(U) COST: (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

 

 

 

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                       

L2097

Manpower, Personnel, and Training

                   
   

262

240

252

291

298

305

312

319

CONT.

CONT.

M0106

Naval Medical Support Capability

                   
   

104

96

103

119

121

124

127

130

CONT.

CONT.

R0132

CNO Program Analysis and Evaluation

                   
   

1,600

232

262

308

316

323

330

337

CONT.

CONT.

R0133

National Academy of Sciences/Naval Studies Board

                   
   

1,476

2,134

2,376

2,397

2,410

2,408

2,460

2,516

CONT.

CONT.

R0147

Operational Strategic and Tactical Effectiveness Analysis

                   
   

381

355

403

471

482

492

503

515

CONT.

CONT.

R2040

Foreign Ship and Submarine Vulnerability Program

                   
   

0

0

0

0

0

0

0

0

0

2,403

S2233

Naval Surface Warfare Studies

                   
   

1,737

1,607

1,951

2,185

2,240

2,286

2,329

2,378

CONT.

CONT.

W2092

Naval Aviation Studies

                   
   

1,998

2,015

3,408

3,493

2,030

2,050

2,086

2,140

CONT.

CONT.

                       

TOTAL

 

7,558

6,679

8,755

9,264

7,897

7,988

8,147

8,335

CONT.

CONT.

(U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This program provides analytical support to the Secretary of the Navy and the Chief of Naval Operations as a basis for major policy, planning and acquisition program execution decisions. It supports research and development strategy development and planning. It supports studies in the areas of manpower, personnel, training, and aviation. It also develops analytical tools for evaluating effectiveness of U.S. weapons against potential foreign threat ships and submarines.

U) JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under RDT&E MANAGEMENT SUPPORT because it supports the

operations and installations required for general research and development use.

(U) COST: (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

 

 

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                       

L2097

Manpower, Personnel and Training

                   
   

262

240

252

291

298

305

312

319

CONT.

CONT.

                       

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Chief of Naval Personnel has an ongoing need for direct analyses of Navy manpower and personnel (MP) policies and program planning. This project provides an essential management tool to: (a) assess the effectiveness of existing MP policies and programs, (b) identify needs for new policies and programs, (c) determine the required manpower and training mix relative to changing demographic, societal and legislative/regulatory trends, and to evolving strategic and geopolitical factors, (d) study the impact of MP programs on Navy accession, retention, and performance, and (e) develop, validate and/or refine a broad range of MP forecasting models. The program permits Navy to more effectively utilize Research and Development expertise to respond to emerging MP problems.

1. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($55K) Conducted a study comparing the ability requirements implied by the accession plan with the qualifications for assignment to A-school.

• (U) ($96K) Started a manpower modeling and simulation study to accurately determine shipboard manpower requirements.

• (U) ($41K) Conducted an analysis and validation of the precision of the Onboard All Year Model in predicting outyear PCS cost moves requirements.

• (U) ($50K) Conducted analysis of Navy Violence Control and Prevention programs.

• (U) ($20K) Initiated survey and study to support the Chief of Naval Operations’ (CNO) Homesteading/Homebasing Initiative.

2. (U) FY 1997 PLAN:

• (U) ($87K) Conduct study to determine Time-on-Station metric for Permanent Change of Station (PCS) cost control.

• (U) ($65K) Conduct Analysis of Aviation Career Incentive Pay (ACIP) to access continuation of bonus pay.

• (U) ($68K) Conduct study to determine realistic accession quality requirements.

• (U) ($28K) Conduct study to evaluate appropriate multiple Armed Services Vocational Aptitude Battery (ASVAB) cut-

score requirements for "A" Schools.

• (U) (-$10K) Undistributed adjustment for NWCF Surcharge and General reductions.

• (U) ($2K) Portion of program reserved for Small Business Innovation Research assessments in accordance with 15

USC 638.

