Index

 

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

Total Program Element (PE) Cost

NOTE: Effective FY 1998, this PE has been restructured to reflect under Project DF30 the US Army Test and Evaluation Command’s (TECOM) new mission as Test Integrator under the Army’s new Integrated Test and Evaluation (T&E) Process (funded in D630 in FY97) along with technical testing at all TECOM Test Centers (previously funded under Projects DE90, DE91, DE93, D618 and D632). (DE92 was moved in FY 1997 to DoD PE 0605384BP). The FY 1997 consolidation of the Army’s materiel evaluation mission under the US Army Operational Test and Evaluation Command (OPTEC) is financed under Project D630 in FY97 and through new Project D699 beginning in FY 1998.

Mission Description and Budget Item Justification: Sustains an objective test capability for technical testing and support to operational testing of DoD materiel, weapons and weapons systems from concept through production within the acquisition cycle at four Major Range and Test Facility Bases: Yuma Proving Ground, AZ; Aberdeen Test Center, Aberdeen Proving Ground, MD; Dugway Proving Ground, UT (through FY 96 only), White Sands Missile Range, NM. This PE also sustains an objective technical test capability at: Aviation Technical Test Center, Fort Rucker AL; Redstone Technical Test Center, Redstone Arsenal, AL; and a capability to provide for integrated test planning plus safety assessment/verification, and to perform test design and evaluation functions for non-major programs. Technical test capabilities at each

test range have been uniquely established, are in place to support independent test and evaluation (T&E) requirements of funded weapons programs, and are required to assure technical performance, adherence to safety requirements, reliability, logistics supportability, and quality of materiel in development and in production. Program funding includes efforts toward leveraging technologies to include procurement of essential equipment, personnel training and facility modernization to support the

warfighter’s testing requirements. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test costs and program acquisition costs. Current testing capabilities are not duplicated within DoD and represent baseline requirements to assure acceptable risk to the soldier as new technologies emerge into fielded weapons systems. As part of the DoD RELIANCE initiative, the Army (via this PE) has committed at the highest senior service levels to be the lead agency for ground vehicles, gun munitions, electric guns, surface-to-air missiles. This initiative is currently supported by the services Vice Chiefs of Staff in their role as the T&E Board of Directors. This PE finances indirect test operating costs not billable to test customers, replacement of test equipment and test facility modernization projects to maintain current testing capabilities and improvements to safety, environmental protection, efficiency of test operations, and technological advances. This PE does not finance reimbursable costs directly identified to a user of these ranges; these direct costs are borne by materiel developers and project/product managers in accordance with DoD Directive 3200.11. This PE also includes costs to downsize the workforce commensurate with T&E workload reductions. Starting in FY 1997, funding for Project DE92 has been transferred to DoD PE 0605384BP, Chemical and Biological Defense Program. Test and Evaluation operations are required for general research and development; therefore, this PE is appropriate for inclusion in Budget Activity 6.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

DF30

Army Test Ranges & Facilities

0

0

119728

126953

108082

110337

112856

115699

Continuing

Continuing

A. Mission Description and Justification: Sustains an objective test capability for technical testing and support to operational testing of DoD materiel, weapons and weapons systems from concept through production within the acquisition cycle at three Major Range and Test Facility Bases: Yuma Proving Ground, AZ; Aberdeen Test Center, Aberdeen Proving Ground, MD; White Sands Missile Range, NM. This program also sustains an objective technical test capability at: Aviation Technical Test Center, Fort Rucker AL; Redstone Technical Test Center, Redstone Arsenal, AL; and a capability to provide for integrated test planning plus safety assessment/verification. Technical test capabilities at each test range have been uniquely established, are in place to support independent test and evaluation (T&E) requirements of funded weapons programs, and are required to assure technical performance, adherence to safety requirements, reliability, logistics supportability, and quality of materiel in development and in production. Program funding includes efforts toward leveraging technologies to include procurement of essential equipment, personnel training and facility modernization to support the warfighter’s testing requirements. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test costs and program acquisition costs. Current testing capabilities are not duplicated within DoD and represent baseline requirements to assure acceptable risk to the soldier as new technologies emerge into fielded weapons systems. Program also finances indirect test operating costs not billable to test customers, replacement of test equipment and test facility modernization projects to maintain current testing capabilities and improvements to safety, environmental protection, efficiency of test operations, and technological advances. It also includes costs to downsize the workforce commensurate with T&E workload reductions.

