DeliverFunctionalSourceClassification
ToAreaOPRofDateTitleVersionHardSoftRemarks
TICDocumentCopyCopy
1YesSystemTask 18FOUO03-Oct-95BMDO Directive 5230-M, Ballistic Missile Defense ProgramFinalYesNoDelivered to TIC 21 Oct 96
Security Classification Guide
2YesSystemTask 18FOUO21-Dec-95National Missile Defense (NMD) Security Classification GuideFinalYesNoDelivered to TIC 21 Oct 96
3YesSystemBMDO/TR/RUnclassified30-Sep-96NMD Acquisition Strategy BriefingFinalYesNoDelivered to TIC, 28 Oct 96
4YesSystemBMDO/TRESecret17-Sep-96NMD System Requirements Document PrelimNoyesDelivered to TIC 21 Oct 96
(TRW CDRL C002) (U)DraftProvided on CD ROM
5YesSystemBMDO/TRESecret10-Sep-96BMDO Briefing: NMD Capability 2 System RequirementsFinalYesNoDelivered to TIC 21 Oct 96
Review (SRR) (U)
6YesSystemBMDO/TRESecret01-Oct-96National Missile Defense System Threat Assessment (STA) (U)FinalYesNoDelivered to TIC 21 Oct 96
7YesSystemBMDO/TRESecret04-Oct-96BMDO/TRE Briefing, NMD Scenarios Update (U)FinalYesNoDelivered to TIC 21 Oct 96
8YesSystemBMDO/TREUnclassifiedSep-96NMD Cost Analysis/Estimating Terms of ReferenceDraftYesNoAdded by A. Murray
(TOR) Version 1.0Delivered to TIC, 31 Oct 96
9YesSystemBMDO/TREUnclassified29-Oct-96SE&I CARDDraftNoYesAdded by Joint Service Team
10YesSystemBMDO/TRESecret17-Sep-96NMD Interface Requirements Document PrelimNoYesDelivered to TIC 21 Oct 96
(TRW CDRL C004) (U)DraftProvided on CD ROM
11YesSystemBMDO/TREUnclassified12-Sep-96Master Integrated Prog Schedule (MIPS) (TRW CDRL A006)FinalYesNoDelivered to TIC 28 Oct 96
Revision 0
12YesSystemBMDO/TREUnclassifiedAug-96Configuration Management Plan (TRW CDRL A022)TBDYesNoSuggested by BMDO TRE ( K. Englander)
13YesSystemBMDO/TREUnclassifiedAug-96NMD Risk Management Plan (TRW C009)TBDYesNoSuggested by BMDO TRE ( K. Englander)
14YesSystemBMDO/TREUnclassified18-Oct-96NMD Integrated System Demonstration ObjectivesDraftYesYesSuggested by BMDO TRE ( K. Englander)
(TRW CDRL C027)Jim LoJacono delivered, 30 Oct 96
15YesSystemBMDO/TRLUnclassifiedSep-96Ballistic Missile Defense Acquisition Logistics Policy AKADraftYesYesFrom Mr. Leary, BMDO/TRL
BMDO Directive No. 5005Delivered to TIC 25 Oct 96
16YesSystemBMDO/TRLUnclassified06-Oct-96NMD System Contingency Deployment Plan (CDP)Initial DraftYesYesFrom Mr. Leary, BMDO/TRL
17YesSystemBMDO/TRLFOUO02-Jan-96Study for Potential North Dakota Anti-Ballistic Missile FinalYesYesFrom Mr. Leary, BMDO/TRL
Treaty Compliant National Missile Defense SystemDelivered to TIC 21 Oct 96
Deployment Sites
18YesSystemBMDO/TRLUnclassified29-Oct-96System Common CARDDraftYesYesFrom Mr. Leary, BMDO/TRL
19YesSystemBMDO/TRNFOUO21-Oct-96Test & Evaluation Master Plan for the NMD SystemDraftYesNoSuggested by Dan Bond, Task 4 SETA
Version 8 (Draft)Delivered 21 Oct 96
20YesSystemUSSPACECOMSecret19-Aug-96NMD Concept of Operations ("Preliminary" Draft) (U)DraftYesYesAdded by Joint Service Team
21YesSystemUSSPACECOMSecret27-Feb-96National Ballistic Missile Defense (NBMD) CapstoneFinalYesYesAdded by Joint Service Team