3. (U) FY 1998 PLAN:

4. (U) FY 1999 PLAN:

 

 

 

 

 

 

 

B. (U) PROGRAM CHANGE SUMMARY:

   

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

 

266

250

254

293

           

(U) Adjustments from FY 1997 PRESBUDG:

 

-4

-10

-2

-2

           

(U) 1998/99 President’s Budget:

 

262

240

252

291

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: Reductions of (-4K) in FY96, (-10K) in FY97, (-2K) in FY98, and (-2K) in FY 99 are due to Navy Working Capital Fund (NWCF) rate adjustments and SBIR assessments.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

 

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E:

(U) PE 0603707N (Manpower, Personnel, and Training Advanced Technology Development)

(U) PE 0604703N (Manpower, Personnel, Training, Simulation and Human Factors)

(U) PE 0602234N (Materials, Electronics and Computer Technology)

 

D. (U) SCHEDULE PROFILE: Not applicable.

(U) COST (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

 

 

 

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                       

M0106

Naval Medical Support Capability

                   
   

104

96

103

119

121

124

127

130

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project provides validated data to identify the root causes of problems and to optimize services associated with the health care delivery to Navy and Marine Corps personnel afloat and in contingency operations. This usually requires database and model development and statistical analyses of inter-related requirements or operational variables, and their impact on performance. The analysis of these variables requires a combination of medical/technical knowledge and operational perspectives.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

2. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($79K) Entered the data from survey returned by women who visited any of three major Naval hospitals in 1993 as pregnant active-duty Navy women. Commenced analysis of survey data to assess risk-factor information, pregnancy outcome, gestational age, and birth weight. Produced technical report on the analysis of the hospitalization data of all hospitalized pregnancy conclusions of Navy women in Navy military treatment facilities (MTFs) between 1982 and 1992. Results included the determination of pregnancy outcome rates in Navy enlisted women, and the identification of E1s as high-risk group for early fetal death outcomes.

3. (U) FY 1997 PLAN:

• (U) ($96K) Establish a database from multiple sources and examine the relationships between completed suicides, gestures, and attempts, and organizational and environmental factors in the Navy and Marine Corps to identify risk factors and opportunities for intervention.

4. (U) FY 1998 PLAN:

5. (U) FY 1999 PLAN:

 

 

 

 

 

 

 

 

B. (U) PROGRAM CHANGE SUMMARY:

 

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

 

105

100

103

119

           

(U) Adjustments from FY 1997 PRESBUDG:

 

-1

-4

0

0

           

(U) 1998/99 President’s Budget:

 

104

96

103

119

 

 

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: Reductions of $1 thousand in FY96 and $4 thousand in FY97 are the result of minor pricing adjustments.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.

D. (U) SCHEDULE PROFILE: Not applicable.

(U) COST: (Dollars in Thousands)

 

PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                     

R0132

CNO Program Analysis and Evaluation

                 
 

1,600

232

262

308

316

323

330

337

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project provides analytical support to the Chief of Naval Operations and the Secretary of the Navy in evaluation of overall balance within total Navy programs. This includes such tasks as: (a) evaluation of force capabilities and requirements; (b) analysis of effectiveness of systems under development; (c) Secretary of Defense directed independent cost and effectiveness analyses of major Navy programs; and (d) items of Congressional interest as they relate to Navy programs. Deliverables consist of formal, structured documents containing or leading to conclusions and/or recommendations as well as the development and maintenance of databases and models. The use of databases and models is driven by the need to objectively and continually assess the impact of reduced funding and/or force drawdown upon Navy programs. They provide Navy planners and decision makers with objective, empirical data with which to make determinations regarding program planning and evaluation of issues. The models funded by this account are the primary tools used to formulate program balance in the assessment process (particularly the Readiness, Support and Infrastructure Assessment and the Investment Balance Review). The analyses based on these models form the heart of the Investment Balance Review, allowing the Navy to formulate and cost-out alternative force structure, manpower, infrastructure and readiness programs.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($200) Maintained the Aviation Readiness model and the Ships Resource-to-Readiness model

2. (U) FY 1997 PLAN:

• (U) ($206) Maintain the Aviation Readiness model and the Ships Resource-to-Readiness model

3. (U) FY 1998 PLAN:

4. (U) FY 1999 PLAN:

B. (U) PROGRAM CHANGE SUMMARY:

 

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

262

258

264

310

         

(U) Adjustments from FY 1997 PRESBUDG:

+1,338

-26

-2

-2

         

(U) FY 1998/1999 President’s Budget:

1,600

232

262

308

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 adjustment is due to Jordanian rescission (-12), administrative and personal services rescission (-7), below threshold reprogramming for DOD Deskbook (+1,400), below threshold reprogramming for Strategic Studies Group (-50), and update to reflect actual execution (+7). FY1997 adjustment is due to Congressional Undistributed reductions (-26). FY1998 adjustment is due to NWCF adjustment (-1) and inflation (-1). FY1999 adjustment is due to Navy Working Capital Fund (NWCF) adjustment (-1) and inflation (-1).

