FAS | Space | Star Wars | Programs | Soviet |||| Index | Search |



ABM-1

In August 1953, seven Marshals of the Soviet Union, together with Chief of the General Staff V.D. Sokolovskiy, sent a memorandum to the CPSU Central Committee requesting it consider the possibility of creating ABM weapons. By 1955, proposals for a test-range missile defense prototype -- known as System "A" -- were prepared. A decision of the Council of Ministers on 17 August 1956 authorized work on antimissile defense and the creation of an experimental proving ground. By that time the location for a future proving ground had been found at Sary Shagan and the design was in progress. A nuclear test -- operation "K" -- was conducted in December 1956 at the Semipalatinsk Range, based on work conducted at KB-11 (now known as Arzamas-16) by Academician Yu.B. Khariton. This demonstrated that a fragmentation warhead of an antiballistic missile could be replaced with a nuclear warhead, significantly increasing an interceptor's kill radius and effectiveness.

The SKB-30 design bureau, headed by general designer Grigory Vasilyevich Kisunko developed the antimissile control system, precise guidance radar, command transmission station and other components. A group of design organizations: central-computer system - general designer academician Lebedev; early antimissile missiles - general designer P.D. Grushin; launchers - general designer I.I. Ivanov; antimissile guidance radar - general designer S.P. Rabinovich ; data transmission system - general designer F.P. Lipsman. Kisunko coordinated the activity of these organizations.

By 1961 the facilities at Sary Shagan needed for full-scale testing of system "A" were ready. By June 1961 Kisunko's team had completed the conceptual design of the A-35 ABM system designed to protect Moscow. The project called for a system to counter Titan-2 and Minuteman-2 single-warhead ballistic missiles. This system was to have a command post, eight radars forming a circular long-range detection field, and 32 firing complexes. In the fall of 1962, the conceptual design of the A-35 system was approved. A new conceptual design produced in 1964 reduced the number of firing complexes to 16, updated the functional principles of the system. The ABM-1 Galosh interceptor missile was paraded in Red Square in 1964, and characterized as an ABM interceptor. The missile has never been seen in public except in its launch container. An experimental model of the A-35 system -- the "Aldan" -- was created at the Sary Shagan range by 1967 for testing the system.

The components of the Moscow ABM- system include:

In the late 1960's construction started on eight launch sites for this system in the vicinity of Moscow, with four of these sites actually becoming operational. Construction and installation work was begun at the system installations: at the command post, Dunay-3 (chief designer V.P. Sosulnikov) and the improved Dunay-3U (chief designer A.N. Musatov) sector radars, and firing complexes. A technical base was created for preparing and maintaining the antiballistic missiles. Maximum use was made of the ring roads, cable communications links, and part of the other structures of the S-25 [SA-1] air defense system, which helped reduce spending on the new ABM weapon system. By 1971, four of the eight Dunay sector radars and eight of the 16 firing complexes had been built.

On the whole the performance of the Galosh appeared similar to that of the American Nike-Zeus. The use of mechanically steered radars and high yield nuclear warheads substantially limits the effectiveness of this system, which could be easily saturated by even a small attack. The A-35 system was unable to counter missiles with multiple warheads, especially under conditions of use of penetration aids such light and heavy decoy targets and active jammers, a fact which became obvious to the Soviets 1971. A decision was made, supported by the military-industrial commission (VPK), to finish building the facilities already started [the second Dunay-3U radar and at five firing complexes]. All the rest of the work for the rest of the was halted. The system was accepted only into experimental operation and essentially returned to industry for modernization. In 1972, the system passed state tests and was adopted for service. The interceptors in this system were on exposed surfaced-based launchers which always had missiles on them, fueled with corrosive propellant components and loaded with a multi-megaton nuclear warhead.

In 1973 general designer G.V. Kisunko developed a plan for modernizing the system. In the summer of 1975 Kisunko was relieved of his position as general designer by the Minister of the Radio Industry, P.S. Pleshakov. Thereafter Chief designer I.D. Omelchenko supervised the modernization work, and by May 1977 the A-35M ABM system was presented for state testing. In 1978 the improved A-35M defense system was commissioned and put on combat duty.

The antiballistic missiles were fueled with propellant components and equipped with a warhead only at the technical base. Electrically weighted mock-ups were installed at the launch positions. Delivery of the ABM missiles from the technical base to the exposed, ground-based launch positions in a crisis situation was reduced significantly.

In the late 1970's two of these sites were de-activated, in anticipation of subsequent upgrades. Each site has 16 launchers with associated radars and battle-management computers.


ABM Launch Site

Closeup of Galosh ABM Site

Typical ABM Launch Site



FAS | Space | Star Wars | Programs | Soviet |||| Index | Search |


http://www.fas.org/spp/starwars/programs/soviet/abm1.htm
Maintained by Webmaster

Updated Friday, September 15, 2000 6:49:51 PM