FY 1996 Accomplishments: Project funded under projects DE90, DE91, DE92, DE93, D618, D632 and that portion of D630 which provided for command-wide integrated test planning, safety assessment/verification and test operations.

FY 1997 Planned Program: Project funded under projects DE90, DE91, DE93, D618, D632 and that portion of D630 which provided for command-wide integrated test planning, safety assessment/verification and test operations.

 

FY 1998 Planned Program:

119252

Command-wide integrated test planning, safety assessment/verification and test operations (previously funded under DE90, DE91, DE93, D618, D630, and D632). Some of the major systems to be tested include: ABRAMS Tank at Aberdeen Test Center (ATC), LONGBOW Apache at Yuma Proving Ground (YPG), Naval Ship Structures at ATC, Artillery Systems Dem/Val (Crusader) at YPG, LONGBOW HELLFIRE at Redstone Technical Test Center (RTTC), COMANCHE Helicopter subsystems at YPG and Aviation Technical Test Center (ATTC), Javelin at RTTC, Light/Medium Tactical Vehicles (4X4) at ATC, Army Tactical Missile System (ATACMS) Block IA and II at White Sands Missile Range (WSMR), Bradley Infantry Fighting Vehicle System at ATC and YPG, Theater Missile Defense and Theater Area High Altitude Area Defense at WSMR, Brilliant Anti-Armor Terminally Guided Submunition (BAT) at WSMR and RTTC, Multiple Launch Rocket System (MLRS) and Launcher at WSMR and RTTC, Improved Target Acquisition System/TOW missile at RTTC, Enhanced Fiber Optic Guided Missile (EFOG-M) at RTTC and WSMR, Aircraft Survivability Equipment at ATTC, Heavy Assault Bridge at ATC, Airborne Avionics at ATTC, Forward Area Air Defense Ground Based Sensor at WSMR, Air Reconnaissance Low at ATTC and WSMR, EH-60 QUICKFIX at WSMR, M915A2 Line Haul Truck at ATC, M1 Breacher at ATC, Advanced Field Artillery Tactical Data System (AFATDS) at YPG, Land Warrior at ATC and YPG, and Heavy Utility Truck at ATC.

 

476

Airborne Engineering Evaluation Support Activity (AEESA)

Total

119728

 

FY 1999 Planned Program:

 

121089

Command-wide integrated test planning, safety assessment/verification and test operations. Some of the major systems to be tested include: ABRAMS Tank at Aberdeen Test Center (ATC), LONGBOW Apache at Yuma Proving Ground (YPG), Close Combat Tactical Trainer (CCTT) at ATC and White Sands Missile Range (WSMR), Naval Ship Structures at ATC, Artillery Systems Dem/Val (Crusader) at YPG, LONGBOW HELLFIRE at Redstone Technical Test Center (RTTC), COMANCHE Helicopter subsystems at YPG and Aviation Technical Test Center (ATTC), Javelin at RTTC, Medium and Light/Medium Tactical Vehicles (4X4) at ATC, Army Tactical Missile System (ATACMS) Block IA and II at WSMR, Bradley Infantry Fighting Vehicle System at ATC and YPG, Theater Missile Defense and Theater Area High Altitude Area Defense at WSMR, Mine Neutralization at YPG, Brilliant Anti-Armor Terminally Guided Submunition (BAT) at WSMR and RTTC, Multiple Launch Rocket System (MLRS) and Launcher at WSMR and RTTC, Improved Recovery Vehicle at ATC, Improved Target Acquisition System/TOW missile at RTTC, Follow-on to TOW at RTTC, SMART-T at WSMR, Enhanced Fiber Optic Guided Missile (EFOG-M) at RTTC and WSMR, Aircraft Survivability Equipment at ATTC, Heavy Assault Bridge at ATC, Airborne Avionics at ATTC, Forward Area Air Defense Ground Based Sensor at WSMR, Improved Cargo Helicopter at ATTC, EH-60 QUICKFIX at WSMR, 2-1/2 Ton, 5 Ton, and HMMWV Extended Service Life Program at ATC, M1 Breacher at ATC, Advanced Field Artillery Tactical Data System (AFATDS) at YPG, Land Warrior at ATC and YPG, and 10 Ton Recovery Truck (8X8) at ATC. Includes funding for workforce reduction commensurate with test workload.