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E:

(U) PE 0605154N (Center for Naval Analysis)

(U) PE 0605873M (Marine Corps Program Wide Support)

D. (U) SCHEDULE PROFILE: Not applicable.

(U) COST: (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                     

R0133

National Academy of Sciences/Naval Studies Board

                 
 

1,476

2,134

2,376

2,397

2,410

2,408

2,460

2,516

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project supports the core program for the Naval Studies Board. As agreed upon between the Chief of Naval Operations (CNO) and the President of the National Academy of Sciences and with appropriate attention to the influence of the domestic economy, national objectives, social imperatives and anticipated military requirement, the Naval Studies Board will conduct and report upon surveys, investigations, and analyses in the field of scientific research and development applicable to the operation and function of the Navy. Reports consist of a briefing to the Assistant Secretary of the Navy (Research Development and Acquisition) (ASN (RD&A)) and the CNO and staff, and written technical reports.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($583) Continued research efforts and investigations in areas of interest to the Navy. Continued to support annual Navy authorized activities of importance, such as the Annual Classified Military Space Symposium and the Weinblum Memorial Lecture Series.

• (U) ($893) Produced on-going investigations of significant importance to the Navy concerning technology of the future, selected from proposals received from CNO and ASN (RD&A).

2. (U) FY 1997 PLAN:

• (U) ($600) Continue research efforts and investigations in areas of interest to the Navy. Continue to support annual Navy authorized activities of importance, such as the Annual Classified Military Space Symposium and the Weinblum Memorial Lecture Series.

• (U) ($1,478) Produce investigations of significant importance to the Navy concerning technology of the future. Conduct two high payoff studies selected from proposals received from CNO and ASN(RD&A).

• (U) ($56) Portion of entramural program reserved for Small Business Innovation Research assessment in accordance

with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

4. (U) FY 1999 PLAN:

 

 

 

 

 

 

B. (U) PROGRAM CHANGE SUMMARY:

 

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

1,957

2,375

2,388

2,419

         

(U) Adjustments from FY 1997 PRESBUDG:

-481

-241

-12

-22

         

(U) FY 1998/1999 President’s Budget:

1,476

2,134

2,376

2,397

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 adjustment is due to Jordanian rescission (-2), administrative and personal services rescission (-23), SBIR assessment (-44), and update to reflect actual execution (-412). FY1997 adjustment is due to Congressional Undistributed reductions (-241). FY 1998 decrease is due to NWCF adjustment (-6) and inflation (-6). FY 1999 decrease is due to Navy Working Capital Fund (NWCF) adjustment (-13) and inflation (-9).

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.

D. (U) SCHEDULE PROFILE: Not applicable.

(U) COST: (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                     

R0147

Operational Strategic and Tactical Effectiveness Analysis

                 
 

381

355

403

471

482

492

503

515

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project provides the Chief of Naval Operations and the Secretary of the Navy direct analyses of Navy policy, strategy acquisition, and program planning in meeting the following objectives: (a) producing study results impacting upon important programs/issues; (b) identifying and evaluating policy and strategy alternatives and doctrine; and (c) evaluating the capabilities of programmed forces to accomplish missions assigned to the Navy. Deliverables consist of formal, structured documents containing or leading to conclusions and/or recommendations as well as the development and maintenance of databases and models. This project directly supports and is critical for conducting the Navy's joint mission assessments.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 PLAN:

• (U) ($329) Conducted reviews of the Capability Resource Allocation Display (CAPRAD) Database and performed econometric/statistical analyses on the impact of changes resulting from downsizing and programmatic changes. Updated and revalidated the Integrated Program Assessment System (IPAS) and other models in order to run these programs using revised allocation displays.

