAAH0195C0028

SS-CPFF

Sep 96

     

1965

       

1965

SUE Dev

SS-CPIF

Apr 97

       

841

     

841

Targets Mgt Ofc

MIPR

Apr 94

   

2100

         

2100

Targets Mgt Ofc

MIPR

Various

             

12013

12013

BSFV Aggregate

Various

Various

   

7025

         

7025

Block I Aggregate

Various

Various

   

8152

50

52

     

8254

PMO/RDEC

Allot/1095

Various

     

3155

4902

614

234

54936

63841

Blk II Contracted Svcs (Aggregate)

Various

Various

   

181

       

8836

9017

SUE Aggregate

Various

Various

     

102

45

     

147

Other Govt Agen

MIPR

Various

     

42

42

   

3238

3322

SBIR/STTR

           

446

     

446

British Aerospace

C-FFP

Jul 96

     

322

866

604

   

1792

Thomson-CSF

C-FFP

Aug 96

     

321

866

603

   

1790

UK Ministry of Defense (Mgt Ofc)

MOU/1095

Dec 95

     

106

176

124

   

406

SBIR/STTR

           

446

     

446

Support and Management Organizations

DLA90093D0011

SS-FFP

Aug 96

     

575

       

575

U.S. Prog Spt MOU VSHORAD/

SHORADS

1095

Dec 95

     

291

294

319

   

904

Test and Evaluation Organizations: None

Government Furnished Property: Not applicable

Subtotal Product Development

40311

15195

17983

4705

1957

204828

284979

Subtotal Support and Management

 

866

294

319

   

1479

Subtotal Test and Evaluation

             

Total Project

40311

16061

18277

5024

1957

204828

286458