 

486

Airborne Engineering Evaluation Support Activity (AEESA)

 

5378

Modernization of test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

126953

 

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

0

0

0

0

Appropriated Value

0

     

Adjustments to Appropriated Value

       

FY 1998 Pres Bud Request

0

0

119728

126953

Change Summary Explanation:

Funding: This is a new project combining the prior individual projects for each TECOM test center and the TECOM HQ integrated test planning and safety assessment/verification functions. The funds shown represent no substantial change from the prior total guidance for all test projects in FY 98, less the realignment of the independent assessment function to D699 (+2371 in FY 98 and +1937 in FY 99). Remaining increase represents modernization requirements to meet documented workload changes driven by the funding profiles of DoD development and acquisition programs.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

DE90

Yuma Proving Ground

19988

17054

0

0

0

0

0

0

0

37042

A. Mission Description and Justification: Project DE90 Yuma Proving Ground: Yuma Proving Ground (YPG), AZ is DoD’s primary artillery, air delivery and desert test range. Vast tracts of varied desert terrain provide testers with conditions found in the Middle East and other desert areas. YPG’s mission is to plan, conduct, analyze, and report the results of development and other tests of aircraft armament, long-range cannon artillery, air delivery, and mobility systems. Major facilities include an artillery firing range; Army’s only air-to-ground aircraft armament range with precision real-time instrumentation; the Army’s only weapons accuracy range with actual targets for testing direct fire aircraft and weapons; an instrumented air delivery test area; and desert and dust mobility test areas. YPG is designated as the DoD primary test site for electromagnetic/electrothermal gun systems under Project Reliance. Under Reliance, YPG is also designated as the primary site for the conduct of indirect fire gun munitions and a specialty site for land vehicle testing. YPG assumed the full munitions production acceptance testing mission from Jefferson Proving Ground in FY 95 under the Base Realignment and Closure Act (BRAC). Effective with FY 95, YPG assumed management of all extreme natural environment testing (desert, cold weather, and tropic) with no change in physical locations (tropic testing will continue in Panama and cold weather testing in Alaska), but with reduced management and manpower to support streamlined test operations. Cold Regions Test Activity (CRTA), Fort Greeley, AK is the only cold region environmental test center within DoD. This program includes support of development and production acceptance testing to determine the effects of extreme cold weather, wind, and snow on the performance of weapons systems and materiel in full operation and the man/materiel interface as well as the performance of extreme cold weather specific equipment. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test costs and program acquisition costs.

FY 1996 Accomplishments:

 

19988

Some of the largest system level programs tested were:

Survivable Tire Test, CRUSADER Field Artillery System, C17 Aircraft - Army Interface, VOLCANO Mine, and USMC Light Armored Vehicle.

Institutional funds were also used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

19988

 

FY 1997 Planned Program:

 

17054

Key test programs are: COMANCHE, 2nd Generation FLIR, Ground Combat Identification, Air Drop Equipment Advanced Developments, Aircraft Survivability Equipment, CRUSADER Field Artillery System (AFAS), and Field Artillery Resupply Vehicle (FARV) Advanced Development.

Institutional funds are also to be used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

17054

 

 

FY 1998 Planned Program: Project consolidated under project DF30.

FY 1999 Planned Program: Project consolidated under project DF30.

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

22185

17418

15560

17305

Appropriated Value

22801

17054

   

Adjustments to Appropriated Value

-2813

     

FY 1998 Pres Bud Request

19988

17054

0

0

Change Summary Explanation:

Funding : FY 1996 decreased (-2813); (-692) for undistributed Congressional reductions and rescissions; and (-2121) reprogrammed to fund higher priorities. Project consolidated under project DF30 effective FY 1998.