• (U) ($52) Conducted studies and provide enhancements to Integrated Theater Engagement Model (ITEM), the primary tool for campaign analysis for Assessments.

2. (U) FY 1997 PLAN:

• (U) ($321) Conduct reviews of the CAPRAD Database and perform econometric/statistical analyses on the impact of changes resulting from downsizing and programmatic changes. Also update and revalidate the IPAS and other models in order to run these programs using revised allocation displays.

• (U) ($20) Conduct studies and provide enhancements to ITEM, the primary tool for campaign analysis for Assessments.

• (U) ($14) Portion of extramural program reserved for Small Business Innovation Research assessment in accordance

with 15 U.S.C. 638.

3. (U) FY 1998 PLAN:

4. (U) FY 1999 PLAN:

 

 

B. (U) PROGRAM CHANGE SUMMARY:

 

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

403

393

405

474

         

(U) Adjustments from FY 1997 PRESBUDG:

-22

-38

-2

-3

         

(U) FY 1998/1999 President’s Budget:

381

355

403

471

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 adjustment is due to Jordanian rescission (-1), SBIR assessment (-14), and update to reflect actual execution (-7). FY 1997 adjustment is due to Congressional Undistributed Reductions (-38). FY 1998 decrease is due to Navy Working Capital Fund (NWCF) adjustment (-1) and inflation (-1). FY 1999 decrease is due to NWCF adjustment (-1) and inflation(-2).

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E:

(U) PE 0605154N (Center for Naval Analyses)

(U) PE 0605873M (Marine Corps Program Wide Support)

D. (U) SCHEDULE PROFILE: Not applicable.

(U) COST: (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

 

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FY 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                       

S2233

Naval Surface Warfare Studies

                   
   

1,737

1,607

1,951

2,185

2,240

2,286

2,329

2,378

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project provides for analysis of the warfighting capability of Naval forces by examining specific selected numbers and mixes of surface combatants and other forces that are subjected to representative operational situations in a joint littoral environment. The U.S. strategic emphasis has shifted from global containment and warfighting to a global stability strategy with regional focus. As part of an overall effort at addressing future Naval force levels and capabilities, the Navy must assess the warfighting effectiveness of different mixes of surface combatants in battle groups operating in a littoral warfare environment and develop an investment strategy that supports the capabilities required. Required Operational Capabilities/Projected Operational Environment (ROC/POE) must be updated every two years or created for new ship classes. These ROC/POE's are vitally important in that mission requirements for ships drive equipment configurations, manning levels and associated shipboard accommodations, tailor ship and staff missions, capabilities, manning to new strategies, tactics, operational environments, and policies.

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($1,737) Continued analyses to identify battle force capabilities considering various force mixes. These studies addressed the warfighting and national security policy and strategy requirements for effective, flexible and cost-efficient Naval Surface Warfare Forces, including the numbers and mixes of surface combatants and other forces that are subjected to representative operational situations in a joint littoral environment. Measures of Effectiveness were used in characterizing Naval Surface Warfare capabilities for battle space dominance and for power projection. The results were applied to campaign scenarios and operational situations to scope, focus and interpret the analyses. The results of these analyses were applied to the 21st century combatant (SC 21) Cost and Operational Effectiveness Analysis (COEA) and strategic planning and investment strategies for future Joint Littoral Warfare Naval Forces.

• (U) Obligations began in November 1995 and will complete June 1997.

2. (U) FY 1997 PLAN:

• (U) ($1,573) Continue analyses of Naval Surface Warfare capabilities required for battle space dominance and power projection. Littoral warfare requirements will continue to shape the definition of surface ship capabilities. These studies will be aimed at obtaining the required capabilities in an affordable and effective surface fleet. Revise ROC/POE instructions.

• (U) ($34) Portion of extramural program reserved for Small Business Innovation Research assessment in

accordance with 15 U.S.C. 638.

• (U) Obligations will initiate in October 1996 and will complete September 1997.