Requirements Document (CDR) (U)Delivered To TIC, 1 Nov 96
22YesBMC3BMDO/TRBUnclassified18-Oct-96NMD BMC3 CARDForYesNoComing from Rita Spaventa (T.O. 3)
CommentDelivered to TIC 28 Oct 96
Draft
23YesBMC3BMDO/TRBUnclassified20-Sep-96Draft BMC3 Capability Increment (CI) Plan DraftYesNoProvided by R. Spaventa
(TRW CDRL D016), Revision 1Delivered to TIC 25 Oct 96
24YesGBI/MmanICBM SPOUnclassified20-Feb-96ICD 25-R001 Interface Control - Rack, Electrical Equipment,Final3 Microfiche, 174 pages
(Minuteman)MT-6900(V) 1/G, Computer, Digital, CP-2076(V) 1/GSW
25YesGBI/MmanICBM SPOUnclassified31-Oct-95ICD 25-R007 Interface Control - Rack, Electrical EquipmentFinal3 Microfiche, 197 pages
(Minuteman)MT-6900(V) 2/G, Computer, Digital, CP-2076(V) 2/GSW
26YesGBI/MmanICBM SPOUnclassified18-Jun-96ICD 25-R051 Interface Control Higher Authority CommunicationsFinal2 Microfiche, 93 pages
(Minuteman)Integration and Control and Rapid Message Processing Element
27YesGBI/MmanICBM SPOUnclassified28-Nov-95ICD D25-R017 Interface Control - Rack, Electronically EquipmentFinal1 Microfiche, 60 pages
(Minuteman)MT-6900 (V) /G, Computer, Digital, CP-2076(V)/GSW
28YesGBI/MmanICBM SPOUnclassified22-Dec-76ICD D25 60135 Interface Control - WGS to PSRE - Functional Final1 Microfiche, 20 pages
29YesGBI/MmanICBM SPOUnclassified07-Feb-96Volume I - ICD D25-65000 Interface Control LF OperationsFinal3 Microfiche, 102 pages
(Minuteman) - Programming and Timing
30YesGBI/MmanICBM SPOUnclassified07-Nov-78Volume 2 - ICD D25-65000 - LF operations - ProgrammingFinal3 Microfiche, 143 pages
(Minuteman) and Timing
31YesGBI/MmanICBM SPOUnclassified08-Aug-96Volume IV - ICD D25-65000 - Interface Control - LF Operations Final3 Microfiche, 137 pages
(Minuteman)Programming and Timing
32YesGBI/MmanICBM SPOUnclassified16-Sep-85Volume V - ICD D25-65000 - Interface Control - LF Operations -Final3 Microfiche, 170 pages
(Minuteman) Programming and Timing
33YesGBI/MmanICBM SPOUnclassified24-Sep-85Volume VI -ICD D25-65000 - Interface Control - LF OperationsFinal3 Microfiche, 136 pages
(Minuteman) Programming and Timing
34YesGBI/MmanICBM SPOUnclassified18-Sep-84Volume 7 - ICD D25-65000 - LF Operations - Programming Final3 Microfiche, 157 pages
(Minuteman) and Timing
35YesGBI/MmanICBM SPOUnclassified09-Dec-92Volume VIII - ICD D25-65000 - Interface Control - LF Operations -Final3 Microfiche, 154 pages
(Minuteman) Programming and Timing
36YesGBI/MmanICBM SPOUnclassified20-Jun-96Volume IX - ICD D25-65000 - Interface Control - LF Operations -Final3 Microfiche, 160 pages
(Minuteman) Programming and Timing
37YesGBI/MmanICBM SPOUnclassifiedUndated Volume XI - ICD D25-65000 - Back-Up SheetFinal1 Microfiche, under 10 pages
38YesGBI/MmanICBM SPOUnclassified18-Jul-94Volume I - ICD D25-65002 - Interface Control - LCF Operations/Final2 Microfiche, 88 pages
(Minuteman)LF Intertie Programming and Timing