 

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

DE91

Aberdeen Test Center

34138

34436

0

0

0

0

0

0

0

68574

A. Mission Description and Justification: Project DE91 Aberdeen Test Center: Aberdeen Test Center (ATC), formerly known as Combat Systems Test Activity, Aberdeen Proving Ground, MD is DoD’s designated lead agency for land vehicle testing and Congressionally mandated live fire testing. Under Project Reliance, ATC is designated as primary test site for land vehicle and direct fire gun munitions testing. ATC is responsible for conducting development tests of weapons and weapon systems; munitions and components; survey and target acquisition equipment; combat, special, and general purpose vehicles and ancillary automotive equipment; combat engineer equipment; and troop support and individual equipment. ATC is the DoD tester for vulnerability/lethality of Army systems. Major facilities include the Munson automotive test courses, firing ranges addressing a wide variety of firing capabilities, cross-country automotive test sites, a unique robotics vehicle test facility, moving target projection facility, live fire evasive target, armor/anti-armor depleted uranium containment facility (Super Box), the elevated rail threat launch facility, underwater test facility for the conduct of tests for surface and subsurface ship structures (Navy support), and a number of special test laboratories. Includes personnel costs to downsize the workforce commensurate with the T&E workload. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test costs and program acquisition costs.

FY 1996 Accomplishments:

 

32993

Some of the largest systems level programs tested were:

M1A2 ABRAMS Tank, Armored Gun System Closeout Testing, 120mm Mortar System, BRADLEY Fighting Vehicle System, and Navy Ship Structures Program.

Institutional funds were also used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

 

1145

Personnel downsizing costs.

Total

34138

 

FY 1997 Planned Program:

 

34436

Some of the systems programmed for testing are:

Advanced Tank Armaments, M1A1 Block Improvement Program, Ground Combat Identification, M1A2 ABRAMS Tank, Halon Substitutes for Automatic Fire Extinguishers, and SEAWOLF Hull Structure Shock Tests.

Institutional funds are also to be used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

34436

 

 

FY 1998 Planned Program: Funding consolidated under project DF30.

FY 1999 Planned Program: Funding consolidated under project DF30.

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

36378

35172

34161

34790

Appropriated Value

37388

34436

   

Adjustments to Appropriated Value

-3250

     

FY 1998 Pres Bud Request

34138

34436

0

0

Change Summary Explanation: Funding consolidated under project DF30 effective FY 1998.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

DE92

Dugway Proving Ground

12508

0

0

0

0

0

0

0

0

12508

A. Mission Description and Justification: Project DE92 Dugway Proving Ground: Dugway Proving Ground (DPG), UT, is the DoD designated primary test facility under Project Reliance for Chemical/Biological defense testing. This project provides for maintaining a capability for development, production, and product improvement tests of chemical/biological defense systems and smoke munitions systems; battle field obscurant/smoke testing; and chemical biological defense (CBD) support for DoD agencies and treaty compliance. Effective with FY 1997, this project was transferred to DoD (PE 0605384BP) in accordance with PL 103-160. It also provides, within mission area, for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction test and program acquisition costs.

FY 1996 Accomplishments:

 

11411

Some of the largest system level programs tested were:

Joint Chemical Biological Contact Point and Test, Chemical Warfare Treaty Support, XM22 Automatic Chemical Agent Alarm, Advanced Chemical/ Biological Battledress Overgarment, and M56 Smoke Generating System.

Institutional funds were also used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

 

1097

Personnel downsizing costs

Total

12508

 

FY 1997 Planned Program: Project transferred to DoD effective FY 1997.

FY 1998 Planned Program: Project transferred to DoD effective FY 1997.

FY 1999 Planned Program: Project transferred to DoD effective FY 1997

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

13302

0

0

0

Appropriated Value

13671

     

Adjustments to Appropriated Value

-1163

     

FY 1998 Pres Bud Request

12508

0

0

0

Change Summary Explanation: Funding: Project transferred to DoD PE 0605384BP, Chemical and Biological Defense Program, effective FY 1997