3. (U) FY 1998 PLAN:

4. (U) FY 1999 PLAN:

B. (U) PROGRAM CHANGE SUMMARY:

   

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

 

1,767

1,677

1,709

1,951

           

(U) Adjustments from FY 1997 PRESBUDG:

 

-30

-70

+242

+234

           

(U) FY 1998/1999 President’s Budget:

 

1,737

1,607

1,951

2,185

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 96 decrease reflects minor pricing adjustments. FY 97 decrease reflects Congressional undistributed reductions. FY 98 and FY99 increases are due to SC21 Arsenal Ship Studies.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.

A. (U) PROJECT COST BREAKDOWN: ($ in thousands)

Project Cost Categories FY 1996 FY 1997 FY 1998 FY 1999

a. Capabilities Analysis 1,737 1,607 1,951 2,185

Total 1,737 1,607 1,951 2,185

 

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS

Contractor/ Contract

Government Method/ Award/ Perform Project

Performing Fund Type Oblig Activity Office FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total

Activity Vehicle Date EAC EAC & Prior Budget Budget Program Budget Complete Program

Product Development

Various WR Various 830 350 180 385 433

Various RCP Various 258 685 736 667 749

Various Competitve Various 862 702 691 899 1,003 CONT. CONT.

Support and Management

Test and Evaluation

GOVERNMENT FURNISHED PROPERTY Not Applicable.

FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total

& Prior Budget Budget Budget Budget Complete Program

Subtotal Product Development 1,950 1,737 1,607 1,951 2,185 CONT. CONT.

Subtotal Support and Management

Subtotal Test and Evaluation

Total Project 1,950 1,737 1,607 1,951 2,185 CONT. CONT.

 

 

(U) COST (Dollars in Thousands)

PROJECT

NUMBER &

TITLE

 

FY 1996

ACTUAL

FY 1997

ESTIMATE

FY 1998

ESTIMATE

FY 1999

ESTIMATE

FY 2000

ESTIMATE

FY 2001

ESTIMATE

FY 2002

ESTIMATE

FYT 2003

ESTIMATE

TO

COMPLETE

TOTAL

PROGRAM

                       

W2092

Naval Aviation Studies

                   
   

1,998

2,015

3,408

3,493

2,030

2,050

2,086

2,140

CONT.

CONT.

A. (U) MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: This project supports studies over a wide range of naval aviation issues that support the ongoing Joint Strike Assessment (JSA) guidelines. Results provide a basis for recommendations to the Chief of Naval Operations concerning major policy, planning, and acquisition program decisions. This effort is a management initiative which will allow allocation of study resources in a timely manner according to priorities. This ongoing program will continue to leverage more detailed program specific analysis in order to gain insight in acquisition of various weapon systems and their impact on force structure, manning levels, operational readiness and Carrier Air Wing effectiveness. This program will also support various Cost and Operational Effectiveness Analysis (COEA) Studies.

 

(U) PROGRAM ACCOMPLISHMENTS AND PLANS:

1. (U) FY 1996 ACCOMPLISHMENTS:

• (U) ($300) Conducted analyses of joint theater ballistic missile defense operations in support of United States Commander in Chief, Pacific Forces Korea with Army, Air Force, Ballistic Missile Defense Office, Joint Transfer Missile Defense personnel utilizing the Weapons and Tactics Analysis Center (WEPTAC).

• (U) ($200) Initiated Tactical Imaging Reconnaissance and Surveillance study to define the Navy’s plan to meet various operational goals of collecting and disseminating imagery for the next 25 years.

• (U) ($698) Conducted the first phase of a two year effort to determine the mission requirements for a Common Support Aircraft (CSA) which will lead to a Milestone 0 decision.

• (U) ($430) Conducted studies and supported the Joint Strike Assessment process including a study which analyzed alternatives for Naval Aviation squadron reorganization for the E-2/C-2, ES-3/S-3, FA-18 and P-3/EP-3/Reef Point communities, carrier sortie generation, FA-18E/F survivability.

• (U) ($230) Conducted analyses of unified Commander in Chief's Theater Ballistic Missile Defense (TBMD) Attack Operations concepts as part of the Tri-Service TBMD Attack Operations leading to the development of a Navy concept of operations with the Navy Doctrine Command.

• (U) ($140) Initiate an effort to analyze and develop a decision support tool, the Naval Aviation Training Support System (NATSS), which will interface with training and readiness databases to better allocate training resources.