39YesGBI/MmanICBM SPOUnclassified11-Apr-75Volume II - ICD D25-65002 - Interface Control - LCF Operations/Final2 Microfiche,95 pages
(Minuteman)LF Intertie Programming and Timing
40YesGBI/MmanICBM SPOUnclassified12-Sep-77Volume3 - ICD D25-65002 - Interface Control - LCF Operations/Final2 Microfiche, 90 pages
(Minuteman)LF Intertie Programming and Timing
41YesGBI/MmanICBM SPOUnclassified16-Sep-88Volume 4 - ICD D25-65002 - Interface Control - LCF Operations/Final2 Microfiche, 101 pages
(Minuteman)LF Intertie Programming and Timing
42YesGBI/MmanICBM SPOUnclassified16-Nov-94Volume V - ICD D25-65002 - Interface Control - LCF Operations/Final2 Microfiche, 117 pages
(Minuteman)LF Intertie Programming and Timing
43YesGBI/MmanICBM SPOUnclassified27-Jun-88Volume I - ICD D25-65007 - Interface Control - LF Operations/Final3 Microfiche, 239 pages
(Minuteman) Programming and Timing
44YesGBI/MmanICBM SPOUnclassified11-Aug-87Volume II - ICD D25-65007 - Interface Control - LF Operations/Final4 Microfiche, 215 pages
(Minuteman) Programming and Timing
45YesGBI/MmanICBM SPOUnclassified09-Mar-89Volume 3 - ICD D25-65007 - Interface Control - LF Operations/Final4 Microfiche, 221 pages
(Minuteman) Programming and Timing
46GBI/MmanUnclassified25-Mar-96Minuteman III Specification Tree WS 133 A/M and WS 133BFinal
47GBI/MmanUnclassified01-Apr-96MM III Spec Tree WS 133 A/M Launch FacilityFinal
48GBI/MmanUnclassified22-Mar-96MM III Spec Tree Ws 133 B Launch FacilityFinal
49GBI/MmanUnclassified25-Mar-96WS133A/M Missile Alert Facility and Hardened Intersite Cable SysFinal
50GBI/MmanUnclassified25-Mar-96WS133B Missile Alert Facility and Hardened Intersite Cable SysFinal
51GBI/MmanUnclassified01-Apr-96MM III Spec Tree Airborne Lanuch Control CenterFinal
52GBI/MmanUnclassified29-Feb-96MM III Spec Tree Code ProcessingFinal
53GBI/MmanUnclassified28-Feb-96MM III Spec Tree Reentry SystemFinal
54GBI/MmanUnclassified08-Mar-96MM III Spec Tree Guidance and Control Final
55GBI/MmanUnclassified12-Mar-96MM III Spec Tree Guided Missile Main AssemblageFinal
56GBI/MmanUnclassified12-Mar-96MM III Spec Tree Maintenance Support EquipmentFinal
57GBI/MmanUnclassified12-Mar-96MM III Spec Tree Depot Support EquipmentFinal
58GBI/MmanUnclassified12-Mar-96MM III Spec Tree TrainersFinal
59GBI/MmanUnclassified?System Test FacilitiesFinal
60GBI/MmanUnclassified13-Sep-96Prime Item Development Specification for Stage 1 for MinutemanFinal
ICBM (Draft)
61GBI/MmanUnclassified14-May-96Prime Item Development Specification for Motor, Rocket, SR-Final
19-AJ-1, Solid Propellant, Operational
62GBI/MmanUnclassified04-Sep-96MM III Stage 3, Propulsion Replacement Program, TechnologyFinal
Insertion Phase
63GBI/MmanUnclassifiedJul-96Minuteman Flight Analysis Report Glory Trip 158 GMFinal
64GBI/MmanUnclassified27-Sep-96GRP EMD Master Program ScheduleFinal
65GBI/MmanUnclassified04-Nov-96MM III Propulsion Replacement Program ScheduleFinal
66GBI/MmanUnclassifiedSep-96ICBM SPO Report 62-46-1 ICBM Interface Control DrawingsFinal