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

DE93

White Sands Missile Range

55176

59945

0

0

0

0

0

0

0

115121

A. Mission Description and Justification: Project DE93 White Sands Missile Range: White Sands Missile Range (WSMR), NM, is the largest, multi-purpose, overland test range within DoD. This project provides for testing of ballistic and guided missiles, air defense systems, and artillery missile systems for all services. It is the DoD designated primary test facility for overland surface-to-air and surface-to-surface missile testing and nuclear effects under Project Reliance. Launch complexes are integrated into a modern, real-time data collection and data reduction processing system. Facilities include optical and calibration laboratories, inertial guidance test facilities, full spectrum nuclear effects facilities (i.e., radiation, thermal, blast, electromagnetic pulse), temperature, shock, vibration, and electromagnetic effects, and a fully landlocked/secure test missile flight facility. WSMR facilities and services are extensively utilized by the Tri-Services, National Aeronautics and Space Administration, and other government agencies and includes support to the High Energy Laser Systems Test Facility located at WSMR. Effective FY 95, management of the Electronic Proving Ground (EPG), Fort Huachuca, AZ (DE94) was consolidated under WSMR. EPG is unique within DoD because of the electromagnetically "clean" environment, extensive real estate, low annual rainfall, and special facilities required to perform development tests for communications, command and control, optical/electro-optical, signal intelligence, and electronic warfare equipment and systems. EPG operates an electro-magnetic environment test facility, an unmanned aerial vehicle test facility, antenna pattern measurement facility, Electro-Magnetic Interference (EMI)/Electro-Magnetic Compatibility (EMC)/TEMPEST test facility, communication test facility, outdoor compact antenna range, high frequency test facility, stress loading facility, and an electro-optical systems test facility. The mission of creating, developing, and maintaining data bases at EPG for standard tactical deployment scenarios for electromagnetic capability and vulnerability will be continued. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test and program costs.

FY 1996 Accomplishments:

 

55176

Some of the largest system level programs tested were:

PATRIOT Missile System, Theater High Altitude Area Defense (THAAD), Theater Missile Defense (TMD), Army Tactical Command & Control System (ATCCS), and Multiple Launch Rocket System.

Institutional funds were also used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

55176

 

 

FY 1997 Planned Program:

 

59945

Some of the key systems programmed for testing are:

Theater Missile Defense/Theater High Altitude Area Defense, PATRIOT Advanced Configuration,

STINGER Product Improvement, BAT Pre-Planned Product Improvements, All Source Analysis System (ASAS) Evolutionary Developments, Command and Control Vehicle, Navy STANDARD Missile, Navy Research Rockets, and Air Force AMRAAM.

Institutional funds are also to be used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

59945

 

FY 1998 Planned Program: Funding consolidated under project DF30.

FY 1999 Planned Program: Funding consolidated under project DF30.

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

51766

61233

57883

57878

Appropriated Value

53203

59945

   

Adjustments to Appropriated Value

+1973

     

FY 1998 Pres Bud Request

55176

59945

0

0

Change Summary Explanation: Funding consolidated under project DF30 effective FY98.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D618

Aviation Technical Test Center

14369

12557

0

0

0

0

0

0

0

26926

A. Mission Description and Justification: Project D618 Aviation Technical Test Center: Aviation Technical Test Center (ATTC), Fort Rucker, AL provides a capability for development, production, verification, and materiel change testing of Army aircraft, Aircrew systems/subsystems, and various items of related ground support equipment. Fleet Aircraft Sustainment Testing (FAST) is also conducted to provide continuous reliability/supportability data on new and modified aircraft systems/subsystems. Operates DoD’s only helicopter icing spray capability and low speed, fixed wing cloud physics instrumented aircraft which provide for qualification of helicopters for flight under icing conditions. Also funds the Airborne Engineering Evaluation Support Activity (AEESA) at CECOM which includes night vision research, aircraft modeling, flight support, modification of airframes and installation of night vision systems. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test and program acquisition costs.

FY 1996 Accomplishments:

 

9773

Some of the largest system level programs tested were:

UH-1H Helicopter, OH-58D KIOWA Warrior, COMANCHE, Lead-the-Fleet, and Special Operations Aircraft.

Institutional funds were also used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

 

4043

Personnel and other one time costs associated with downsizing and consolidation.

 

553

AEESA

Total

14369

 

FY 1997 Planned Program:

 

11731

Some of the key systems programmed for testing are:

COMANCHE Subsystems, Aircraft Survivability Equipment, 2nd Generation FLIR, CH-47D Product Improvements, and Aircraft Avionics.

Institutional funds are also to be used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

 

519

AEESA

 

307

Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Programs.

Total

12557

 

FY 1998 Planned Program: Project not funded in FY 98

 

FY 1999 Planned Program: Project not funded in FY 99.

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

14033

12826

9074

8659

Appropriated Value

14424

12557

   

Adjustments to Appropriated Value

-55

     

FY 1998 Pres Bud Request

14369

12557

0

0

Change Summary Explanation: Funding consolidated into project DF30 effective FY 1998.

