Index

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

A. Mission Description and Budget Item Justification: This project supports the engineering development/enhancement of the Electronic Tactical User Terminal (ETUT), Mobile Integrated Tactical Terminal (MITT), Forward Area Support Terminal (FAST), Advanced Electronic Processing Dissemination System (AEPDS) and Tactical Exploitation System (TES). The Army’s emerging TES will incorporate the standards and protocols dictated by the Common Imagery Ground/Surface System (CIGSS) program. TES brings all of the existing and emerging Army TENCAP capabilities (AEPDS, MIES, and ETRAC) into an integrated common baseline; downsized, modular and scaleable to meet a wide range of contingency requirements. TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems [including MIES and ETRAC that are funded under the Defense Airborne Reconnaissance Program (DARP) (PE 0305154D)]. Specific details are provided in the Tactical Intelligence and Related Activities (TIARA) Congressional Justification Book, Volume II and in the Army TENCAP Master Plan. This PE supports research efforts in the engineering and manufacturing development phases of the acquisition strategy and is therefore correctly placed in Budget Activity 5.

Acquisition Strategy: The Army Space Program Office (ASPO) strives for an acquisition environment emphasizing stable funding, low density acquisition, minimal use of MILSPECS, and managed competition. By tailoring existing technology, leveraging the best commercial practices, and using commercial and government off-the-shelf software, ASPO minimizes risk while maximizing efficiency. Finally, dedicated cradle to grave Integrated Logistics Support (ILS) for TENCAP systems is accomplished through a coordinated effort by government and contractor personnel and facilities.

FY 1996 Accomplishments:

 

12102

Continued software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit national capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products.

 

606

Completed the retrofit of ETUT with enhanced MITT hardware and software.

 

2356

Continued effort to combine ETUT and EPDS capabilities into AEPDS.

 

900

Completed building/fielding of five additional MITTs.

 

1094

Initiated engineering development of TES.

 

6208

Continued support to TENCAP program management and administrative activities [e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support].

Total

23266

 

FY 1997 Planned Program:

 

4608

Continue software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit national capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products.

 

5106

Continue engineering development of TES.

 

2197

Complete effort to combine ETUT and EPDS capabilities into AEPDS.

 

2958

Continue support to TENCAP program management and administrative activities [e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support.

 

366

Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR)

Total

15235

 

FY 1998 Planned Program:

 

6965

Continue software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit national capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products. In addition to staying current with national and theater capabilities, will include integration of Global Broadcast System (GBS) and the Joint Tactical Terminal (JTT) into the TENCAP systems.

 

8585

Continue engineering development of TES.

 

3563

Continue support to TENCAP program management and administrative activities [e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support].

Total

19113

 

FY 1999 Planned Program:

 

5703

Continue software upgrades and enhancements for the refinement of the TENCAP Common Baseline to fully exploit national capabilities such as integration of communications capabilities to meet changing architectures and implementation of software appliqué to provide the operational commander with enhanced battlefield intelligence products. In addition to staying current with national and theater capabilities, will include integration of Global Broadcast System (GBS) and the Joint Tactical Terminal (JTT) into the TENCAP systems.

 

10405

Continue engineering development of TES.

3423

Continue support to TENCAP program management and administrative activities [e.g. FFRDC (Aerospace), ARL support, ASPO support , Army Topographic Engineering Center (TEC) and Contractor SETA support].

Total

19531

 

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

23861

15758

20631

21235

Appropriated Value

24101

15235

   

Adjustments to Appropriated Value

-835

     

FY 1998 BES/Pres Bud Request

23266

15235

19113

19531

C. Other Program Funding Summary

RDTE,A Budget Activity 4

FY 1996

FY 1997

FY 1998

FY 1999

FY 2000

FY 2001

FY 2002

FY 2003

To

Compl

Total

Cost

PE 0603766A Project D907

TENCAP-Adv Dev

26796

25354

20920

23714

24751

29020

30920

31095

Cont

Cont

RDTE, D Budget Activity 7

               

Cont

Cont

PE 0305154D DARP

41526

50287

0

0

0

0

0

0

   

PE 0305208D DARP

   

30433

28175

22214

24108

23583

23179

   

Other Procurement Army, OPA-2

                   

BZ7315 TENCAP

4473

1756

1679

1728

4598

13703

14779

16822

Cont

Cont

Procurement, Defense Wide

               

Cont

Cont

PE 0305154D DARP

80822

89945

0

0

0

0

0

0

   

PE 0305208D DARP

   

94070

81600

80576

71867

73926

75239

   

D. Schedule Profile

FY 1996

FY 1997

FY 1998

FY 1999

 

1

2

3

4

1

2

3

4

1

2

3

4

1

2

3

4

Complete Development and Field five Additional MITTs

 

X*

                           

Complete Retrofit and Refield ETUTs

   

X*

                         

Complete and Field DAMA Appliqué into SUCCESS Radios

             

X

               

Initiate Engineering Development of TES

     

X*

                       

Install GSD into FAST Systems

     

X*

                       

Complete AEPDS

         

X

                   

Initiate integration of GBS into AEPDS/TES

                 

X

           

Initiate integration of JTT into AEPDS/TES

                       

X

     

Complete integration of GBS into AEPDS/TES

                           

X

 

* Milestone completed

A. Project Cost Breakdown

FY 1996

FY 1997

FY 1998

FY 1999

MITT

900

0

   

ETUT

2962

2197

   

TES

1094

5106

8585

10405

Common Baseline (*1)

12102

4608

6965

5703

FFRDC

1767

1220

1274

1297

System Engineering (Contractor)

4441

1738

2289

2126

SBIR/STTR

 

366

   

Total

23266

15235

19113

19531

(*1) TENCAP Common Baseline addresses common subsystems, planned improvements, key activities and ongoing/planned initiatives determined to have potential application to multiple TENCAP systems [including MIES and ETRAC that are funded under the DARP (PE 0305154D)]

B. Budget Acquisition History and Planning Information: Not Applicable

THIS PAGE INTENTIONALLY LEFT BLANK