67GBI/MmanUnclassified10-Jul-96Tech Orders - Tech CodeFinal
68GBI/MmanUnclassified11-Apr-96Trainer ListingFinal
69GBI/MmanUnclassified15-Oct-96S-133-128C System Specification for MM IIIFinal
70GBI/MmanUnclassifiedMay-96ICBM SPO Briefing: MM Weapon System History & DescriptionFinal
71GBI/MmanUnclassifiedUndatedMinuteman Vandenberg AFB Missile ProcessingFinal
72GBI/MmanUnclassifiedSep-96ICBM Long Range Planning Logistics Programs ManagementFinal
Plan
73GBI/MmanUnclassifiedDec-96USAF Briefing: Evaluation of the AF NMD ArchitectureFinal
74GBI/MmanUnclassified06-Nov-95Sustaining Engineering GuideFinal
75GBI/MmanSecret19-Jan-96Sustainment Executive Management Report Final
Readiness Assessment (U)
76GBI/MmanSecret15-Oct-96System Specification for Minuteman III, Appendix 1Final
77GBI/MmanS-RD15-Oct-96System Specification for Minuteman III, Appendix IIIFinal
78NoGBIANMDUnclassified01-Apr-96Exoatmospheric Kill Vehicle (EKV) Program SK-K08-90FinalYesNoReceived by Fax. Need electronic or
(Common Scope of Work, Revision B, Common original paper copies for reproduction.
to both Hughes and Rockwell)
79NoGBIANMDUnclassifiedUndatedRockwell Briefing: GBI Executive Summary Schedule and FinalYesNoReceived by Fax. Need electronic or
IFT-3 EKV Payload Scheduleoriginal paper copies for reproduction.
80NoGBIANMDUnclassifiedUndatedHughes Briefing: EFT Overview / Schedule FinalYesNoReceived by Fax. Need electronic or
original paper copies for reproduction.
81YesGround-BasedAF/ESCSecret19-Jul-96HAVE STARE Radar Characteristics (U) FinalYesNoProvided by Ms Marrone (BMDO/TRE)
Sensor with Classified AttachmentDelivered 4 Nov 96
82YesGround-BasedAF/ESCUnclassified11-Sep-96Cost Analysis Requirements Description (CARD), Forward FinalYesNoAdded by Joint Service Team
SensorBased X-Band Radar
83YesGround-BasedAF/ESCUnclassified13-Sep-961996 Upgraded Early Warning Radar (UEWR) Cost Analysis DraftYesYesRecommended by ESC
SensorRequirements Description (CARD)E-mailed to TIC, 1 Nov 96
84 Ground-BasedUnclassified23-Sep-96National Missile Defense Advanced Early Warning RadarWorking
Sensor(NMD AEWR) Cost Analysis Requirements Description (CARD) Draft
Volume 1 (U)
Note: Classified NMD AEWR Annex will be included,
when available
85YesGround-BasedANMDSecret13-Sep-96National Missile defense Ground Based Radar (NMD GBR) TBDYesNoAdded by Joint Service Team
SensorCost Analysis Requirements Description (CARD) (U)Supplied by Maj Howard
86YesSpace-BasedBMDO/TRESecret 10-Oct-96SBIRS Requirements Correlation Matrix (U) FinalYesNoDelivered to TIC, 21 Oct 96
SensorNOFORN
87YesSpace-BasedUSSPACECOMSecret31-May-96Spaced-Based Infrared System (SBIRS) Operational DraftYesNoDelivered to TIC, 21 Oct 96
SensorRequirements Document (ORD) (U) 002-96-1 AFSPACECOM
Hq AFSPC/DRF
88YesSpace-BasedAF/SMC/MTUnclassified26-Aug-96Space-Based Infrared System Single Acquisition and FinalYesNoProvided by S. Conwell
SensorManagement Plan (SAMP)Delivered to TIC, 25 Oct 96