 

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D630

TECOM Test Design and Evaluation

3871

4685

0

0

0

0

0

0

0

8556

A. Mission Description and Justification: Project D630 TECOM Test Design and Evaluation: This project provides for independent assessment of over 300 non-major systems. It encompasses design of developmental and initial production assessment plans, test design, and subsequent independent analysis and assessment reports in support of all acquisition milestones to include recommendations for type classification and materiel release of non-major systems. Includes some 125-150 independent assessment plans and reports annually in the areas of munitions, weapons, electronics, communications, electronic warfare training devices, automotive and engineering equipment, bridging, clothing and individual equipment and chemical detection alarms and protection equipment. It also provides for HQ TECOM’s test management, safety assessment/verification and, in FY97, Test Integration functions in support of the Army’s new Integrated T&E process.

FY 1996 Accomplishments:

 

2206

Continued test design and assessment program, addressing new developments, production, and materiel changes. Program items included:

  • Close Combat Tactical Trainer Inflatable Body and Head Restraint System
  • Joint Tactical Ground Station Digital Topographic Support System/Quick Response Multicolor Printer
  • Combat Service Support Training System Driver’s Vision Enhancer
  • Electro-Optic Helmet Sight System Launched Grapnel Hook
  • Vehicular Intercommunications System Heavy Assault Bridge System
  • Advanced Battle Dress Overgarment (JSLIST) Vapor Protective Flame Resistant Undergarment (JSLIST)
  • Land Warrior C-17 Transport, Army Interface
  • Improved Chemical Glove Biological Point Detector
  • Self-Contained Toxic Environmental Protection (TAP) Suit Automatic Chemical Agent Alarm
  • Individual Soldier Enhanced Ration Force Provider
  • Advanced Combat Vehicle Crewman Helmet Truck, 2-1/2 Ton Extended Service Program
 

1665

Test management and safety assessment/verification

Total

3871

 

 

FY 1997 Planned Program:

2321

Continue test design and assessment program, addressing new developments, production, and materiel changes. Programmed items include:

  • Aviation Combined Arms Tactical Trainer Air Traffic Navigation and Communication System
  • Army Key Management System Mobile Automated Instrumentation Suite
  • Tactical Standoff Biological Detector Joint Service Lightweight Integrated Suit Technology (JSLIST)
  • Deployable Universal Combat Earthmover Containerized Kitchen
  • Air Warrior Remote Activation Munitions System
  • Airborne Standoff Minefield Detection System Handheld Mine Detection System
  • Close Combat Tactical Trainer Selectable Lightweight Attack Munition
  • Land Warrior Multiple Integrated Laser Engagement System - 2000
  • SHORTSTOP IEW Common Sensor
 

2310

Integrated test planning and safety assessment/verification

 

54

Small Business Innovation Research/Small Business Technology Transfer (SBIR/STTR) Programs..

Total

4685

 

FY 1998 Planned Program: Project not funded in FY 98

FY 1999 Planned Program: Project not funded in FY 99

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

4623

4785

4937

5094

Appropriated Value

4753

4685

   

Adjustments to Appropriate Value

-882

     

FY 1998 Pres Bud Request

3871

4685

0

0

Change Summary Explanation:

Funding: FY 1996 decreased (-882); (-130) undistributed Congressional reductions and rescissions; and (-752) reprogrammed to fund higher priorities.

FY 1998 - The test design and assessment portion of this project (-2371) was realigned to project D699 upon the transfer of the Test Design and Evaluation function to the US Army Operational Test and Evaluation Command. The remaining portion of this project (-2566), which supports HQ TECOM integrated test planning and safety assessment/verification functions, was consolidated into project DF30 effective FY 1998.

FY 1999 - These efforts transferred to projects D699 and DF30 (-5094).