2. (U) FY 1997 PLAN:

• (U) ($150) Continue and expand analyses of TACAIR and weapons effectiveness including tradeoffs of development and acquisition alternatives utilizing the WEPTAC modeling and simulation (M&S) facility. Perform sensitivity analyses utilizing additional M&S tools as required.

• (U) ($185) Continue and complete development of the flight hour program which supports the Naval Aviation Training Support System (NATSS).

• (U) ($400) Continue studies to support JSA issues for the current and follow-on cycle.

• (U) ($994) Continue and complete the CSA study leading to a Milestone 0 decision.

• (U) ($200) Continue and complete a Tactical Imaging Reconnaissance and Surveillance study to define the Navy’s plan to meet various operational goals of collecting and disseminating imagery for the next 25 years.

• (U) ($55) Provide support for aviation related COEAs and studies within NAVAIR and OPNAV.

• (U) ($31) Portion of Program reserved for Small Business Innovation Research (SBIR) assessment in accordance with 15 U.S.C. 638.

 

3. (U) FY 1998 PLAN:

Based Aircraft (LLBA) as a potentially common follow-on to the E-6, EP-3, P-3, C-130 and C-9 aircraft. This study will lead to a Milestone O decision.

4. (U) FY 1999 PLAN:

 

 

B. (U) PROGRAM CHANGE SUMMARY:

   

FY 1996

FY 1997

FY 1998

FY 1999

(U) FY 1997 President’s Budget:

 

2,018

2,121

2,000

2,032

           

(U) Adjustments from Pres Budget:

 

-20

-106

+1,408

+1,461

           

(U) FY 1998/99 President’s Budget:

 

1,998

2,015

3,408

3,493

(U) CHANGE SUMMARY EXPLANATION:

(U) Funding: FY 1996 decrease reflects $2 thousand for the F-16 Jordanian Rescission and $18 thousand for the SBIR assessment. FY 1997 decrease reflects Congressional undistributed reductions. FY 1998 net increase includes $1,500 thousand for the LLBA COEA, partially offset by decreases of $70 thousand for Navy Working Capital Fund (NWCF) carryover and rates and $22 thousand for repricing. The FY 1999 net increase includes $1,500 thousand for the LLBA COEA, partially offset by decreases of $14 thousand for NWCF carryover and rates and $25 thousand for repricing.

(U) Schedule: Not applicable.

(U) Technical: Not applicable.

C. (U) OTHER PROGRAM FUNDING SUMMARY: Not applicable.

(U) RELATED RDT&E: Not applicable.

D. (U) SCHEDULE PROFILE: Not applicable.

 

A. (U) PROJECT COST BREAKDOWN: ($ in thousands)

Project Cost Categories FY 1996 FY 1997 FY 1998 FY 1999

a. Systems Engineering 1,748 1,733 2,931 3,004

b. Government Engineering Support 195 231 457 469

c. Travel 55 20 20 20

d. SBIR 0 31 0 0

Total 1,998 2,015 3,408 3,493

 

B. (U) BUDGET ACQUISITION HISTORY AND PLANNING INFORMATION ($ in thousands)

PERFORMING ORGANIZATIONS

Contractor/ Contract

Government Method/ Award/ Perform Project Total

Performing Fund Type Oblig Activity Office FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total

Activity Vehicle Date EAC EAC & Prior Actual Budget Budget Budget Complete Program

Product Development

All efforts totalling less than $2M (aggregate 1611 1934 1995 3,388 3,473 CONT. CONT.

total) MISC

Support and Management

Travel 25 55 20 20 20 CONT. CONT.

Test and Evaluation: Not applicable.

GOVERNMENT FURNISHED PROPERTY Not Applicable.

 

 

 

 

 

 

 

 

 

 

 

 

FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 To Total

& Prior Budget Budget Budget Budget Complete Program

Subtotal Product Development 1,611 1,943 1,964 3,388 3,473 CONT. CONT.

Subtotal Support and Management 25 55 20 20 20 CONT. CONT.

Subtotal Test and Evaluation 0 0 0 0 0 0 0

SBIR Assessment 0 0 31 0 0 0 31

Total Project 1,636 1,998 2,015 3,408 3,493 CONT. CONT.