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D632

Redstone Technical Test Center

2644

1545

0

0

0

0

0

0

0

4189

A. Mission Description and Justification: Project D632 Redstone Technical Test Center: Redstone Technical Test Center (RTTC), Redstone Arsenal, AL provides technical test expertise, facilities and capabilities for conduct of research, development, production and post-production testing of missiles, rockets, and low energy/precision guidance lasers. RTTC conducts system level tests on small rockets and missiles and component/subsystem tests for all categories of Army rockets, guided missiles, and associated equipment. RTTC is the Army lightning tester for hazardous/explosive materials. Major capabilities include a) extensive component/subsystem test facilities, b) ranges for flight testing small missiles and evaluating warhead effects, c) rocket motor static test stands, and d) facilities for climatic, vibration, shock, and electromagnetic environmental effects testing. RTTC is the Product Assurance tester for the Army’s Missile Command for repair parts testing and evaluating missile stockpile reliability at storage sites around the world. Through stockpile reliability testing, missile shelf life extension has resulted in cost avoidance greater than $7.9 billion. It also provides for leverage, integration and use of virtual and synthetic test tools/capabilities for reduction of test and program acquisition costs.

 

FY 1996 Accomplishments:

 

2644

Some of the largest system level programs tested are:

JAVELIN, Missile Repair Parts, TOW Improved Target Acquisition System, Air to Ground Missile System, and Multiple Launch Rocket System.

Total

2644

 

FY 1997 Planned Program:

 

1545

Some of the key systems programmed for testing are:

Unmanned Ground Vehicle, Brilliant Anti-Armor Submunition (BAT), MLRS Family of Munitions, PATRIOT Advanced Configurations, Army Tactical Missile System Block Improvements, JAVELIN, TOW missile and target acquisition systems, and Missile Repair Parts.

Institutional funds are also to be used to modernize test facilities and equipment to maintain current test capabilities and improve the safety, environmental, efficiency, and technological aspects of test operations.

Total

1545

 

FY 1998 Planned Program: Funding consolidated under project DF30.

FY 1999 Planned Program: Funding consolidated under project DF30.

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

1060

1578

1178

1591

Appropriated Value

1090

1545

   

Adjustments to Appropriated Value

+1554

     

FY 1998 Pres Bud Request

2644

1545

0

0

 

 

Change Summary Explanation:

Funding: FY 1996 increased (+1554 ) for reprioritization of the Army’s modernization programs and development of the

Virtual Proving Ground. Project consolidated into project DF30, effective FY 1998.

COST (In Thousands)

FY 1996 Actual

FY 1997 Estimate

FY 1998 Estimate

FY 1999 Estimate

FY 2000 Estimate

FY 2001 Estimate

FY 2002 Estimate

FY 2003 Estimate

Cost to Complete

Total Cost

D699

Non-Major Systems Test Design & Evaluation

0

0

2389

1966

1496

1522

1550

1581

Continuing

Continuing

A. Mission Description and Justification: Project D699, Non-Major Systems Test Design and Evaluation: This is not a new start. It is the continuation of the Independent Test Design and Assessment effort previously funded in project D630 and realigned to US Army Operational Test and Evaluation Command (OPTEC) as part of the Army’s consolidation of the materiel evaluation mission. Project D699 provides for independent developmental evaluation of all Army non-major systems. This project supports integrated Army evaluation for decision makers at milestone reviews, includes the development of test design, evaluation plans, and subsequent independent evaluations of all acquisition milestones to include recommendations for type classification and materiel release of non-major systems. Evaluation results will be incorporated into a single Army evaluation and presented at all acquisition milestones.

FY 1998 Planned Program:

 

2389

Continue test design and evaluation programs, addressing new developments, production, and materiel changes. Programmed items include:

  • Non-Lethal Ammo Family Suite of Integrated Radio Frequency Countermeasures
  • TRAILBLAZER Sorbont Decontamination System
  • Air Warrior Mounted Warrior
  • Modular Body Armor Armored Security Vehicle

- Joint Biological Detector Counter Proliferation Long Range Biological Standoff Detector

Total

2389

 

FY 1999 Planned Program:

 

1966

Continue test design and evaluation programs, addressing new developments, production, and material changes. Programmed items include:

  • WARSIM 2000 Simulation Special Driver’s Air Support System
  • Special Operations Forces Demolition Kit Advanced Integrated Collective Protection System
  • Joint Biological Detector Modular Decon System

Total

1966

 

 

B. Project Change Summary

FY 1996

FY 1997

FY 1998

FY 1999

FY 1997 President’s Budget

0

0

0

0

Appropriated Value

0

     

Adjustments to Appropriated Value

       

FY 1998 Pres Bud Request

0

0

2389

1966

Change Summary Explanation: Funding: Reflects realignment of the test design and assessment function from project D630.